Fence Permit Requirements in High Point, NC

High Point is a city of 118,601 residents in North Carolina that follows the 2018 IRC. High Point is generally more lenient than the standard IRC when it comes to fence projects, more exemptions and fewer permit triggers. You're looking at roughly $40 – $160 in permit fees, plan on about 1 week for approval, plus you can apply online.

By Joey, Founder · Last verified March 29, 2026 · How we research →

Population: 118,601 Code: 2018 Verified: 2026-03-29 3 local rules

When you don’t need a Fence permit in High Point

Exempt·Rule 1

Backyard fences 6 feet or under typically do not require a building permit.

SourceCity of High Point Code / 2018 NC Building Code
Exempt·Rule 2

Front yard fences 4 feet or under typically do not require a permit but must comply with zoning.

SourceCity of High Point Code / 2018 NC Building Code

When you need a Fence permit in High Point

Required·Rule 1

Fences over 6 feet require a building permit.

Estimated Fee$40 – $160
Typical Timelineabout 1 week
SourceCity of High Point Code / 2018 NC Building Code

Fence Permit Costs: High Point vs. Nearby

High Point's fees are right in line with the North Carolina average, $40 – $160 versus $41 – $148 statewide.

CityEstimated Fee
High Point $40 – $160
Charlotte $50 – $200
Raleigh $50 – $200
Greensboro $50 – $200

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all High Point permit costs →

Zoning & HOA Considerations

Zoning

Front-yard fences and fences above certain heights may require zoning approval. Many cities limit front-yard fence height to 3–4 feet. Check setback and height limits with your planning department.

HOA Communities

If you live in an HOA community: hOAs frequently restrict fence materials, colors, heights, and styles, often more strictly than city code. Review your CC&Rs and submit to your Architectural Review Committee (ARC) before applying for a city permit.

Estimated Project Timeline in High Point

Here's a typical timeline for a fence project in High Point, NC:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to High Point's building department, apply online here.
Week 4
Plan review & approval
Typical processing time in High Point: about 1 week. Plan review examiner checks drawings for code compliance.
Week 5+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on High Point's typical about 1 week permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Fence permit in High Point, NC?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameInspections Services Department
Address211 South Hamilton Street, Room 316, High Point, NC 27260
HoursMon-Fri 8am-5pm

Frequently Asked Questions

Estimated permit fees for Fence projects in High Point, NC range from $40 – $160. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Fence projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in High Point can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Fence permits in High Point is about 1 week. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Fence Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Fence Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-03-29. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.