ADU Permit Requirements in Tijeras, NM

Village of Tijeras (pop ~500) is an incorporated village in Bernalillo County's East Mountain area. The Village handles its own zoning approvals through the Planning & Zoning Commission ((505) 281-1220, clerk@tijerasnm.gov), but building permits themselves are issued by Bernalillo County Planning & Development Services after Village zoning approval. ZIP 87059 covers the village and surrounding unincorporated East Mountain area, all of which falls under Bernalillo County AHJ. Trade permits (electrical/mechanical/plumbing) may be pulled from NMCID statewide.

By Joey, Founder · Last verified May 15, 2026 · How we research →

Population: 459 Code: 2018 Verified: 2026-05-15 1 local rules

When you need a ADU permit in Tijeras

Required·Rule 1

Accessory Dwelling Units (ADUs / guest houses / in-law units) require a building permit and zoning review in virtually every jurisdiction. Septic capacity must be re-evaluated when not on city sewer, and most cities require utility connection upgrades, parking review, and owner-occupancy or rental-restriction findings (IRC R105.1, varies by state ADU statute). To confirm requirements for your specific project in Tijeras, NM, contact Bernalillo County Planning & Development Services at (505) 314-0350. Apply online: https://aca-prod.accela.com/bernco/Default.aspx.

SourceBernalillo County Planning & Development Services — phone (505) 314-0350 · view source

ADU Permit Costs: Tijeras vs. Nearby

CityEstimated Fee
Tijeras N/A
Albuquerque $350 – $3,500
Las Cruces $350 – $3,500
Rio Rancho $350 – $3,500

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Tijeras permit costs →

Zoning Considerations

Zoning

ADU regulations vary dramatically by state and city. Many states (CA, OR, WA) have preemption laws that override local zoning restrictions. Check both state law and local zoning before designing.

Estimated Project Timeline in Tijeras

Here's a typical timeline for a adu project in Tijeras, NM:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to Tijeras's building department, apply online here.
Week 4-5
Plan review & approval
Processing time varies, contact Tijeras's building department for current turnaround times.
Week 6+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Need an ADU permit in Tijeras, NM?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameBernalillo County Planning & Development Services
Address111 Union Square SE, Suite 100, Albuquerque, NM 87102

Frequently Asked Questions

Contact Tijeras's building department for current ADU permit fee information. Fees typically vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller ADU projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Tijeras can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Contact Tijeras's building department for current processing times. Timelines vary based on project complexity and whether plan review is required.

Learn More About ADU Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read ADU Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-05-15. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.