AHJ resolution: county department. Craig is a tiny Burt County village (pop ~202, est. 1881). The Village of Craig has a clerk's office (the user-facing site villageofcraig.us did not publish phone/email for the clerk during research), but no village-level building department was documented. Burt County Planning and Zoning (Administrator Ann Chytka, 402-374-2945, planning@burtcountyne.gov) serves rural Burt County and the small cities/villages including Craig, Tekamah, Lyons, Decatur, and Oakland; residents needing to build, add, or move a structure are directed to contact this office for a permit. Confidence is medium because the county page lists 'rural Burt County' as the primary service area and does not explicitly enumerate which intra-village construction the county permits — homeowners in Craig should call the village clerk first to confirm whether the village itself requires anything before applying with the county. Nebraska's 2018 IRC applies as the default state code.

By Joey, Founder · Last verified May 15, 2026 · How we research →

Population: 202 Code: 2018 Verified: 2026-05-15 1 local rules

When you need a Demolition permit in Craig

Required·Rule 1

Demolition of any permanent structure requires a separate demolition permit in most jurisdictions, even when the new construction permit has already been issued. Asbestos and lead-paint surveys are commonly required for any structure built before 1981 (asbestos) or 1978 (lead, under EPA RRP rule), and utility disconnections must be witnessed. To confirm requirements for your specific project in Craig, NE, contact Burt County Planning and Zoning Department at (402) 374-2945. Visit: https://burtcountyne.gov/planning-and-zoning/.

SourceBurt County Planning and Zoning Department — phone (402) 374-2945 · view source

Demolition Permit Costs: Craig vs. Nearby

CityEstimated Fee
Craig N/A
Omaha $70 – $700
Lincoln $70 – $700
Bellevue $70 – $700

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Craig permit costs →

Zoning Considerations

Zoning

Properties in historic districts may require historic review board approval before demolition. Some cities require a waiting period for demolition permits to allow for public comment.

Estimated Project Timeline in Craig

Here's a typical timeline for a demolition project in Craig, NE:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings.
Week 2
Submit permit application
Your contractor submits the application to Craig's building department.
Week 3-4
Plan review & approval
Processing time varies, contact Craig's building department for current turnaround times.
Week 5+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Need a Demolition permit in Craig, NE?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameBurt County Planning and Zoning Department
Address111 North 13th Street, 1st Floor, Tekamah, NE 68061
HoursMon-Fri 8am-4:30pm (open through lunch)

Frequently Asked Questions

Contact Craig's building department for current Demolition permit fee information. Fees typically vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Demolition projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Craig can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Contact Craig's building department for current processing times. Timelines vary based on project complexity and whether plan review is required.

Learn More About Demolition Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Demolition Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-05-15. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.