Fireplace Permit Requirements in Plantersville, MS
The Town of Plantersville (Lee County) operates its own building-permit program through a Building and Safety department with a designated Building Inspector, Shane Davis (662-397-2013, davis.inspection@hotmail.com), at Plantersville Town Hall, 2587 Main Street. A building permit form is referenced on the town site. Mississippi has a statewide residential code (2021 IRC / MS Residential Code 2024) but adoption is discretionary; the town does not publish which edition it enforces, fees, or thresholds. Email is a personal hotmail address listed officially by the town, noted as-is. Confidence MEDIUM because code edition, fees, and per-project thresholds are not published.
By Joey, Founder · Last verified May 31, 2026 · How we research →
When you need a Fireplace permit
The Town of Plantersville Building and Safety department (Building Inspector Shane Davis) issues building permits. The town does not publish its adopted code edition or fees; Mississippi's statewide Mississippi Residential Code (based on the 2021 IRC) provides the baseline residential standard, but local adoption is discretionary. Installing a new fireplace, wood stove, or gas insert requires a permit. Clearance to combustibles, hearth extension, and chimney termination apply under the residential code, and a carbon monoxide alarm is required near sleeping areas. Confirm the current requirements and fees with the Building and Safety department before applying.
Fireplace Permit Costs: Plantersville vs. Nearby
| City | Estimated Fee |
|---|---|
| Plantersville | N/A |
| Jackson | $75 – $800 |
| Gulfport | $75 – $800 |
| Hattiesburg | $75 – $800 |
Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Plantersville permit costs →
Zoning Considerations
Fireplace and wood stove installations rarely trigger zoning review. Many California air quality districts (SCAQMD, BAAQMD) prohibit NEW wood-burning fireplaces in new construction. Chimney height requirements must comply with IRC R1003.9 (3 ft above roof penetration, 2 ft above any point within 10 ft horizontally).
Estimated Project Timeline
Here's a typical timeline for a fireplace project:
Timeline is based on the typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.
Need a Fireplace permit?
Answer a few quick questions for a personalized answer about your specific project.
Check Now, Free →Building Department Contact
Frequently Asked Questions
Contact the building department for current Fireplace permit fee information. Fees typically vary based on project scope and valuation.
It depends on the specifics of your project. Some smaller Fireplace projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.
Working without a required permit can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.
Typical approval time for Fireplace permits is about 2 weeks. More complex projects may take longer if plan review is required.
Learn More About Fireplace Permits
Read our complete guide covering permit requirements, costs, common exemptions, and the application process.
Read Fireplace Guide →