Driveway Permit Requirements in Plantersville, MS

The Town of Plantersville (Lee County) operates its own building-permit program through a Building and Safety department with a designated Building Inspector, Shane Davis (662-397-2013, davis.inspection@hotmail.com), at Plantersville Town Hall, 2587 Main Street. A building permit form is referenced on the town site. Mississippi has a statewide residential code (2021 IRC / MS Residential Code 2024) but adoption is discretionary; the town does not publish which edition it enforces, fees, or thresholds. Email is a personal hotmail address listed officially by the town, noted as-is. Confidence MEDIUM because code edition, fees, and per-project thresholds are not published.

By Joey, Founder · Last verified May 31, 2026 · How we research →

Code: Not stated by the town. Mississippi has a statewide Mississippi Residential Code (2021 IRC, effective July 1, 2024) but local adoption/enforcement is discretionary; the town's page does not specify an adopted edition. Verified: 2026-05-31 1 local rules

When you need a Driveway permit

Required·Rule 1

The Town of Plantersville Building and Safety department (Building Inspector Shane Davis) issues building permits. The town does not publish its adopted code edition or fees; Mississippi's statewide Mississippi Residential Code (based on the 2021 IRC) provides the baseline residential standard, but local adoption is discretionary. A new or widened driveway approach typically requires town approval, and a connection to a state highway requires a Mississippi DOT access permit. Confirm the driveway and sight-distance requirements with the town. Confirm the current requirements and fees with the Building and Safety department before applying.

Typical Timelineabout 2 weeks
SourceTown of Plantersville Building and Safety / Mississippi Residential Code (2021 IRC, statewide default) · view source

Driveway Permit Costs: Plantersville vs. Nearby

CityEstimated Fee
Plantersville N/A
Jackson $52 – $350
Gulfport $52 – $350
Hattiesburg $52 – $350

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Plantersville permit costs →

Zoning Considerations

Zoning

Driveways that require a new curb cut involve public right-of-way work and always need a permit. Driveway width and impervious surface limits vary by city.

Estimated Project Timeline

Here's a typical timeline for a driveway project:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings.
Week 2
Submit permit application
Your contractor submits the application to Plantersville's building department.
Week 3-4
Plan review & approval
Typical processing time: about 2 weeks. Application review and permit issuance.
Week 5+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on the typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Driveway permit?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameTown of Plantersville - Building and Safety
Address2587 Main Street, Plantersville, MS 38862

Frequently Asked Questions

Contact the building department for current Driveway permit fee information. Fees typically vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Driveway projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Driveway permits is about 2 weeks. More complex projects may take longer if plan review is required.

Learn More About Driveway Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Driveway Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-05-31. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.