The Town of Plantersville (Lee County) operates its own building-permit program through a Building and Safety department with a designated Building Inspector, Shane Davis (662-397-2013, davis.inspection@hotmail.com), at Plantersville Town Hall, 2587 Main Street. A building permit form is referenced on the town site. Mississippi has a statewide residential code (2021 IRC / MS Residential Code 2024) but adoption is discretionary; the town does not publish which edition it enforces, fees, or thresholds. Email is a personal hotmail address listed officially by the town, noted as-is. Confidence MEDIUM because code edition, fees, and per-project thresholds are not published.
By Joey, Founder · Last verified May 31, 2026 · How we research →
When you need a Addition permit
The Town of Plantersville Building and Safety department (Building Inspector Shane Davis) issues building permits. The town does not publish its adopted code edition or fees; Mississippi's statewide Mississippi Residential Code (based on the 2021 IRC) provides the baseline residential standard, but local adoption is discretionary. A habitable-space addition requires a building permit plus electrical, plumbing, and mechanical work that must follow state-licensed trades. Confirm the current requirements and fees with the Building and Safety department before applying.
Room Addition Permit Costs: Plantersville vs. Nearby
| City | Estimated Fee |
|---|---|
| Plantersville | N/A |
| Jackson | $300 – $5,000 |
| Gulfport | $300 – $5,000 |
| Hattiesburg | $210 – $3,500 |
Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Plantersville permit costs →
Zoning Considerations
Room additions typically require zoning review for setbacks, height limits, and lot coverage. Your addition must comply with your zoning district's building envelope requirements.
Estimated Project Timeline
Here's a typical timeline for a room addition project:
Timeline is based on the typical about 3 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.
Need an Addition permit?
Answer a few quick questions for a personalized answer about your specific project.
Check Now, Free →Building Department Contact
Frequently Asked Questions
Contact the building department for current Room Addition permit fee information. Fees typically vary based on project scope and valuation.
It depends on the specifics of your project. Some smaller Room Addition projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.
Working without a required permit can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.
Typical approval time for Room Addition permits is about 3 weeks. More complex projects may take longer if plan review is required.