Shed Permit Requirements in Biloxi, MS

Biloxi is a mid-size city of 48,144 residents in Mississippi that follows the 2021 IRC. Biloxi is generally more lenient than the standard IRC when it comes to shed projects, more exemptions and fewer permit triggers. You're looking at roughly $70 – $270 in permit fees, and plan on about 2 weeks for approval.

By Joey, Founder · Last verified March 29, 2026 · How we research →

Population: 48,144 Code: 2021 Verified: 2026-03-29 3 local rules

When you don’t need a Shed permit in Biloxi

Exempt·Rule 1

Accessory structures (sheds) 120 sq ft or less are generally exempt from a building permit.

SourceCity of Biloxi Code / MS Residential Code 2024 / 2021 IRC

When you need a Shed permit in Biloxi

Required·Rule 1

Sheds over 120 sq ft require a building permit.

Estimated Fee$70 – $270
Typical Timelineabout 2 weeks
SourceCity of Biloxi Code / MS Residential Code 2024 / 2021 IRC
Required·Rule 2

Sheds with electrical wiring require an electrical permit regardless of size.

Estimated Fee$45 – $135
Typical Timelineabout 1 week
SourceCity of Biloxi Code / MS Residential Code 2024 / 2021 IRC

What Makes Biloxi Different

Here's how Biloxi's shed rules stack up against the standard IRC baseline that most of the country follows.

Stricter Than the IRC

Sheds over 120 sq ft require a building permit.

Sheds with electrical wiring require an electrical permit regardless of size.

1 rule match the IRC baseline, no surprises there.

Shed Permit Costs: Biloxi vs. Nearby

Biloxi's fees are right in line with the Mississippi average, $45 – $270 versus $47 – $161 statewide.

CityEstimated Fee
Biloxi $45 – $270
Jackson $50 – $300
Gulfport $50 – $300
Hattiesburg $35 – $210

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Biloxi permit costs →

Zoning & HOA Considerations

Zoning

Sheds may be subject to zoning setback requirements and lot coverage limits. Placement near property lines or in front yards may require zoning approval.

HOA Communities

If you live in an HOA community: many HOAs restrict or prohibit outbuildings. Check your CC&Rs for rules on shed size, placement, materials, and appearance before purchasing or building.

Estimated Project Timeline in Biloxi

Here's a typical timeline for a shed project in Biloxi, MS:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to Biloxi's building department.
Week 4-5
Plan review & approval
Typical processing time in Biloxi: about 2 weeks. Plan review examiner checks drawings for code compliance.
Week 6+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on Biloxi's typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Shed permit in Biloxi, MS?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameCommunity Development - Building Division
Address676 Dr. Martin Luther King Jr. Blvd., Biloxi, MS 39530
HoursMon-Fri 7:30am-4:30pm

Frequently Asked Questions

Estimated permit fees for Shed projects in Biloxi, MS range from $45 – $270. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Shed projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Biloxi can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Shed permits in Biloxi is about 2 weeks. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Shed Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Shed Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-03-29. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.