Deck Permit Requirements in St. Paul, MN

Uses Minnesota State Building Code. State capital. Licensed trades required.

By Joey, Founder · Last verified March 29, 2026 · How we research →

Population: 311,527 Code: 2015 Verified: 2026-03-29 4 local rules

When you don’t need a Deck permit in St. Paul

Exempt·Rule 1

Freestanding decks not more than 30 inches above grade are exempt from a building permit per Minnesota State Building Code (based on 2012 IRC with amendments).

SourceMinnesota State Building Code (based on 2012 IRC with amendments)

When you need a Deck permit in St. Paul

Required·Rule 1

Attached decks require a building permit even if under 30 inches, as the ledger board attachment affects the dwelling structure.

Estimated Fee$95 – $330
Typical Timelineabout 2 weeks
SourceMinnesota State Building Code (based on 2012 IRC with amendments)
Required·Rule 2

Decks more than 30 inches above grade require a building permit with structural plans.

Estimated Fee$140 – $475
Typical Timelineabout 2 weeks
SourceMinnesota State Building Code (based on 2012 IRC with amendments)
Required·Rule 3

Covered decks or those over 300 sq ft require a building permit and may trigger zoning review.

Estimated Fee$190 – $570
Typical Timelineabout 3 weeks
SourceMinnesota State Building Code (based on 2012 IRC with amendments)

Deck Permit Costs: St. Paul vs. Nearby

St. Paul comes in on the low side for Minnesota. You're looking at $95 – $570 here, compared to the state average of $134 – $432.

CityEstimated Fee
St. Paul $95 – $570
Minneapolis $100 – $600
Rochester $125 – $700
Bloomington $85 – $510

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all St. Paul permit costs →

Zoning & HOA Considerations

Zoning

Decks may be subject to zoning setback and lot coverage requirements. Check with your local planning department before building near property lines.

HOA Communities

If you live in an HOA community: many HOAs restrict deck materials, colors, size, and placement. Review your CC&Rs and submit an architectural review request before applying for a building permit. HOA approval can take 1–6 weeks.

Estimated Project Timeline in St. Paul

Here's a typical timeline for a deck project in St. Paul, MN:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to St. Paul's building department, apply online here.
Week 4-6
Plan review & approval
Typical processing time in St. Paul: about 3 weeks. Plan review examiner checks drawings for code compliance.
Week 7+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on St. Paul's typical about 3 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Deck permit in St. Paul, MN?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameDepartment of Safety and Inspections
Address375 Jackson St, Suite 220, St. Paul, MN 55101
HoursMon-Fri 7:30am-4:30pm

Frequently Asked Questions

Estimated permit fees for Deck projects in St. Paul, MN range from $95 – $570. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Deck projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in St. Paul can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Deck permits in St. Paul is about 2 weeks. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Deck Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Deck Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-03-29. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.