Demolition Permit Requirements in Maple Grove, MN

Minnesota uses the 2020 Minnesota Residential Code (based on 2018 IRC). Located in Hennepin County. Uses LOGIS ePermits system.

By Joey, Founder · Last verified April 7, 2026 · How we research →

Population: 72,571 Code: 2018 Verified: 2026-04-07 4 local rules

When you don’t need a Demolition permit in Maple Grove

Exempt·Rule 1

Removing a small accessory structure (shed, carport, small outbuilding) built after 1978 and not in a historic district may be exempt from a demolition permit. However, utility disconnection and proper disposal are still required. Check with your building department.

SourceCity of Maple Grove Building Inspection / 2020 Minnesota Residential Code (based on 2018 IRC) · view source

When you need a Demolition permit in Maple Grove

Required·Rule 1

Full building demolition requires a demolition permit. All utilities (gas, electric, water, sewer) must be disconnected before work begins. An asbestos survey is required for structures built before 1978.

Typical Timelineabout 3 weeks
SourceCity of Maple Grove Building Inspection / 2020 Minnesota Residential Code (based on 2018 IRC) · view source
Required·Rule 2

Demolition of structures built before 1978 requires a permit and an asbestos survey before any work begins. Federal EPA NESHAP regulations require asbestos-containing materials to be identified and properly abated. Lead paint may also be present and require special handling.

Typical Timelineabout 3 weeks
SourceCity of Maple Grove Building Inspection / 2020 Minnesota Residential Code (based on 2018 IRC) · view source
Required·Rule 3

Partial demolition that involves removing structural elements (walls, roof sections, floors) requires a building permit. Structural plans may be required showing how the remaining structure will be supported.

Typical Timelineabout 2 weeks
SourceCity of Maple Grove Building Inspection / 2020 Minnesota Residential Code (based on 2018 IRC) · view source

Demolition Permit Costs: Maple Grove vs. Nearby

CityEstimated Fee
Maple Grove N/A
Minneapolis $100 – $1,000
St. Paul $100 – $1,000
Rochester $100 – $1,000

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Maple Grove permit costs →

Zoning & HOA Considerations

Zoning

Properties in historic districts may require historic review board approval before demolition. Some cities require a waiting period for demolition permits to allow for public comment.

HOA Communities

If you live in an HOA community: demolition of visible structures (garages, sheds, accessory buildings) may require HOA notification or approval. Check your CC&Rs, some communities require maintaining certain structures or replacing them within a set timeframe.

Estimated Project Timeline in Maple Grove

Here's a typical timeline for a demolition project in Maple Grove, MN:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to Maple Grove's building department, apply online here.
Week 4-6
Plan review & approval
Typical processing time in Maple Grove: about 3 weeks. Plan review examiner checks drawings for code compliance.
Week 7+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on Maple Grove's typical about 3 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Demolition permit in Maple Grove, MN?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameBuilding Inspection Services
Address12800 Arbor Lakes Parkway N, Maple Grove, MN 55369
HoursMon-Fri 8am-4:30pm

Frequently Asked Questions

Contact Maple Grove's building department for current Demolition permit fee information. Fees typically vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Demolition projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Maple Grove can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Demolition permits in Maple Grove is about 3 weeks. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Demolition Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Demolition Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-04-07. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.