Demolition Permit Requirements in City of Grand Haven, MI
The City of Grand Haven Building & Inspection Division (part of the Department of Public Safety) issues all building, electrical, plumbing, and mechanical permits within incorporated city limits. Michigan operates under the Stille-DeRossett-Hale Single State Construction Code Act (1972 PA 230); the 2021 Michigan Residential Code (MRC) and 2021 Michigan Building Code (MBC) are the statewide codes, effective April 9, 2025. Local amendments to the building code are preempted. Climate Zone 5A, 42-inch minimum frost depth. Electrical, plumbing, HVAC, and residential builder licensing through Michigan LARA; owner-builders may perform work on their own single-family primary residence. Planning & Community Development (zoning) at 519 Washington Ave, (616) 842-3210. Distinctive features: (1) Downtown Historic District along Washington Avenue (121 buildings, listed on National Register 2016) requires Historic Conservation District Commission review for exterior alterations, demolition, or new construction; (2) Lake Michigan shoreline properties may fall within EGLE High-Risk Erosion Areas or Critical Dune Areas requiring state EGLE permits; (3) Floodplain regulations under City Ordinance Chapter 16 apply within mapped FEMA 100-year and 500-year zones. ZIP 49417 also covers Grand Haven Charter Township (separate building authority at 13300 168th Ave) and Spring Lake Village (contracts with Michigan Township Services at 231-865-6977); residents outside city limits should contact their jurisdiction directly. Ottawa County Building Authority at 12220 Fillmore Street, West Olive MI 49460 handles building permits for some unincorporated county areas.
By Joey, Founder · Last verified April 24, 2026 · How we research →
When you need a Demolition permit in City of Grand Haven
Demolition of a structure requires a building (demolition) permit from the City Building & Inspection Division. Utility disconnects for water, sewer, gas, and electric must be documented before demolition. Structures built before 1978 may have asbestos or lead-based paint, triggering EPA NESHAP and Michigan EGLE notification. Demolition in the Downtown Historic District requires HCD Commission approval and typically a 60-day review.
Demolition Permit Costs: City of Grand Haven vs. Nearby
| City | Estimated Fee |
|---|---|
| City of Grand Haven | N/A |
| Detroit | $100 – $1,000 |
| Grand Rapids | $100 – $1,000 |
| Warren | $100 – $1,000 |
Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all City of Grand Haven permit costs →
Zoning & HOA Considerations
Properties in historic districts may require historic review board approval before demolition. Some cities require a waiting period for demolition permits to allow for public comment.
If you live in an HOA community: demolition of visible structures (garages, sheds, accessory buildings) may require HOA notification or approval. Check your CC&Rs, some communities require maintaining certain structures or replacing them within a set timeframe.
Estimated Project Timeline in City of Grand Haven
Here's a typical timeline for a demolition project in City of Grand Haven, MI:
Timeline is based on City of Grand Haven's typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.
Need a Demolition permit in City of Grand Haven, MI?
Answer a few quick questions for a personalized answer about your specific project.
Check Now, Free →Building Department Contact
Frequently Asked Questions
Contact City of Grand Haven's building department for current Demolition permit fee information. Fees typically vary based on project scope and valuation.
It depends on the specifics of your project. Some smaller Demolition projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.
Working without a required permit in City of Grand Haven can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.
Typical approval time for Demolition permits in City of Grand Haven is about 2 weeks. More complex projects may take longer if plan review is required.
If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.
Learn More About Demolition Permits
Read our complete guide covering permit requirements, costs, common exemptions, and the application process.
Read Demolition Guide →