Shed Permit Requirements in Des Moines, IA

Des Moines adopted 2024 IRC effective Jan 1, 2026. Iowa has statewide code but cities >15K have local adoption authority.

By Joey, Founder · Last verified March 29, 2026 · How we research →

Population: 213,096 Code: 2024 Verified: 2026-03-29 3 local rules

When you don’t need a Shed permit in Des Moines

Exempt·Rule 1

Accessory structures (sheds) 120 sq ft or less are generally exempt from a building permit.

SourceCity of Des Moines Code / 2024 IRC (Ordinance 15,562)

When you need a Shed permit in Des Moines

Required·Rule 1

Sheds over 120 sq ft require a building permit.

Estimated Fee$75 – $300
Typical Timelineabout 2 weeks
SourceCity of Des Moines Code / 2024 IRC (Ordinance 15,562)
Required·Rule 2

Sheds with electrical wiring require an electrical permit regardless of size.

Estimated Fee$50 – $150
Typical Timelineabout 1 week
SourceCity of Des Moines Code / 2024 IRC (Ordinance 15,562)

Shed Permit Costs: Des Moines vs. Nearby

Des Moines's fees are right in line with the Iowa average, $50 – $300 versus $49 – $165 statewide.

CityEstimated Fee
Des Moines $50 – $300
Cedar Rapids $50 – $250
Davenport $50 – $300
Sioux City $45 – $225

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Des Moines permit costs →

Zoning & HOA Considerations

Zoning

Sheds may be subject to zoning setback requirements and lot coverage limits. Placement near property lines or in front yards may require zoning approval.

HOA Communities

If you live in an HOA community: many HOAs restrict or prohibit outbuildings. Check your CC&Rs for rules on shed size, placement, materials, and appearance before purchasing or building.

Estimated Project Timeline in Des Moines

Here's a typical timeline for a shed project in Des Moines, IA:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to Des Moines's building department, apply online here.
Week 4-5
Plan review & approval
Typical processing time in Des Moines: about 2 weeks. Plan review examiner checks drawings for code compliance.
Week 6+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on Des Moines's typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Shed permit in Des Moines, IA?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NamePermit and Development Center
Address1200 Locust Street, Des Moines, IA 50309
HoursMon-Fri 8am-4:30pm

Frequently Asked Questions

Estimated permit fees for Shed projects in Des Moines, IA range from $50 – $300. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Shed projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Des Moines can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Shed permits in Des Moines is about 2 weeks. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Shed Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Shed Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-03-29. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.