Tree Removal Permit Requirements in City of Washington, IN

Permit rules for the City of Washington, IN (ZIP 47501), county seat of Daviess County in southwestern Indiana. Permits issued by City of Washington Building Commission at 2113 Memorial Avenue, (812) 254-8208 (paper/in-person; no online portal). 2-mile ETJ around city; Daviess County for unincorporated parcels. IN framework: 2020 Indiana Residential Code (2018 IRC base + IN amendments) effective Dec 2019. Indiana Plumbing Code (Indiana Plumbing Commission, statewide). 2017 NEC. IECC 4A; frost depth 30 inches. Indiana has NO statewide GC license , Washington requires city contractor registration. Distinctive features: Indiana's 4th-largest Amish community (~14.6% of Daviess County); Crane NSWC federal installation defense workforce; White River + East Fork White River FEMA SFHA; INDOT permits for US-50/US-150/SR-57/SR-257; Duke Energy Indiana + CenterPoint Energy/Vectren utilities.

By Joey, Founder · Last verified May 1, 2026 · How we research →

Population: 11,781 Code: 2020 Indiana Residential Code Verified: 2026-05-01 1 local rules

When you don’t need a Tree Removal permit in City of Washington

Exempt·Rule 1

IN (covering ZIP 47501), permits are issued by the City of Washington Building Commission, enforcing the 2020 Indiana Residential Code (incorporating the 2018 IRC (IN base), 2017 NEC, Indiana Plumbing Code (Indiana Plumbing Commission), Indiana Fuel Gas Code, Indiana Mechanical Code, and 2009 IECC w/ IN amendments with state amendments). IECC Climate Zone 4A. Local tree-removal regulation varies. Verify tree is on your property and check Duke Energy Indiana / Hoosier Energy easement restrictions if near power lines.

SourceCity of Washington Building Commission / 2020 Indiana Residential Code · view source

Tree Removal Permit Costs: City of Washington vs. Nearby

CityEstimated Fee
City of Washington N/A
Indianapolis $25 – $500
Fort Wayne $25 – $500
Evansville $25 – $500

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all City of Washington permit costs →

Zoning & HOA Considerations

Zoning

Many cities protect trees above a certain diameter at breast height (DBH), commonly 6", 12", 19", or 20", and some cities protect specific species (oak, sycamore) regardless of size. Portland, Atlanta, Austin, Seattle, and Los Angeles all have significant tree protection rules. Houston and most of Texas have none.

HOA Communities

If you live in an HOA community: hOAs commonly regulate tree removal, particularly for front-yard trees and specimen trees. Even where city law permits removal, HOA approval may be required.

Estimated Project Timeline in City of Washington

Here's a typical timeline for a tree removal project in City of Washington, IN:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings.
Week 2
Submit permit application
Your contractor submits the application to City of Washington's building department, apply online here.
Week 3-4
Plan review & approval
Processing time varies, contact City of Washington's building department for current turnaround times.
Week 5+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Need a Tree Removal permit in City of Washington, IN?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameCity of Washington Building Commission
AddressSee description for full address
HoursMonday-Friday, business hours (verify with department)

Frequently Asked Questions

Contact City of Washington's building department for current Tree Removal permit fee information. Fees typically vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Tree Removal projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in City of Washington can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Contact City of Washington's building department for current processing times. Timelines vary based on project complexity and whether plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Tree Removal Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Tree Removal Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-05-01. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.