Solar Panels Permit Requirements in Union, IL

Village of Union handles its own building permits (McHenry County only covers unincorporated areas, not incorporated villages). Building Inspector is available one hour per week, Tuesdays 3 PM to 4 PM. The village has not published its adopted residential code edition online; rules below use IRC 2021 as baseline (the most common adoption in the Chicago metro). No published fee schedule, no online application portal. Apply in person during Village Hall hours or email permits@unionillinois.org. Illinois state plumbing code (IDPH-licensed plumbers) and electrical licensing requirements apply regardless of local code adoption.

By Joey, Founder · Last verified April 18, 2026 · How we research →

Population: 600 Code: 2021 Verified: 2026-04-18 3 local rules

When you need a Solar Panels permit in Union

Required·Rule 1

Rooftop solar PV systems require a building permit and electrical permit in Union, IL under 2021 IRC R324 and 2021 NEC Article 690. Illinois law (220 ILCS 75) prohibits HOAs and most local rules from blocking solar, but the village still inspects the structural attachment and electrical interconnection. Verify with the Village Building Inspector at (815) 923-4153 (available Tuesdays 3 PM to 4 PM) before starting work.

Typical Timelineabout 2 weeks
Source2021 IRC baseline (Union has not published adopted code edition); Village of Union Building Inspector · view source
Required·Rule 2

Ground-mounted solar PV systems require a building permit and electrical permit in Union, IL under 2021 IRC and 2021 NEC Article 690. Foundation, racking, and zoning setbacks all apply. Verify with the Village Building Inspector at (815) 923-4153 (available Tuesdays 3 PM to 4 PM) before starting work.

Typical Timelineabout 2 weeks
Source2021 IRC baseline (Union has not published adopted code edition); Village of Union Building Inspector · view source
Required·Rule 3

Energy storage systems (e.g., Tesla Powerwall, Enphase) require a building and electrical permit in Union, IL under 2021 IRC R328 and 2021 NEC Article 706. Verify with the Village Building Inspector at (815) 923-4153 (available Tuesdays 3 PM to 4 PM) before starting work.

Typical Timelineabout 2 weeks
Source2021 IRC baseline (Union has not published adopted code edition); Village of Union Building Inspector · view source

Solar Panels Permit Costs: Union vs. Nearby

CityEstimated Fee
Union N/A
Chicago $150 – $500
Aurora $150 – $500
Joliet $150 – $500

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Union permit costs →

Zoning Considerations

Zoning

Ground-mounted solar arrays are subject to zoning setback and height restrictions in most jurisdictions. Rooftop systems rarely trigger zoning review unless in a historic district. Check with your planning department for ground-mounted installations.

Estimated Project Timeline in Union

Here's a typical timeline for a solar panels project in Union, IL:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to Union's building department.
Week 4-5
Plan review & approval
Typical processing time in Union: about 2 weeks. Plan review examiner checks drawings for code compliance.
Week 6+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on Union's typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Solar Panels permit in Union, IL?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameVillage of Union (Village Hall, Building Inspector)
Address17703 O'Cock Road, Union, IL 60180
HoursVillage Hall: Tue 10 AM to 4 PM, Thu 1 PM to 5 PM. Building Inspector available Tue 3 PM to 4 PM.

Frequently Asked Questions

Contact Union's building department for current Solar Panels permit fee information. Fees typically vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Solar Panels projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Union can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Solar Panels permits in Union is about 2 weeks. More complex projects may take longer if plan review is required.

Learn More About Solar Panels Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Solar Panels Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-04-18. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.