Village of Union handles its own building permits (McHenry County only covers unincorporated areas, not incorporated villages). Building Inspector is available one hour per week, Tuesdays 3 PM to 4 PM. The village has not published its adopted residential code edition online; rules below use IRC 2021 as baseline (the most common adoption in the Chicago metro). No published fee schedule, no online application portal. Apply in person during Village Hall hours or email permits@unionillinois.org. Illinois state plumbing code (IDPH-licensed plumbers) and electrical licensing requirements apply regardless of local code adoption.
By Joey, Founder · Last verified April 18, 2026 · How we research →
When you don’t need a EV Charger permit in Union
A Level 1 EV charger that plugs into an existing 120V outlet does not require an electrical permit in Union, IL because no new wiring is added. Verify with the Village Building Inspector at (815) 923-4153 (available Tuesdays 3 PM to 4 PM) before starting work.
When you need a EV Charger permit in Union
A Level 2 EV charger (240V hardwired or 240V dedicated outlet) requires an electrical permit in Union, IL because it adds a new circuit per 2021 NEC Article 625. An Illinois-licensed electrician must do the work. Verify with the Village Building Inspector at (815) 923-4153 (available Tuesdays 3 PM to 4 PM) before starting work.
EV Charger Permit Costs: Union vs. Nearby
| City | Estimated Fee |
|---|---|
| Union | N/A |
| Chicago | $75 – $500 |
| Aurora | $75 – $500 |
| Joliet | $75 – $500 |
Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Union permit costs →
Zoning Considerations
EV chargers in private garages or driveways rarely trigger zoning review. Outdoor pedestal chargers may have setback requirements in some jurisdictions. California AB 1236 prohibits requiring a planning permit for residential EV charger installations, building official review only.
Estimated Project Timeline in Union
Here's a typical timeline for a ev charger project in Union, IL:
Timeline is based on Union's typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.
Need an EV Charger permit in Union, IL?
Answer a few quick questions for a personalized answer about your specific project.
Check Now, Free →Building Department Contact
Frequently Asked Questions
Contact Union's building department for current EV Charger permit fee information. Fees typically vary based on project scope and valuation.
It depends on the specifics of your project. Some smaller EV Charger projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.
Working without a required permit in Union can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.
Typical approval time for EV Charger permits in Union is about 2 weeks. More complex projects may take longer if plan review is required.
Learn More About EV Charger Permits
Read our complete guide covering permit requirements, costs, common exemptions, and the application process.
Read EV Charger Guide →