Deck Permit Requirements in Union, IL

Village of Union handles its own building permits (McHenry County only covers unincorporated areas, not incorporated villages). Building Inspector is available one hour per week, Tuesdays 3 PM to 4 PM. The village has not published its adopted residential code edition online; rules below use IRC 2021 as baseline (the most common adoption in the Chicago metro). No published fee schedule, no online application portal. Apply in person during Village Hall hours or email permits@unionillinois.org. Illinois state plumbing code (IDPH-licensed plumbers) and electrical licensing requirements apply regardless of local code adoption.

By Joey, Founder · Last verified April 18, 2026 · How we research →

Population: 600 Code: 2021 Verified: 2026-04-18 3 local rules

When you don’t need a Deck permit in Union

Exempt·Rule 1

Under 2021 IRC R105.2, freestanding decks not more than 30 inches above grade are exempt from a building permit in Union, IL. Verify with the Village Building Inspector at (815) 923-4153 (available Tuesdays 3 PM to 4 PM) before starting work.

Source2021 IRC baseline (Union has not published adopted code edition); Village of Union Building Inspector · view source

When you need a Deck permit in Union

Required·Rule 1

Under 2021 IRC R507, attached decks require a building permit in Union, IL even if under 30 inches above grade because the ledger board attachment is a structural connection to the dwelling. Verify with the Village Building Inspector at (815) 923-4153 (available Tuesdays 3 PM to 4 PM) before starting work.

Typical Timelineabout 2 weeks
Source2021 IRC baseline (Union has not published adopted code edition); Village of Union Building Inspector · view source
Required·Rule 2

Under 2021 IRC R507 and R312, decks more than 30 inches above grade require a building permit with structural plans in Union, IL. Guardrails at least 36 inches high are required. Verify with the Village Building Inspector at (815) 923-4153 (available Tuesdays 3 PM to 4 PM) before starting work.

Typical Timelineabout 2 weeks
Source2021 IRC baseline (Union has not published adopted code edition); Village of Union Building Inspector · view source

What Makes Union Different

Here's how Union's deck rules stack up against the standard IRC baseline that most of the country follows.

Stricter Than the IRC

Under 2021 IRC R507, attached decks require a building permit in Union, IL even if under 30 inches above grade because the ledger board attachment is a structural connection to the dwelling. Verify with the Village Building Inspector at (815) 923-4153 (available Tuesdays 3 PM to 4 PM) before starting work.

Under 2021 IRC R507 and R312, decks more than 30 inches above grade require a building permit with structural plans in Union, IL. Guardrails at least 36 inches high are required. Verify with the Village Building Inspector at (815) 923-4153 (available Tuesdays 3 PM to 4 PM) before starting work.

1 rule match the IRC baseline, no surprises there.

Deck Permit Costs: Union vs. Nearby

CityEstimated Fee
Union N/A
Chicago $110 – $880
Aurora $85 – $680
Joliet $80 – $640

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Union permit costs →

Zoning Considerations

Zoning

Decks may be subject to zoning setback and lot coverage requirements. Check with your local planning department before building near property lines.

Estimated Project Timeline in Union

Here's a typical timeline for a deck project in Union, IL:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to Union's building department.
Week 4-5
Plan review & approval
Typical processing time in Union: about 2 weeks. Plan review examiner checks drawings for code compliance.
Week 6+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on Union's typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Deck permit in Union, IL?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameVillage of Union (Village Hall, Building Inspector)
Address17703 O'Cock Road, Union, IL 60180
HoursVillage Hall: Tue 10 AM to 4 PM, Thu 1 PM to 5 PM. Building Inspector available Tue 3 PM to 4 PM.

Frequently Asked Questions

Contact Union's building department for current Deck permit fee information. Fees typically vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Deck projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Union can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Deck permits in Union is about 2 weeks. More complex projects may take longer if plan review is required.

Learn More About Deck Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Deck Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-04-18. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.