When you don’t need a Retaining Wall permit in Des Plaines

Exempt·Rule 1

Retaining walls under 4 feet do not require a building permit in Chicago, IL, unless supporting a surcharge.

SourceDes Plaines Building Code (Municipal Code Title 14)

When you need a Retaining Wall permit in Des Plaines

Required·Rule 1

Retaining walls 4 feet or taller require a building permit and engineered design in Chicago, IL.

Estimated Fee$165 – $660
Typical Timelineabout 3 weeks
SourceDes Plaines Building Code (Municipal Code Title 14)
Required·Rule 2

Retaining walls supporting a surcharge require a building permit in Chicago, IL regardless of height.

Estimated Fee$165 – $660
Typical Timelineabout 3 weeks
SourceDes Plaines Building Code (Municipal Code Title 14)

What Makes Des Plaines Different

Here's how Des Plaines's retaining wall rules stack up against the standard IRC baseline that most of the country follows.

Stricter Than the IRC

Des Plaines drops the height feet threshold to 3 feet. The IRC allows up to 4 feet before requiring a permit.

Retaining walls 4 feet or taller require a building permit and engineered design in Chicago, IL.

Retaining walls supporting a surcharge require a building permit in Chicago, IL regardless of height.

Retaining Wall Permit Costs: Des Plaines vs. Nearby

Des Plaines runs higher than average for Illinois. Expect $165 – $660 versus the state average of $121 – $509.

CityEstimated Fee
Des Plaines $165 – $660
Chicago $165 – $660
Aurora $128 – $510
Joliet $120 – $480

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Des Plaines permit costs →

Zoning & HOA Considerations

Zoning

Retaining walls near property lines may require zoning setback review. Walls that significantly change the grade of a property may need additional zoning approval.

HOA Communities

If you live in an HOA community: some HOAs restrict retaining wall materials and appearance. Visible retaining walls in front or side yards may need architectural review approval for material and design.

Estimated Project Timeline in Des Plaines

Here's a typical timeline for a retaining wall project in Des Plaines, IL:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to Des Plaines's building department, apply online here.
Week 4-6
Plan review & approval
Typical processing time in Des Plaines: about 3 weeks. Plan review examiner checks drawings for code compliance.
Week 7+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on Des Plaines's typical about 3 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Retaining Wall permit in Des Plaines, IL?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameBuilding Division
Address1420 Miner Street, Des Plaines, IL 60016
HoursMon-Fri 8am-5pm

Frequently Asked Questions

Estimated permit fees for Retaining Wall projects in Des Plaines, IL range from $165 – $660. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Retaining Wall projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Des Plaines can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Retaining Wall permits in Des Plaines is about 3 weeks. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Retaining Wall Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Retaining Wall Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-04-10. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.