Driveway Permit Requirements in Trinity, FL
ZIP 34655 is the Trinity / west-Pasco area, which is UNINCORPORATED Pasco County, not inside the City of New Port Richey municipal limits. The USPS 'New Port Richey' label is only the postal name. For a 34655 residential address, building permits are issued by Pasco County Building Construction Services (Central Permitting), not by the City of New Port Richey. Permits are filed online via PascoGateway (Accela). Florida uses the statewide Florida Building Code, Residential (8th Edition, 2023).
By Joey, Founder · Last verified June 1, 2026 · How we research →
When you need a Driveway permit
FL (unincorporated west Pasco County, ZIP 34655), a new driveway or a new connection (culvert or access point) to a public road typically requires an access or right-of-way permit from the county. Confirm sight-distance and drainage requirements with Pasco County Building Construction Services before construction.
Driveway Permit Costs: Trinity vs. Nearby
| City | Estimated Fee |
|---|---|
| Trinity | N/A |
| Jacksonville | $75 – $500 |
| Miami | $75 – $500 |
| Tampa | $75 – $500 |
Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Trinity permit costs →
Zoning Considerations
Driveways that require a new curb cut involve public right-of-way work and always need a permit. Driveway width and impervious surface limits vary by city.
Estimated Project Timeline
Here's a typical timeline for a driveway project:
Timeline is based on the typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.
Need a Driveway permit?
Answer a few quick questions for a personalized answer about your specific project.
Check Now, Free →Building Department Contact
Frequently Asked Questions
Contact the building department for current Driveway permit fee information. Fees typically vary based on project scope and valuation.
It depends on the specifics of your project. Some smaller Driveway projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.
Working without a required permit can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.
Typical approval time for Driveway permits is about 2 weeks. More complex projects may take longer if plan review is required.
Learn More About Driveway Permits
Read our complete guide covering permit requirements, costs, common exemptions, and the application process.
Read Driveway Guide →