St. Johns County Building Department at 4040 Lewis Speedway, St. Augustine FL 32084, (904) 827-6800, info@sjcfl.us, online permit portal at sjcfl.us/permit-status/. Issues all building, electrical, plumbing, and mechanical permits for unincorporated St. Johns County, including the former Town of Hastings (ZIP 32145). The Town of Hastings VOLUNTARILY DISSOLVED its municipal charter on March 14, 2017 and is now fully unincorporated St. Johns County; there is no separate Hastings municipal government, and the 'Hastings, FL' USPS designation is purely a postal address. ZIP 32145 covers a rural agricultural area in southern St. Johns County (~25 miles southwest of St. Augustine), historically known as the 'Potato Capital' of Florida. Florida adopted the 8th Edition (2023) Florida Building Code statewide effective December 31, 2023; the 9th Edition (2026) is published but not effective until December 31, 2026. The FBC includes Building, Residential (FBC-R), Plumbing, Mechanical, Fuel Gas, Energy Conservation, Existing Building, Test Protocols, and references the NEC (2020) for electrical. IECC Climate Zone 2A (hot-humid). Hastings/32145 is INLAND (not in the Wind-Borne Debris Zone, which covers only St. Johns coastal areas within 1 mile of the Atlantic shoreline) per St. Johns County WBDZ map. Florida has STRONG state-level contractor licensing through the Department of Business & Professional Regulation (DBPR) Construction Industry Licensing Board: Certified contractors (statewide) and Registered contractors (county-only). Categories: CGC general, CBC building, CRC residential, CCC commercial, ER residential electrical, EC certified electrical, CFC certified plumbing, CMC certified mechanical/HVAC, CRRC roofing. Owner-builder allowed under FL Statute 489.103(7) for primary residence (cannot sell/lease for 1 year post-completion). Distinctive features: (1) Coastal Construction Control Line (CCCL) regulated by Florida DEP for any work east of A1A near the Atlantic shoreline (does not apply to inland Hastings); (2) St. Johns River Water Management District permits for water-related work; (3) Most rural Hastings parcels use private well + septic regulated by Florida Department of Health; (4) FEMA Special Flood Hazard Areas extensive due to coastal/tidal flooding and hurricane storm surge; check FEMA Flood Map Service Center for parcel; (5) Hurricane storm-surge and tropical-system flooding exposure typical of north Florida; (6) Tomoka River, St. Johns River, Crescent Lake watersheds.

By Joey, Founder · Last verified April 27, 2026 · How we research →

Population: 333,508 Code: 8th Edition (2023) Florida Building Code Verified: 2026-04-27 3 local rules

When you don’t need a Shed permit

Exempt·Rule 1

Accessory structures (sheds) 200 sq ft or less that are not used for living or storage of hazardous materials are exempt from a building permit per FBCR 8th Edition R105.2. County zoning setbacks still apply and the shed must be anchored to resist wind loads.

SourceSt. Johns County Building Services / FBCR 8th Edition (2023) R105.2 · view source

When you need a Shed permit

Required·Rule 1

Sheds over 200 sq ft require a building permit from St. Johns County Building Services. Plans showing foundation, framing, tie-downs for wind loads, and setback compliance are required.

Estimated Fee$125 – $300
Typical Timelineabout 2 weeks
SourceSt. Johns County Building Services / FBCR 8th Edition (2023) R105.2 · view source
Required·Rule 2

Large accessory structures over 600 sq ft require a building permit with full construction plans, engineered wind-load design per ASCE 7-22, and typically a Florida-licensed contractor (CILB) unless an owner-builder affidavit is on file for a primary residence.

Estimated Fee$250 – $600
Typical Timelineabout 2 weeks
SourceSt. Johns County Building Services / FBCR 8th Edition (2023) R105.2 · view source

Shed Permit Costs: St. Johns County vs. Nearby

St. Johns County runs higher than average for Florida. Expect $125 – $600 versus the state average of $79 – $271.

CityEstimated Fee
St. Johns County $125 – $600
Jacksonville $80 – $300
Miami $65 – $650
Tampa $45 – $450

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all St. Johns County permit costs →

Zoning & HOA Considerations

Zoning

Sheds may be subject to zoning setback requirements and lot coverage limits. Placement near property lines or in front yards may require zoning approval.

HOA Communities

If you live in an HOA community: many HOAs restrict or prohibit outbuildings. Check your CC&Rs for rules on shed size, placement, materials, and appearance before purchasing or building.

Estimated Project Timeline

Here's a typical timeline for a shed project:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to St. Johns County's building department, apply online here.
Week 4-5
Plan review & approval
Typical processing time: about 2 weeks. Plan review examiner checks drawings for code compliance.
Week 6+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on the typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Shed permit?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameSt. Johns County Building Department
Address4040 Lewis Speedway, St. Augustine, FL 32084
HoursMonday-Friday 8:00 AM - 5:00 PM

Frequently Asked Questions

Estimated permit fees for Shed projects range from $125 – $600. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Shed projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Shed permits is about 2 weeks. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Shed Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Shed Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-04-27. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.