ADU Permit Requirements in New Port Richey, FL

City of New Port Richey is the AHJ for ZIP 34653 areas inside city limits. The city is only about 4 sq mi; ZIP 34653 also covers large portions of unincorporated Pasco County (which is permitted by Pasco County Building Construction Services). Property owners should verify jurisdiction via the Pasco County Property Appraiser before applying. Permit applications: submit digitally to permitting@cityofnewportrichey.org or in-person at City Hall, 5919 Main Street. Tyler EnerGov Citizen Self Service portal (cityofnewportricheyfl-energovweb.tylerhost.net) is used for inspection scheduling, permit status, and license/registration lookups. Effective May 1, 2026, inspection requests are online-only via the portal. Enforced codes: 2023 Florida Building Code (8th Edition) including Residential, Existing Building, Mechanical, Plumbing, Test Protocols, Energy Conservation, Fuel Gas, Accessibility; 2023 NEC. Coastal city on the Pithlachascotee (Cotee) River with significant FEMA Special Flood Hazard Area (Zone AE) coverage and Coastal A Zone exposure near the river and Gulf inlets; substantial improvement / substantial damage rules apply (city publishes a Substantial Improvement worksheet). Hurricane wind zone: 140 mph Vult design wind per ASCE 7 for this part of Pasco. Windborne debris region; opening protection or impact-rated glazing required for new and replacement openings. HVHZ (FBC Section 1623) does NOT apply here (HVHZ is Miami-Dade/Broward only); standard FBC windborne debris provisions govern. Tree removal permits required for many species (City Code 8.02.00). General city switchboard: (727) 853-1016. Hours not published on the Building Division page; verify by calling Development Dept.

By Joey, Founder · Last verified May 23, 2026 · How we research →

Population: 17,425 Code: 8th Edition FBC (2023) Verified: 2026-05-23 2 local rules

When you need a ADU permit in New Port Richey

Required·Rule 1

A detached accessory dwelling unit (ADU) requires building, plumbing, electrical, and mechanical permits. Confirm ADUs are allowed in the parcel's zoning district with City of New Port Richey Building Division at (727) 853-1047. Septic capacity must be reviewed by the Florida Department of Health in Pasco County. NOTE: ZIP 34653 spans both the City of New Port Richey (small ~4 sq mi area) and large unincorporated areas of Pasco County. If your address is within incorporated city limits, this dept applies; if unincorporated, contact Pasco County Building Construction Services.

Estimated Fee$750 – $2,000
Typical Timelineabout 4 weeks
SourceCity of New Port Richey Building Division / 2023 Florida Building Code (8th Ed) · view source
Required·Rule 2

An attached ADU (in-law suite, garage conversion with kitchen) requires building, plumbing, and electrical permits. Septic capacity must be reviewed by the Florida Department of Health in Pasco County if on septic. NOTE: ZIP 34653 spans both the City of New Port Richey (small ~4 sq mi area) and large unincorporated areas of Pasco County. If your address is within incorporated city limits, this dept applies; if unincorporated, contact Pasco County Building Construction Services.

Estimated Fee$500 – $1,500
Typical Timelineabout 4 weeks
SourceCity of New Port Richey Building Division / 2023 Florida Building Code (8th Ed) · view source

ADU Permit Costs: New Port Richey vs. Nearby

New Port Richey comes in on the low side for Florida. You're looking at $500 – $2,000 here, compared to the state average of $762 – $3,934.

CityEstimated Fee
New Port Richey $500 – $2,000
Jacksonville $500 – $5,000
Miami $500 – $5,000
Tampa $500 – $5,000

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all New Port Richey permit costs →

Zoning & HOA Considerations

Zoning

ADU regulations vary dramatically by state and city. Many states (CA, OR, WA) have preemption laws that override local zoning restrictions. Check both state law and local zoning before designing.

HOA Communities

If you live in an HOA community: hOAs have traditionally restricted ADUs, but state preemption laws in CA, OR, WA, and other states now limit HOA authority over ADUs. Check your state's ADU laws, your HOA may not be able to block construction even if CC&Rs appear to prohibit it.

Estimated Project Timeline in New Port Richey

Here's a typical timeline for a adu project in New Port Richey, FL:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to New Port Richey's building department, apply online here.
Week 4-8
Plan review & approval
Typical processing time in New Port Richey: about 4 weeks. Plan review examiner checks drawings for code compliance.
Week 9+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on New Port Richey's typical about 4 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need an ADU permit in New Port Richey, FL?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameCity of New Port Richey Building Division (Development Department)
Address5919 Main Street, New Port Richey, FL 34652

Frequently Asked Questions

Estimated permit fees for ADU projects in New Port Richey, FL range from $500 – $2,000. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller ADU projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in New Port Richey can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for ADU permits in New Port Richey is about 4 weeks. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About ADU Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read ADU Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-05-23. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.