Plumbing Work Permit Requirements in Hollywood, FL

Hollywood is a city of 153,627 residents in Florida that follows the 2021 IRC. Hollywood's building department is stricter than the standard IRC on plumbing work work, expect fewer exemptions and more situations that require a permit. You're looking at roughly $82 – $330 in permit fees, plan on about 2 weeks for approval, plus you can apply online.

By Joey, Founder · Last verified March 29, 2026 · How we research →

Population: 153,627 Code: 2021 Verified: 2026-03-29 4 local rules

When you don’t need a Plumbing permit in Hollywood

Exempt·Rule 1

Replacing a plumbing fixture in the same location does not require a permit.

SourceFlorida Building Code / Broward County

When you need a Plumbing permit in Hollywood

Required·Rule 1

Adding a new plumbing fixture requires a plumbing permit.

Estimated Fee$82 – $330
Typical Timelineabout 2 weeks
SourceFlorida Building Code / Broward County
Required·Rule 2

Rerouting plumbing lines requires a plumbing permit.

Estimated Fee$110 – $440
Typical Timelineabout 2 weeks
SourceFlorida Building Code / Broward County
Required·Rule 3

Water heater replacement requires a plumbing permit.

Estimated Fee$55 – $220
Typical Timeline5 business days
SourceFlorida Building Code / Broward County

What Makes Hollywood Different

Here's how Hollywood's plumbing work rules stack up against the standard IRC baseline that most of the country follows.

Stricter Than the IRC

Adding a new plumbing fixture requires a plumbing permit in Hollywood, FL.

Rerouting plumbing lines requires a plumbing permit in Hollywood, FL.

Water heater replacement requires a plumbing permit in Hollywood, FL.

1 rule match the IRC baseline, no surprises there.

Plumbing Work Permit Costs: Hollywood vs. Nearby

Hollywood comes in on the low side for Florida. You're looking at $55 – $440 here, compared to the state average of $84 – $310.

CityEstimated Fee
Hollywood $55 – $440
Jacksonville $60 – $200
Miami $65 – $520
Tampa $45 – $360

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Hollywood permit costs →

Zoning & HOA Considerations

HOA Communities

If you live in an HOA community: plumbing work is generally interior and does not require HOA approval. However, exterior plumbing changes (new cleanouts, sewer line work, visible piping) may need review in some communities.

Estimated Project Timeline in Hollywood

Here's a typical timeline for a plumbing work project in Hollywood, FL:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to Hollywood's building department, apply online here.
Week 4-6
Plan review & approval
Typical processing time in Hollywood: about 2 weeks. Plan review examiner checks drawings for code compliance.
Week 7+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on Hollywood's typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Plumbing permit in Hollywood, FL?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameBuilding Division
Address2600 Hollywood Blvd, Room 215, Hollywood, FL 33020
HoursMon-Fri 8am-4pm

Frequently Asked Questions

Estimated permit fees for Plumbing Work projects in Hollywood, FL range from $55 – $440. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Plumbing Work projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Hollywood can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Plumbing Work permits in Hollywood is about 2 weeks. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Plumbing Work Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Plumbing Work Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-03-29. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.