Deck Permit Requirements in Centennial, CO

Centennial is a city of 106,883 residents in Colorado that follows the 2018 IRC. Centennial's building department is stricter than the standard IRC on deck work, expect fewer exemptions and more situations that require a permit. You're looking at roughly $90 – $315 in permit fees, plan on about 2 weeks for approval, plus you can apply online.

By Joey, Founder · Last verified March 29, 2026 · How we research →

Population: 106,883 Code: 2018 Verified: 2026-03-29 4 local rules

When you don’t need a Deck permit in Centennial

Exempt·Rule 1

Freestanding decks not more than 30 inches above grade are exempt from a building permit per IRC R105.2.

SourceCity of Centennial Code / 2018 IRC

When you need a Deck permit in Centennial

Required·Rule 1

Attached decks require a building permit even if under 30 inches.

Estimated Fee$90 – $315
Typical Timelineabout 2 weeks
SourceCity of Centennial Code / 2018 IRC
Required·Rule 2

Decks more than 30 inches above grade require a building permit.

Estimated Fee$135 – $450
Typical Timelineabout 2 weeks
SourceCity of Centennial Code / 2018 IRC
Required·Rule 3

Covered decks or those over 300 sq ft require a building permit.

Estimated Fee$180 – $540
Typical Timelineabout 2 weeks
SourceCity of Centennial Code / 2018 IRC

Deck Permit Costs: Centennial vs. Nearby

Centennial comes in on the low side for Colorado. You're looking at $90 – $540 here, compared to the state average of $133 – $443.

CityEstimated Fee
Centennial $90 – $540
Denver $100 – $800
Colorado Springs $100 – $600
Aurora $90 – $720

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Centennial permit costs →

Zoning & HOA Considerations

Zoning

Decks may be subject to zoning setback and lot coverage requirements. Check with your local planning department before building near property lines.

HOA Communities

If you live in an HOA community: many HOAs restrict deck materials, colors, size, and placement. Review your CC&Rs and submit an architectural review request before applying for a building permit. HOA approval can take 1–6 weeks.

Estimated Project Timeline in Centennial

Here's a typical timeline for a deck project in Centennial, CO:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to Centennial's building department, apply online here.
Week 4-6
Plan review & approval
Typical processing time in Centennial: about 2 weeks. Plan review examiner checks drawings for code compliance.
Week 7+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on Centennial's typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Deck permit in Centennial, CO?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameBuilding Division
Address13133 E. Arapahoe Rd., Centennial, CO 80112
HoursMon-Tue 8am-5pm; Wed 9am-5pm; Thu-Fri 8am-5pm

Frequently Asked Questions

Estimated permit fees for Deck projects in Centennial, CO range from $90 – $540. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Deck projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Centennial can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Deck permits in Centennial is about 2 weeks. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Deck Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Deck Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-03-29. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.