EV Charger Permit Requirements in Temple City, CA

Temple City is an incorporated LA County contract city that issues building permits under its own name through the City Community Development Department's Building & Safety Division at City Hall. Day-to-day building official, plan check, inspection, and permit-counter services are contracted to a private firm, Transtech Engineers, Inc., which has provided these services since 2012, so inspections are contracted but the AHJ is the city. Plan check and permit fees (except encroachment) are set at 120 percent of the County of Los Angeles fee schedule and the city directs applicants to LA County Public Works for the base amounts. California enforces statewide Title 24, currently the 2025 California Residential Code (based on the 2024 IRC) effective January 1, 2026.

By Joey, Founder · Last verified June 4, 2026 · How we research →

Code: 2024 IRC (2025 CRC) Verified: 2026-06-04 1 local rules

When you need a EV Charger permit

Required·Rule 1

CA (ZIP 91780), installing a Level 2 EV charger (240V dedicated circuit) requires an electrical permit from the City of Temple City Building & Safety Division under the California Electrical Code; a Level 1 plug-in on a standard 120V outlet does not. An online application is available through the City's Permit & Project Portal, and California's streamlined EV-charger permitting (AB 1236) provides expedited, often over-the-counter approval. A CSLB C-10 contractor is required for work over $500.

Typical Timeline3 business days
SourceCity of Temple City Building & Safety (Transtech) / 2025 California Residential Code (2024 IRC, Title 24) · view source

EV Charger Permit Costs: Temple City vs. Nearby

CityEstimated Fee
Temple City N/A
Los Angeles $75 – $500
Sacramento County $75 – $500
San Diego $75 – $500

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Temple City permit costs →

Zoning Considerations

Zoning

EV chargers in private garages or driveways rarely trigger zoning review. Outdoor pedestal chargers may have setback requirements in some jurisdictions. California AB 1236 prohibits requiring a planning permit for residential EV charger installations, building official review only.

Estimated Project Timeline

Here's a typical timeline for a ev charger project:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings.
Week 2
Submit permit application
Your contractor submits the application to Temple City's building department, apply online here.
Week 3
Plan review & approval
Typical processing time: 3 business days. Application review and permit issuance.
Week 4+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on the typical 3 business days permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need an EV Charger permit?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameCity of Temple City Community Development Department, Building & Safety Division
Address9701 Las Tunas Drive, Temple City, CA 91780
HoursPermit Technicians: Mon-Thu 8:00-11:30 AM & 1:30-4:30 PM; Plan Checkers: Mon & Wed 8:00-11:30 AM; Inspection requests (626) 656-7327, inspections Mon-Thu

Frequently Asked Questions

Contact the building department for current EV Charger permit fee information. Fees typically vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller EV Charger projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for EV Charger permits is 3 business days. More complex projects may take longer if plan review is required.

Learn More About EV Charger Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read EV Charger Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-06-04. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.