Demolition Permit Requirements in San Marino, CA

San Marino is a small affluent residential city in western LA County; ZIP 91108 is wholly within incorporated limits. The City of San Marino Community Development Department (Building & Safety Division) at City Hall (2200 Huntington Drive) handles all permits; LA County DPW does NOT serve San Marino. California 2025 Title 24 framework effective 2026-01-01: 2025 CBC, CRC, CEC, CMC, CPC, California Energy Code, CALGreen with CA amendments, plus San Marino City Code Chapter 25 local amendments. Online portal is CommunityCore: roofing, electrical, and plumbing permits can be issued online; remodels, additions, and other major work require hard-copy submission. Solar applications use SolarAPP+. Inspections Mon-Thu only (no Friday). Over-the-counter VCA plan check available Tuesdays 10-11 AM (first 5 sign-ins). 3 percent credit card processing fee effective 2025-07-13. Fire/EMS by City of San Marino Fire Department (NOT LA County Fire): (626) 300-0735, fire@sanmarinoca.gov. Strict zoning: FAR limits, historic preservation, Mills Act contracts available. Hillside parcels may fall within VHFHSZ per state mapping. CSLB licensing required for projects over $500. Mandatory solar PV on new homes per CA Energy Code 150.1(c)14.

By Joey, Founder · Last verified May 22, 2026 · How we research →

Population: 12,513 Code: 2025 CRC Verified: 2026-05-22 1 local rules

When you need a Demolition permit in San Marino

Required·Rule 1

Demolition of a structure requires a demolition permit. Historic preservation review applies before demolition of any potentially historic structure (designated historic properties have additional restrictions; Mills Act contracts apply). Utility disconnects (water, sewer, gas, electric) must be documented before demolition. California-specific: South Coast Air Quality Management District (SCAQMD) Rule 1403 asbestos notification required for all structures regardless of age (10-day notice for asbestos surveys). Pre-1978 structures: California lead-safe work practices. CALGreen requires construction waste diversion (65%+ to recycling). Submit hard-copy application to City Hall, 2200 Huntington Drive, (626) 300-0700.

Typical Timelineabout 3 weeks
SourceCity of San Marino Building & Safety / SCAQMD Rule 1403 / CALGreen + SMCC Chapter 25 · view source

Demolition Permit Costs: San Marino vs. Nearby

CityEstimated Fee
San Marino N/A
Los Angeles $150 – $1,500
Sacramento County $150 – $1,500
San Diego $150 – $1,500

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all San Marino permit costs →

Zoning & HOA Considerations

Zoning

Properties in historic districts may require historic review board approval before demolition. Some cities require a waiting period for demolition permits to allow for public comment.

HOA Communities

If you live in an HOA community: demolition of visible structures (garages, sheds, accessory buildings) may require HOA notification or approval. Check your CC&Rs, some communities require maintaining certain structures or replacing them within a set timeframe.

Estimated Project Timeline in San Marino

Here's a typical timeline for a demolition project in San Marino, CA:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings.
Week 2
Submit permit application
Your contractor submits the application to San Marino's building department, apply online here.
Week 3-5
Plan review & approval
Typical processing time in San Marino: about 3 weeks. Application review and permit issuance.
Week 6+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on San Marino's typical about 3 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Demolition permit in San Marino, CA?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameCity of San Marino Community Development Department, Building & Safety Division
Address2200 Huntington Drive, San Marino, CA 91108
HoursBuilding Division counter Mon-Thu 7:00 AM - 5:00 PM (payments by 4:00 PM), Fri 7:00 AM - 11:00 AM (payments by 10:00 AM). Planning counter Mon-Thu 7:00 AM - 12:00 PM. Building Inspector Mon-Thu 7:00 AM - 8:00 AM at (626) 300-0753.

Frequently Asked Questions

Contact San Marino's building department for current Demolition permit fee information. Fees typically vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Demolition projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in San Marino can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Demolition permits in San Marino is about 3 weeks. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Demolition Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Demolition Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-05-22. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.