ADU Permit Requirements in Marin County, CA
Marin County Community Development Agency - Building & Safety Division at 3501 Civic Center Drive Suite 308, San Rafael CA 94903 (415-473-6550) issues building permits for unincorporated Marin County, including Greenbrae, Kentfield, and surrounding unincorporated areas of ZIP 94904. ZIP 94904 also has a partial overlap with the incorporated City of Larkspur (Larkspur Building Division at 400 Magnolia Ave Floor 2, Larkspur CA 94939, 415-927-5038, building@cityoflarkspur.org); parcels inside Larkspur city limits use the city building department. California Building Standards Code (Title 24): the 2025 CBC/CRC/CMC/CPC/CEC and Title 24 Part 6 (Energy Code) and Part 11 (CALGreen) took effect January 1, 2026 (replacing 2022 cycle). Marin County adopts Title 24 with local amendments under County Code Title 19, including CALGreen Tier 1 green building measures and provisions for tiny homes, strawbale, cob, light straw-clay, and 3D-printed structures. Distinctive requirements: (1) ALL new 1- and 2-family dwellings must have automatic fire sprinklers per CRC R313 (NFPA 13D); (2) Most of unincorporated Marin including Greenbrae/Kentfield is in Very High Fire Hazard Severity Zone (VHFHSZ) / WUI — Chapter 7A ignition-resistant construction applies, plus PRC § 4291 defensible space (30-150 ft cleared zone, annual Central Marin Fire inspections); (3) State-mandated solar PV on new construction per Title 24 Part 6 § 150.1(c); (4) ADU state preemption (AB 68, AB 881, SB 13, AB 671) — Marin must approve ADUs by-right within 60 days, no minimum lot size, 4-ft setbacks, fee waivers under 750 sq ft; Marin County offers ADU permit fee discounts through 2026; (5) Greenbrae has FEMA flood zones (AE/VE) along Corte Madera Creek — flood insurance and elevation requirements apply; (6) Septic systems regulated by Marin County Environmental Health Services (415-473-6907); (7) Mello-Roos CFD assessments may apply on some parcels. CA Contractors State License Board (CSLB) requires state license for ALL contractors over $500 (B General Building, C-10 Electrical, C-36 Plumbing, C-20 HVAC, etc.). Owner-builder exemption per CSLB requires 1-year prior residence, sale prohibition, max 2 structures in 3 years. CA Climate Zone 3 (coastal temperate); Bay Area is high seismic (SDC D2). Pre-1978 homes: California lead-safe practices required; pre-1980 may have asbestos requiring NESHAP-compliant abatement. BayREN heat pump water heater rebates available.
By Joey, Founder · Last verified April 25, 2026 · How we research →
When you need a ADU permit in Marin County
Accessory dwelling units (ADUs) and junior ADUs (JADUs) are streamlined under California state ADU law (AB 68, AB 881, AB 671, SB 13). Marin County must approve compliant ADUs within 60 days, with no minimum lot size, 4-foot setbacks, parking waivers within 1/2 mile of transit, and reduced impact fees (waived for ADUs under 750 sq ft). Marin County offers ADU permit fee discounts through 2026. ADUs follow standard CRC + Title 24 + CALGreen + fire sprinklers (CRC R313, with some exceptions for small ADUs). VHFHSZ Chapter 7A applies. For septic-system parcels: Marin EHS septic capacity review required.
ADU Permit Costs: Marin County vs. Nearby
| City | Estimated Fee |
|---|---|
| Marin County | N/A |
| Los Angeles | $750 – $7,500 |
| Sacramento County | $750 – $7,500 |
| San Diego | $750 – $7,500 |
Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Marin County permit costs →
Real ADU Permit Data for Marin County
From our own dataset of permits filed in Marin County over the last 3 years.
Most-active contractor: Owner with 4 permits filed.
These figures reflect actual permits issued in Marin County, not state averages or estimates. Your project may differ based on scope, valuation, and the specific work proposed.
Zoning & HOA Considerations
ADU regulations vary dramatically by state and city. Many states (CA, OR, WA) have preemption laws that override local zoning restrictions. Check both state law and local zoning before designing.
If you live in an HOA community: hOAs have traditionally restricted ADUs, but state preemption laws in CA, OR, WA, and other states now limit HOA authority over ADUs. Check your state's ADU laws, your HOA may not be able to block construction even if CC&Rs appear to prohibit it.
Estimated Project Timeline in Marin County
Here's a typical timeline for a adu project in Marin County, CA:
Timeline is based on Marin County's typical about 9 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.
Need an ADU permit in Marin County, CA?
Answer a few quick questions for a personalized answer about your specific project.
Check Now, Free →Building Department Contact
Frequently Asked Questions
Contact Marin County's building department for current ADU permit fee information. Fees typically vary based on project scope and valuation.
It depends on the specifics of your project. Some smaller ADU projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.
Working without a required permit in Marin County can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.
Typical approval time for ADU permits in Marin County is about 9 weeks. More complex projects may take longer if plan review is required.
If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.
Learn More About ADU Permits
Read our complete guide covering permit requirements, costs, common exemptions, and the application process.
Read ADU Guide →