Long Beach is a city of 466,742 residents in California that follows the 2021 IRC. For shed / outbuilding projects, Long Beach follows the IRC pretty closely — no major surprises compared to what most cities require. You're looking at roughly $170 – $680 in permit fees, plan on about About 2 weeks for approval — plus you can apply online.

By Joey, Founder · Last verified March 29, 2026 · How we research →

Population: 466,742 Code: 2021 Verified: 2026-03-29 4 local rules

When you don’t need a permit

Exempt·Rule 1

Detached accessory structures (sheds) not exceeding 120 square feet, single story, without electrical or plumbing, are exempt from building permits per CBC §105.2. The structure must be used for storage only and not for habitation.

SourceLBMC §91.106.2 / CBC §105.2

When you do need a permit

Required·Rule 1

Any accessory structure with electrical wiring requires both a building permit and an electrical permit. Electrical work must be performed by a licensed C-10 electrical contractor or the homeowner under an owner-builder permit with proper disclosure.

Estimated Fee$170 – $680
Typical TimelineAbout 2 weeks
SourceLBMC / CBC §105.1, CEC
Required·Rule 2

Any accessory structure with plumbing requires both a building permit and a plumbing permit. Plumbing work must be performed by a licensed plumbing contractor or the homeowner under an owner-builder permit.

Estimated Fee$212 – $850
Typical TimelineAbout 2 weeks
SourceLBMC / CBC §105.1, CPC
Required·Rule 3

Accessory structures exceeding 120 square feet require a building permit. Plans showing the structure's dimensions, setbacks, and construction details must be submitted for review.

Estimated Fee$170 – $1,020
Typical TimelineAbout 2 weeks
SourceLBMC / CBC §105.1

What Makes Long Beach Different

Here's how Long Beach's shed / outbuilding rules stack up against the standard IRC baseline that most of the country follows.

Stricter Than the IRC

Any accessory structure with electrical wiring requires both a building permit and an electrical permit. Electrical work must be performed by a licensed C-10 electrical contractor or the homeowner under an owner-builder permit with proper disclosure.

Any accessory structure with plumbing requires both a building permit and a plumbing permit. Plumbing work must be performed by a licensed plumbing contractor or the homeowner under an owner-builder permit.

Accessory structures exceeding 120 square feet require a building permit. Plans showing the structure's dimensions, setbacks, and construction details must be submitted for review.

1 rule match the IRC baseline — no surprises there.

Shed / Outbuilding Permit Costs: Long Beach vs. Nearby

Long Beach runs higher than average for California. Expect $170 – $1,020 versus the state average of $105 – $429.

Zoning & HOA Considerations

Zoning

Sheds may be subject to zoning setback requirements and lot coverage limits. Placement near property lines or in front yards may require zoning approval.

HOA Communities

If you live in an HOA community: many HOAs restrict or prohibit outbuildings. Check your CC&Rs for rules on shed size, placement, materials, and appearance before purchasing or building.

Estimated Project Timeline in Long Beach

Here's a typical timeline for a shed / outbuilding project in Long Beach, CA:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to Long Beach's building department — apply online here.
Week 4-5
Plan review & approval
Typical processing time in Long Beach: About 2 weeks. Plan review examiner checks drawings for code compliance.
Week 6+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on Long Beach's typical About 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Check your specific project

Answer a few quick questions to get a personalized answer for your exact project.

Check Now — Free →

Building Department Contact

NameDevelopment Services - Building and Safety
Address411 W Ocean Blvd, Long Beach, CA 90802
HoursMon-Fri 7:30am-4:30pm

Frequently Asked Questions

Estimated permit fees for Shed / Outbuilding projects in Long Beach, CA range from $170 – $680. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Shed / Outbuilding projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Long Beach can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Shed / Outbuilding permits in Long Beach is About 2 weeks. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate — you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Shed / Outbuilding Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Shed / Outbuilding Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-03-29. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.