Shed / Outbuilding Permit Requirements in Glendale, CA

Glendale is a city of 196,543 residents in California that follows the 2021 IRC. For shed / outbuilding projects, Glendale follows the IRC pretty closely, no major surprises compared to what most cities require. You're looking at roughly $190 – $760 in permit fees, plan on about 2 weeks for approval, plus you can apply online.

By Joey, Founder · Last verified March 29, 2026 · How we research →

Population: 196,543 Code: 2021 Verified: 2026-03-29 4 local rules 1 people checked this

When you don’t need a Shed permit in Glendale

Exempt·Rule 1

Detached accessory structures (sheds) not exceeding 120 square feet, single story, without electrical or plumbing, are exempt from building permits per CBC §105.2. The structure must be used for storage only and not for habitation.

SourceGMC §91.106.2 / CBC §105.2

When you need a Shed permit in Glendale

Required·Rule 1

Any accessory structure with electrical wiring requires both a building permit and an electrical permit. Electrical work must be performed by a licensed C-10 electrical contractor or the homeowner under an owner-builder permit with proper disclosure.

Estimated Fee$190 – $760
Typical Timelineabout 2 weeks
SourceGMC / CBC §105.1, CEC
Required·Rule 2

Any accessory structure with plumbing requires both a building permit and a plumbing permit. Plumbing work must be performed by a licensed plumbing contractor or the homeowner under an owner-builder permit.

Estimated Fee$238 – $950
Typical Timelineabout 2 weeks
SourceGMC / CBC §105.1, CPC
Required·Rule 3

Accessory structures exceeding 120 square feet require a building permit. Plans showing the structure's dimensions, setbacks, and construction details must be submitted for review.

Estimated Fee$190 – $1,140
Typical Timelineabout 2 weeks
SourceGMC / CBC §105.1

What Makes Glendale Different

Here's how Glendale's shed / outbuilding rules stack up against the standard IRC baseline that most of the country follows.

Stricter Than the IRC

Any accessory structure with electrical wiring requires both a building permit and an electrical permit. Electrical work must be performed by a licensed C-10 electrical contractor or the homeowner under an owner-builder permit with proper disclosure.

Any accessory structure with plumbing requires both a building permit and a plumbing permit. Plumbing work must be performed by a licensed plumbing contractor or the homeowner under an owner-builder permit.

Accessory structures exceeding 120 square feet require a building permit. Plans showing the structure's dimensions, setbacks, and construction details must be submitted for review.

1 rule match the IRC baseline, no surprises there.

Shed / Outbuilding Permit Costs: Glendale vs. Nearby

Glendale runs higher than average for California. Expect $190 – $1,140 versus the state average of $105 – $428.

CityEstimated Fee
Glendale $190 – $1,140
Los Angeles $200 – $1,200
Sacramento County $50 – $250
San Diego $170 – $1,020

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Glendale permit costs →

Zoning & HOA Considerations

Zoning

Sheds may be subject to zoning setback requirements and lot coverage limits. Placement near property lines or in front yards may require zoning approval.

HOA Communities

If you live in an HOA community: many HOAs restrict or prohibit outbuildings. Check your CC&Rs for rules on shed size, placement, materials, and appearance before purchasing or building.

Estimated Project Timeline in Glendale

Here's a typical timeline for a shed / outbuilding project in Glendale, CA:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to Glendale's building department, apply online here.
Week 4-5
Plan review & approval
Typical processing time in Glendale: about 2 weeks. Plan review examiner checks drawings for code compliance.
Week 6+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on Glendale's typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Shed permit in Glendale, CA?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameCommunity Development Department - Building & Safety
Address633 E Broadway, Room 101, Glendale, CA 91206
HoursMon-Thu 7:30am-5:30pm, Fri 8am-5pm

Frequently Asked Questions

Estimated permit fees for Shed / Outbuilding projects in Glendale, CA range from $190 – $1,140. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Shed / Outbuilding projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Glendale can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Shed / Outbuilding permits in Glendale is about 2 weeks. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Shed / Outbuilding Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Shed / Outbuilding Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-03-29. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.