Window / Door Permit Requirements in Beverly Hills, CA

Beverly Hills enforces the 2022 California Residential Code (2021 IRC with CA amendments) via the Beverly Hills Municipal Code. Permits are handled by the Community Development Department (CDD). Beverly Hills is known for stricter-than-typical design review, historic preservation, and neighborhood compatibility requirements — projects visible from the public right-of-way often require a Design Review Commission sign-off in addition to the standard building permit. Contractors must be licensed with the CA Contractors State License Board; owner-builder permits are allowed for primary residences. Many simple residential permits can be applied for online via the city's Accela-powered portal.

By Joey, Founder · Last verified April 16, 2026 · How we research →

Population: 32,701 Code: 2022 Verified: 2026-04-16 3 local rules

When you don’t need a Window & Door permit in Beverly Hills

Exempt·Rule 1

Replacing exterior windows or doors same-size does not require a permit.

SourceCalifornia Building Code / 2022 IRC with local amendments · view source
Exempt·Rule 2

Replacing interior doors same-size does not require a permit.

SourceCalifornia Building Code / 2022 IRC with local amendments · view source

When you need a Window & Door permit in Beverly Hills

Required·Rule 1

Changing window or door sizes requires a building permit.

Estimated Fee$77 – $310
Typical Timelineabout 2 weeks
SourceCalifornia Building Code / 2022 IRC with local amendments · view source

Window / Door Permit Costs: Beverly Hills vs. Nearby

Beverly Hills comes in on the low side for California. You're looking at $77 – $310 here, compared to the state average of $132 – $505.

CityEstimated Fee
Beverly Hills $77 – $310
Los Angeles $100 – $1,200
Sacramento County $75 – $300
San Diego $85 – $1,020

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Beverly Hills permit costs →

Zoning & HOA Considerations

HOA Communities

If you live in an HOA community: hOAs in some communities regulate exterior window styles, frame colors, and door designs. Changing window types or adding new openings may require architectural review approval.

Estimated Project Timeline in Beverly Hills

Here's a typical timeline for a window / door project in Beverly Hills, CA:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to Beverly Hills's building department, apply online here.
Week 4-5
Plan review & approval
Typical processing time in Beverly Hills: about 2 weeks. Plan review examiner checks drawings for code compliance.
Week 6+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on Beverly Hills's typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Window & Door permit in Beverly Hills, CA?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameBeverly Hills Community Development Department
Address455 N. Rexford Drive, Beverly Hills, CA 90210
HoursMon-Thu 7:30am-5:30pm, Fri 8am-5pm (alt Fri closed)

Frequently Asked Questions

Estimated permit fees for Window / Door projects in Beverly Hills, CA range from $77 – $310. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Window / Door projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Beverly Hills can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Window / Door permits in Beverly Hills is about 2 weeks. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Window / Door Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Window / Door Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-04-16. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.