Patio / Hardscape Permit Requirements in Beverly Hills, CA

Beverly Hills enforces the 2022 California Residential Code (2021 IRC with CA amendments) via the Beverly Hills Municipal Code. Permits are handled by the Community Development Department (CDD). Beverly Hills is known for stricter-than-typical design review, historic preservation, and neighborhood compatibility requirements — projects visible from the public right-of-way often require a Design Review Commission sign-off in addition to the standard building permit. Contractors must be licensed with the CA Contractors State License Board; owner-builder permits are allowed for primary residences. Many simple residential permits can be applied for online via the city's Accela-powered portal.

By Joey, Founder · Last verified April 16, 2026 · How we research →

Population: 32,701 Code: 2022 Verified: 2026-04-16 3 local rules

When you don’t need a Patio / Hardscape permit in Beverly Hills

Exempt·Rule 1

Uncovered at-grade patios under 200 square feet generally do not require a building permit. The patio must still comply with setback requirements and impervious surface limits.

SourceCalifornia Building Code / 2022 IRC with local amendments

When you need a Patio / Hardscape permit in Beverly Hills

Required·Rule 1

Covered patios with a solid roof structure require a building permit. They are treated as structural additions and must meet wind and snow load requirements, setback rules, and building code standards.

Estimated Fee$259 – $862
Typical Timelineabout 2 weeks
SourceCalifornia Building Code / 2022 IRC with local amendments
Required·Rule 2

Elevated patios or platforms more than 30 inches above grade are treated as decks and require a building permit. Structural footings, guard rails (minimum 36 inches), and inspections are required.

Estimated Fee$172 – $690
Typical Timelineabout 2 weeks
SourceCalifornia Building Code / 2022 IRC with local amendments

Patio / Hardscape Permit Costs: Beverly Hills vs. Nearby

Beverly Hills's fees are right in line with the California average, $172 – $862 versus $189 – $676 statewide.

CityEstimated Fee
Beverly Hills $172 – $862
Los Angeles $150 – $750
Sacramento County $150 – $750
San Diego $150 – $750

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Beverly Hills permit costs →

Zoning & HOA Considerations

Zoning

Patios contribute to impervious surface coverage on your lot. Many cities cap total impervious coverage at 40–60% of lot area. Check with your planning department before adding large hardscape areas.

HOA Communities

If you live in an HOA community: hOAs may restrict patio materials, colors, and sizes. Covered patios and pergolas are more likely to need architectural review. Check your CC&Rs before starting, even for simple ground-level projects.

Estimated Project Timeline in Beverly Hills

Here's a typical timeline for a patio / hardscape project in Beverly Hills, CA:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to Beverly Hills's building department, apply online here.
Week 4-5
Plan review & approval
Typical processing time in Beverly Hills: about 2 weeks. Plan review examiner checks drawings for code compliance.
Week 6+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on Beverly Hills's typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Patio / Hardscape permit in Beverly Hills, CA?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameBeverly Hills Community Development Department
Address455 N. Rexford Drive, Beverly Hills, CA 90210
HoursMon-Thu 7:30am-5:30pm, Fri 8am-5pm (alt Fri closed)

Frequently Asked Questions

Estimated permit fees for Patio / Hardscape projects in Beverly Hills, CA range from $172 – $862. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Patio / Hardscape projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Beverly Hills can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Patio / Hardscape permits in Beverly Hills is about 2 weeks. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Patio / Hardscape Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Patio / Hardscape Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-04-16. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.