Retaining Wall Permit Requirements in Fairfield Bay, AR

Fairfield Bay is an incorporated city straddling Van Buren and Cleburne Counties (ZIP 72088). It runs its own building-permit program through the city Code Enforcement Division, headed by Building Official / Code Enforcement Officer Dallas Clark (501-884-3130, ffbc@cityoffairfieldbay.com), at 130 Village, Suite 2A. Because the city issues permits citywide, the county of the parcel does not change the AHJ. Building permit applications (building, new construction, electrical, mechanical) are downloadable PDFs submitted in person; separate permits are required for electrical/gas/plumbing/mechanical work, and a certificate of occupancy is issued at completion. Subdivision covenants/restrictions also apply and the more restrictive of code vs covenant is enforced. Statewide Arkansas Fire Prevention Code Vol. III (2021 IRC) provides the baseline. City does not publish fees, a fee-schedule URL, an online portal, or a specific adopted IRC edition. Email from current city website (legacy PDF showed ffbc@artelco.com, not used).

By Joey, Founder · Last verified May 31, 2026 · How we research →

Code: Not specified in a published city edition. Statewide, the Arkansas Fire Prevention Code Volume III (based on the 2021 IRC) applies, with permits issued and enforced locally; the city's permit form references compliance with local code and Municipal Code but does not name an IRC edition. Verified: 2026-05-31 1 local rules

When you don’t need a Retaining Wall permit

Exempt·Rule 1

The City of Fairfield Bay Code Enforcement Division (Building Official Dallas Clark) issues building permits citywide, so the county a parcel sits in does not change the jurisdiction. The statewide Arkansas Fire Prevention Code Volume III (based on the 2021 IRC) provides the baseline residential standard. A retaining wall not over 4 feet high measured from the bottom of the footing to the top of the wall, and not supporting a surcharge, is generally exempt under the residential code (2021 IRC default). A taller wall, or any wall supporting a slope or driveway, requires a building permit and an engineered design; the hilly Fairfield Bay terrain makes drainage design important. Permit applications are downloadable PDFs submitted in person, and subdivision covenants also apply, with the more restrictive of code or covenant enforced.

SourceCity of Fairfield Bay Code Enforcement Division / Arkansas Fire Prevention Code Vol. III (2021 IRC) · view source

Retaining Wall Permit Costs: Fairfield Bay vs. Nearby

CityEstimated Fee
Fairfield Bay N/A
Little Rock $150 – $600
Fayetteville $150 – $600
Springdale $60 – $300

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Fairfield Bay permit costs →

Zoning Considerations

Zoning

Retaining walls near property lines may require zoning setback review. Walls that significantly change the grade of a property may need additional zoning approval.

Estimated Project Timeline

Here's a typical timeline for a retaining wall project:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings.
Week 2
Submit permit application
Your contractor submits the application to Fairfield Bay's building department.
Week 3-4
Plan review & approval
Processing time varies, contact Fairfield Bay's building department for current turnaround times.
Week 5+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Need a Retaining Wall permit?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameCity of Fairfield Bay - Code Enforcement Division (Building Official & Code Enforcement)
Address130 Village, Suite 2A, Fairfield Bay, AR 72088

Frequently Asked Questions

Contact the building department for current Retaining Wall permit fee information. Fees typically vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Retaining Wall projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Contact the building department for current processing times. Timelines vary based on project complexity and whether plan review is required.

Learn More About Retaining Wall Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Retaining Wall Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-05-31. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.