Camden is a mid-size city of 10,474 residents in Arkansas that follows the 2021 IRC. Camden's building department is stricter than the standard IRC on gas line work, expect fewer exemptions and more situations that require a permit. You're looking at roughly $50 – $130 in permit fees, plan on about 5 business days for approval, plus you can apply online.
By Joey, Founder · Last verified March 29, 2026 · How we research →
When you don’t need a permit
Relighting a pilot light, adjusting a gas appliance shutoff valve, or replacing a listed flexible appliance connector at an existing appliance location does not require a permit under Arkansas Fire Prevention Code / 2018 IRC / City of Camden Building Department. Any new piping, extension of existing piping, or new appliance connection requires a plumbing permit.
When you do need a permit
Running new gas piping or extending an existing gas line to connect a new appliance requires a plumbing permit under Arkansas Fire Prevention Code / 2018 IRC / City of Camden Building Department. A licensed plumber must install and pressure-test all new gas piping. Inspection is required before concealment.
Extending an underground gas service line or installing a new gas meter/service requires a plumbing permit and utility coordination under Arkansas Fire Prevention Code / 2018 IRC / City of Camden Building Department. Work must be performed by a licensed plumber. The utility company must inspect and approve the service extension before the meter is set.
Gas Line Permit Costs: Camden vs. Nearby
Camden comes in on the low side for Arkansas. You're looking at $50 – $200 here, compared to the state average of $66 – $329.
| City | Estimated Fee |
|---|---|
| Camden | $50 – $200 |
| Little Rock | $75 – $400 |
| Little Rock | $50 – $300 |
| Little Rock | $75 – $300 |
Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation.
Zoning & HOA Considerations
Gas line work itself does not typically trigger zoning review, but outdoor gas lines to appliances (fire pits, pool heaters, outdoor kitchens, generators) may be subject to setback rules based on the appliance being served.
If you live in an HOA community: hOAs generally do not restrict gas line installation for indoor appliances, but may regulate outdoor gas features (fire pits, outdoor kitchens) and their visibility. Outdoor propane tanks often face placement and screening requirements.
Estimated Project Timeline in Camden
Here's a typical timeline for a gas line project in Camden, AR:
Timeline is based on Camden's typical About 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.
Check your specific project
Answer a few quick questions to get a personalized answer for your exact project.
Check Now, Free →Building Department Contact
Frequently Asked Questions
Estimated permit fees for Gas Line projects in Camden, AR range from $50 – $130. Fees vary based on project scope and valuation.
It depends on the specifics of your project. Some smaller Gas Line projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.
Working without a required permit in Camden can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.
Typical approval time for Gas Line permits in Camden is 5 business days. More complex projects may take longer if plan review is required.
If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.