Gas Line Permit Requirements in Camden, AR

Camden is a mid-size city of 10,474 residents in Arkansas that follows the 2021 IRC. Camden's building department is stricter than the standard IRC on gas line work, expect fewer exemptions and more situations that require a permit. You're looking at roughly $50 – $130 in permit fees, plan on about 5 business days for approval, plus you can apply online.

By Joey, Founder · Last verified March 29, 2026 · How we research →

Population: 10,474 Code: 2021 Verified: 2026-03-29 3 local rules

When you don’t need a permit

Exempt·Rule 1

Relighting a pilot light, adjusting a gas appliance shutoff valve, or replacing a listed flexible appliance connector at an existing appliance location does not require a permit under Arkansas Fire Prevention Code / 2018 IRC / City of Camden Building Department. Any new piping, extension of existing piping, or new appliance connection requires a plumbing permit.

SourceArkansas Fire Prevention Code / 2018 IRC / City of Camden Building Department · view source

When you do need a permit

Required·Rule 1

Running new gas piping or extending an existing gas line to connect a new appliance requires a plumbing permit under Arkansas Fire Prevention Code / 2018 IRC / City of Camden Building Department. A licensed plumber must install and pressure-test all new gas piping. Inspection is required before concealment.

Estimated Fee$50 – $130
Typical Timeline5 business days
SourceArkansas Fire Prevention Code / 2018 IRC / City of Camden Building Department · view source
Required·Rule 2

Extending an underground gas service line or installing a new gas meter/service requires a plumbing permit and utility coordination under Arkansas Fire Prevention Code / 2018 IRC / City of Camden Building Department. Work must be performed by a licensed plumber. The utility company must inspect and approve the service extension before the meter is set.

Estimated Fee$75 – $200
Typical TimelineAbout 2 weeks
SourceArkansas Fire Prevention Code / 2018 IRC / City of Camden Building Department · view source

Gas Line Permit Costs: Camden vs. Nearby

Camden comes in on the low side for Arkansas. You're looking at $50 – $200 here, compared to the state average of $66 – $329.

CityEstimated Fee
Camden $50 – $200
Little Rock $75 – $400
Little Rock $50 – $300
Little Rock $75 – $300

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation.

Zoning & HOA Considerations

Zoning

Gas line work itself does not typically trigger zoning review, but outdoor gas lines to appliances (fire pits, pool heaters, outdoor kitchens, generators) may be subject to setback rules based on the appliance being served.

HOA Communities

If you live in an HOA community: hOAs generally do not restrict gas line installation for indoor appliances, but may regulate outdoor gas features (fire pits, outdoor kitchens) and their visibility. Outdoor propane tanks often face placement and screening requirements.

Estimated Project Timeline in Camden

Here's a typical timeline for a gas line project in Camden, AR:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to Camden's building department, apply online here.
Week 4-5
Plan review & approval
Typical processing time in Camden: About 2 weeks. Plan review examiner checks drawings for code compliance.
Week 6+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on Camden's typical About 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Check your specific project

Answer a few quick questions to get a personalized answer for your exact project.

Check Now, Free →

Building Department Contact

NameCamden Building Department
Address177 Jackson St SW, Camden, AR 71701
HoursMon-Fri 8am-5pm

Frequently Asked Questions

Estimated permit fees for Gas Line projects in Camden, AR range from $50 – $130. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Gas Line projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Camden can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Gas Line permits in Camden is 5 business days. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Gas Line Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Gas Line Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-03-29. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.