Fireplace Permit Requirements in Camden, AR

Camden is a mid-size city of 10,474 residents in Arkansas that follows the 2021 IRC. Camden's building department is stricter than the standard IRC on fireplace work, expect fewer exemptions and more situations that require a permit. You're looking at roughly $50 – $140 in permit fees, plan on 5 business days for approval, plus you can apply online.

By Joey, Founder · Last verified March 29, 2026 · How we research →

Population: 10,474 Code: 2021 Verified: 2026-03-29 4 local rules

When you don’t need a Fireplace permit in Camden

Exempt·Rule 1

Installing a decorative vent-free gas log set into an existing masonry fireplace (with no new gas piping) is generally exempt from a permit under Arkansas Fire Prevention Code / 2018 IRC / City of Camden Building Department. The gas shutoff must already exist at the hearth. Vent-free units must be listed per ANSI Z21.11.2 and not used in bedrooms.

SourceArkansas Fire Prevention Code / 2018 IRC / City of Camden Building Department · view source

When you need a Fireplace permit in Camden

Required·Rule 1

Installing a new gas fireplace insert into an existing masonry opening (using existing gas line) requires a mechanical permit under Arkansas Fire Prevention Code / 2018 IRC / City of Camden Building Department. The unit must be listed per ANSI Z21.50 and installed per manufacturer instructions. A gas pressure test is required.

Estimated Fee$50 – $140
Typical Timeline5 business days
SourceArkansas Fire Prevention Code / 2018 IRC / City of Camden Building Department · view source
Required·Rule 2

New wood-burning fireplace construction requires both a building permit and a mechanical permit under Arkansas Fire Prevention Code / 2018 IRC / City of Camden Building Department. Work must comply with IRC Chapter 10 (Chimneys and Fireplaces) including foundation, firebox, hearth, and chimney requirements. The 2-10-3 rule applies to chimney height.

Estimated Fee$100 – $200
Typical Timelineabout 2 weeks
SourceArkansas Fire Prevention Code / 2018 IRC / City of Camden Building Department · view source
Required·Rule 3

Installing a gas fireplace with a new gas line extension requires building, mechanical, and plumbing permits under Arkansas Fire Prevention Code / 2018 IRC / City of Camden Building Department. A licensed plumber must install the gas piping; a licensed HVAC/mechanical contractor must install the appliance. Separate inspections are required for gas piping and the final mechanical installation.

Estimated Fee$100 – $200
Typical Timelineabout 2 weeks
SourceArkansas Fire Prevention Code / 2018 IRC / City of Camden Building Department · view source

Fireplace Permit Costs: Camden vs. Nearby

Camden comes in on the low side for Arkansas. You're looking at $50 – $200 here, compared to the state average of $130 – $467.

CityEstimated Fee
Camden $50 – $200
Little Rock $75 – $800
Fayetteville $75 – $800
Springdale $75 – $800

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Camden permit costs →

Zoning & HOA Considerations

Zoning

Fireplace and wood stove installations rarely trigger zoning review. Many California air quality districts (SCAQMD, BAAQMD) prohibit NEW wood-burning fireplaces in new construction. Chimney height requirements must comply with IRC R1003.9 (3 ft above roof penetration, 2 ft above any point within 10 ft horizontally).

HOA Communities

If you live in an HOA community: hOAs in some communities prohibit wood-burning appliances entirely due to smoke and air quality concerns. Gas fireplaces are usually permitted. Chimney caps and exterior venting may face aesthetic review.

Estimated Project Timeline in Camden

Here's a typical timeline for a fireplace project in Camden, AR:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to Camden's building department, apply online here.
Week 4-6
Plan review & approval
Typical processing time in Camden: about 2 weeks. Plan review examiner checks drawings for code compliance.
Week 7+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on Camden's typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Fireplace permit in Camden, AR?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameCamden Building Department
Address177 Jackson St SW, Camden, AR 71701
HoursMon-Fri 8am-5pm

Frequently Asked Questions

Estimated permit fees for Fireplace projects in Camden, AR range from $50 – $200. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Fireplace projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Camden can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Fireplace permits in Camden is 5 business days. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Fireplace Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Fireplace Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-03-29. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.