Shed Permit Requirements in Show Low, AZ
The City of Show Low is an incorporated city (pop. 11,732, 2020) in Navajo County and runs its own Building Safety Department at City Hall, 180 N. 9th St. Permits line is 928-532-4042, administration 928-532-4050, and the 24-hour inspection line is 928-532-4055. ZIP 85901 is a large rural ZIP (about 260 sq mi) where the City of Show Low covers only roughly 15.78 percent; the balance is unincorporated Navajo County and CDPs (Linden, White Mountain Lake, Wagon Wheel, Lake of the Woods, etc.) permitted by Navajo County Planning and Development Services (1100 E. Thornton Rd., Show Low), so addresses must be checked against city limits to pick the correct AHJ. The showlowaz.gov website sits behind a JavaScript bot-wall (CivicEngage Client Challenge), so its pages return a challenge page to curl but resolve normally in a browser.
By Joey, Founder · Last verified June 4, 2026 · How we research →
When you need a Shed permit
AZ (ZIP 85901), a detached shed greater than 200 sq ft under roof requires a building permit from the City of Show Low Building Safety Department, and any shed of any size with electricity, plumbing, or attached to another structure also requires a permit. Show Low offers a complimentary (free) shed permit and staff review. Prefabricated sheds over 200 sq ft and shipping containers in residential areas are prohibited. Accessory structures must be at least 5 ft from the side and rear property lines per Title 19.25.060(F). Apply at City Hall, 180 N. 9th St. (permits 928-532-4042). ZIP 85901 covers a large rural area, so confirm the property is inside Show Low city limits; if it is outside, contact Navajo County Planning and Development Services instead.
Shed Permit Costs: Show Low vs. Nearby
| City | Estimated Fee |
|---|---|
| Show Low | N/A |
| Phoenix | $90 – $450 |
| Tucson | $50 – $300 |
| Mesa | $80 – $405 |
Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Show Low permit costs →
Zoning Considerations
Sheds may be subject to zoning setback requirements and lot coverage limits. Placement near property lines or in front yards may require zoning approval.
Estimated Project Timeline
Here's a typical timeline for a shed project:
Timeline is based on the typical about 1 week permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.
Need a Shed permit?
Answer a few quick questions for a personalized answer about your specific project.
Check Now, Free →Building Department Contact
Frequently Asked Questions
Contact the building department for current Shed permit fee information. Fees typically vary based on project scope and valuation.
It depends on the specifics of your project. Some smaller Shed projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.
Working without a required permit can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.
Typical approval time for Shed permits is about 1 week. More complex projects may take longer if plan review is required.
Learn More About Shed Permits
Read our complete guide covering permit requirements, costs, common exemptions, and the application process.
Read Shed Guide →