Room Addition Permit Requirements in Show Low, AZ

The City of Show Low is an incorporated city (pop. 11,732, 2020) in Navajo County and runs its own Building Safety Department at City Hall, 180 N. 9th St. Permits line is 928-532-4042, administration 928-532-4050, and the 24-hour inspection line is 928-532-4055. ZIP 85901 is a large rural ZIP (about 260 sq mi) where the City of Show Low covers only roughly 15.78 percent; the balance is unincorporated Navajo County and CDPs (Linden, White Mountain Lake, Wagon Wheel, Lake of the Woods, etc.) permitted by Navajo County Planning and Development Services (1100 E. Thornton Rd., Show Low), so addresses must be checked against city limits to pick the correct AHJ. The showlowaz.gov website sits behind a JavaScript bot-wall (CivicEngage Client Challenge), so its pages return a challenge page to curl but resolve normally in a browser.

By Joey, Founder · Last verified June 4, 2026 · How we research →

Code: 2018 IRC Verified: 2026-06-04 1 local rules

When you need a Addition permit

Required·Rule 1

AZ (ZIP 85901), an addition to a home requires a building permit from the City of Show Low Building Safety Department, which enforces the 2018 IRC adopted under Show Low City Code 18.05.040. File at City Hall, 180 N. 9th St. (permits 928-532-4042), or through the iWorQ online portal. Because ZIP 85901 spans a large rural area where the city covers only the incorporated portion, confirm the property is inside Show Low city limits; if it is outside, contact Navajo County Planning and Development Services for the permit instead.

Typical Timelineabout 3 weeks
SourceCity of Show Low Building Safety Department / Show Low City Code 18.05.040 (2018 IRC) · view source

Room Addition Permit Costs: Show Low vs. Nearby

CityEstimated Fee
Show Low N/A
Phoenix $360 – $4,500
Tucson $300 – $5,000
Mesa $325 – $4,050

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Show Low permit costs →

Zoning Considerations

Zoning

Room additions typically require zoning review for setbacks, height limits, and lot coverage. Your addition must comply with your zoning district's building envelope requirements.

Estimated Project Timeline

Here's a typical timeline for a room addition project:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to Show Low's building department, apply online here.
Week 4-6
Plan review & approval
Typical processing time: about 3 weeks. Plan review examiner checks drawings for code compliance.
Week 7+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on the typical about 3 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need an Addition permit?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameCity of Show Low Building Safety Department
Address180 N. 9th Street, Show Low, AZ 85901
HoursMonday-Friday 9 a.m. to 12 p.m. and 1 p.m. to 4 p.m. (or by appointment), excluding holidays

Frequently Asked Questions

Contact the building department for current Room Addition permit fee information. Fees typically vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Room Addition projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Room Addition permits is about 3 weeks. More complex projects may take longer if plan review is required.

Learn More About Room Addition Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Room Addition Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-06-04. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.