Kitchen Remodel Permit Requirements in Foley, AL

City of Foley Building Department (Building Official Jonathan Cottis) issues all building, electrical, plumbing, and mechanical permits for parcels inside Foley city limits. Baldwin County Building Inspection handles unincorporated areas; Gulf Shores (36542) and Orange Beach (36561) run their own departments. IMPORTANT: ZIP 36535 crosses city boundaries — not every 36535 address is inside Foley. Confirm jurisdiction by parcel before applying; unincorporated 36535 parcels route to Baldwin County (251-972-6845). ZIP 36536 is a PO-Box-only ZIP. Foley's 2024 Building Code Ordinance (filed Sept 2025) aligns with Baldwin County's 2024 IBC/IRC adoption effective 2025-03-05. Coastal hurricane-prone region: wind-borne debris zone requires impact-rated windows/doors or approved shutters on ALL openings; wind speed per ASCE Hazard Tool (ascehazardtool.org) typically ~150-160 mph Vult with Exposure D near coast, Exposure C inland. Coastal A-Zone / V-Zone Design Certificate is required for flood-prone parcels. Foley is #3 nationally for IBHS Fortified Home designations; city adopted the Coastal Supplemental Code in 2015. Strengthen Alabama Homes grant program (Alabama Dept of Insurance) provides up to $10,000 for Fortified retrofits. Online permit portal is Citizenserve (installation 400). New fee schedule effective 2026-03-01. Climate Zone 2A. Septic (on-site sewage) permits through Alabama Department of Public Health, Baldwin County office. Building permit application submitted via Citizenserve portal; inspections scheduled via same portal with 24-hour notice.

By Joey, Founder · Last verified April 24, 2026 · How we research →

Population: 23,432 Code: 2024 IRC Verified: 2026-04-24 1 local rules

When you need a Kitchen permit in Foley

Required·Rule 1

A kitchen remodel that moves plumbing, adds circuits, or alters structural elements requires a building permit plus trade permits. Cabinet-and-countertop swaps without moving any supply, drain, gas, or circuit are typically exempt. Alabama-licensed trades required.

Typical Timelineabout 2 weeks
SourceCity of Foley Building Department / 2024 IRC / NEC 2023 · view source

Kitchen Remodel Permit Costs: Foley vs. Nearby

CityEstimated Fee
Foley N/A
Huntsville $200 – $1,200
Mobile $200 – $1,200
Birmingham $200 – $1,200

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Foley permit costs →

Zoning & HOA Considerations

HOA Communities

If you live in an HOA community: interior kitchen remodels typically don't require HOA approval. If exterior changes are involved (new exhaust vents, windows, or gas line routing), check your CC&Rs.

Estimated Project Timeline in Foley

Here's a typical timeline for a kitchen remodel project in Foley, AL:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings.
Week 2
Submit permit application
Your contractor submits the application to Foley's building department, apply online here.
Week 3-4
Plan review & approval
Typical processing time in Foley: about 2 weeks. Application review and permit issuance.
Week 5+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on Foley's typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Kitchen permit in Foley, AL?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameCity of Foley Building Department
Address120 S. McKenzie Street, Foley, AL 36535
HoursCall 251-952-4011 to confirm; inspections require 24-hour notice

Frequently Asked Questions

Contact Foley's building department for current Kitchen Remodel permit fee information. Fees typically vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Kitchen Remodel projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Foley can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Kitchen Remodel permits in Foley is about 2 weeks. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Kitchen Remodel Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Kitchen Remodel Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-04-24. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.