Concrete Slab Permit Requirements in Foley, AL

City of Foley Building Department (Building Official Jonathan Cottis) issues all building, electrical, plumbing, and mechanical permits for parcels inside Foley city limits. Baldwin County Building Inspection handles unincorporated areas; Gulf Shores (36542) and Orange Beach (36561) run their own departments. IMPORTANT: ZIP 36535 crosses city boundaries — not every 36535 address is inside Foley. Confirm jurisdiction by parcel before applying; unincorporated 36535 parcels route to Baldwin County (251-972-6845). ZIP 36536 is a PO-Box-only ZIP. Foley's 2024 Building Code Ordinance (filed Sept 2025) aligns with Baldwin County's 2024 IBC/IRC adoption effective 2025-03-05. Coastal hurricane-prone region: wind-borne debris zone requires impact-rated windows/doors or approved shutters on ALL openings; wind speed per ASCE Hazard Tool (ascehazardtool.org) typically ~150-160 mph Vult with Exposure D near coast, Exposure C inland. Coastal A-Zone / V-Zone Design Certificate is required for flood-prone parcels. Foley is #3 nationally for IBHS Fortified Home designations; city adopted the Coastal Supplemental Code in 2015. Strengthen Alabama Homes grant program (Alabama Dept of Insurance) provides up to $10,000 for Fortified retrofits. Online permit portal is Citizenserve (installation 400). New fee schedule effective 2026-03-01. Climate Zone 2A. Septic (on-site sewage) permits through Alabama Department of Public Health, Baldwin County office. Building permit application submitted via Citizenserve portal; inspections scheduled via same portal with 24-hour notice.

By Joey, Founder · Last verified April 24, 2026 · How we research →

Population: 23,432 Code: 2024 IRC Verified: 2026-04-24 1 local rules

When you don’t need a Concrete Slab permit in Foley

Exempt·Rule 1

A small accessory concrete slab (walkway, patio pad, small equipment pad) of 200 square feet or less at grade is exempt from a building permit. Larger slabs that will support a future structure or are part of a building foundation fall under the building permit.

Source2024 IRC R105.2 · view source

Concrete Slab Permit Costs: Foley vs. Nearby

CityEstimated Fee
Foley N/A
Huntsville $75 – $600
Mobile $75 – $600
Birmingham $75 – $600

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Foley permit costs →

Zoning & HOA Considerations

Zoning

Concrete slabs contribute to impervious surface coverage. Austin, Portland, Seattle, and many coastal cities cap impervious cover at 40-65% of lot area. Sidewalks and curb cuts in the public right-of-way always require a separate Public Works encroachment permit.

HOA Communities

If you live in an HOA community: hOAs may restrict new concrete installations, especially front-yard additions visible from the street. Changes to driveway width or walkway placement typically need ARC approval.

Estimated Project Timeline in Foley

Here's a typical timeline for a concrete slab project in Foley, AL:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings.
Week 2
Submit permit application
Your contractor submits the application to Foley's building department, apply online here.
Week 3-4
Plan review & approval
Processing time varies, contact Foley's building department for current turnaround times.
Week 5+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Need a Concrete Slab permit in Foley, AL?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameCity of Foley Building Department
Address120 S. McKenzie Street, Foley, AL 36535
HoursCall 251-952-4011 to confirm; inspections require 24-hour notice

Frequently Asked Questions

Contact Foley's building department for current Concrete Slab permit fee information. Fees typically vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Concrete Slab projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Foley can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Contact Foley's building department for current processing times. Timelines vary based on project complexity and whether plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Concrete Slab Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Concrete Slab Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-04-24. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.