County seat of Houston County. Has full online permit portal. Alabama adopted 2021 IBC/IRC effective April 2025.

By Joey, Founder · Last verified March 28, 2026 · How we research →

Population: 71,650 Code: 2021 Verified: 2026-03-28 5 local rules

When you don’t need a Garage permit in Dothan

Exempt·Rule 1

Small detached garages (120 sq ft or less) may be exempt.

SourceCity of Dothan / Houston County / AL IRC 2021

When you need a Garage permit in Dothan

Required·Rule 1

Detached garages over 120 sq ft require a building permit.

Estimated Fee$225 – $975
Typical Timelineabout 2 weeks
SourceCity of Dothan / Houston County / AL IRC 2021
Required·Rule 2

Attached garages require a building permit.

Estimated Fee$262 – $1,125
Typical Timelineabout 2 weeks
SourceCity of Dothan / Houston County / AL IRC 2021
Required·Rule 3

Carports require a building permit.

Estimated Fee$157 – $675
Typical Timelineabout 2 weeks
SourceCity of Dothan / Houston County / AL IRC 2021
Required·Rule 4

Converting a garage to living space requires permits.

Estimated Fee$198 – $843
Typical Timelineabout 2 weeks
SourceCity of Dothan / Houston County / AL IRC 2021

What Makes Dothan Different

Here's how Dothan's garage rules stack up against the standard IRC baseline that most of the country follows.

More Lenient Than the IRC

Small detached garages (120 sq ft or less) may be exempt in Dothan, AL.

4 rules match the IRC baseline, no surprises there.

Garage Permit Costs: Dothan vs. Nearby

Dothan comes in on the low side for Alabama. You're looking at $157 – $1,125 here, compared to the state average of $202 – $854.

CityEstimated Fee
Dothan $157 – $1,125
Huntsville $210 – $1,500
Mobile $210 – $1,500
Birmingham $210 – $1,500

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Dothan permit costs →

Zoning & HOA Considerations

Zoning

Detached garages and carports may require zoning approval for setback and lot coverage compliance. Garage conversions to living space may trigger zoning occupancy requirements.

HOA Communities

If you live in an HOA community: many HOAs regulate garage door styles, colors, and materials. Garage conversions to living space are prohibited in some communities. Carports may be restricted or banned entirely.

Estimated Project Timeline in Dothan

Here's a typical timeline for a garage project in Dothan, AL:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to Dothan's building department, apply online here.
Week 4-6
Plan review & approval
Typical processing time in Dothan: about 2 weeks. Plan review examiner checks drawings for code compliance.
Week 7+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on Dothan's typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Garage permit in Dothan, AL?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameCity of Dothan Permits & Inspections
Address126 N Saint Andrews St, Dothan, AL 36303
HoursMon-Fri 8am-5pm (permits until 4pm)

Frequently Asked Questions

Estimated permit fees for Garage projects in Dothan, AL range from $157 – $1,125. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Garage projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Dothan can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Garage permits in Dothan is about 2 weeks. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Garage Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Garage Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-03-28. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.