Permit history for 222 Central Park Ave

Virginia Beach, VA · 113 permits on file

113
Permits on file

Permits on file (113)

Ordered most recent first. Data from the city's open data portal.

Elevator
Status: Active
Elevator
Status: Active
Elevator
Status: Active
Elevator
Status: Active
Elevator
Status: Active
Elevator
Status: Active
Elevator
Status: Final
Elevator
Status: Final
Utility
Approx: 200 street trees within virginia beach town center. tree maintenance requested by the city to include trimming.
Status: Active
Fire
New tenant build-out / trader interactive / use group - b / construction type - 1b / occupant load 80 / fully sprinklered <<< fire alarm contr to *** attention *** notation to drawing, visual notification to be provided in wellness
Status: Final
Plumbing
Status: Final
Fire
( 21st floor ) new tenant build-out / trader interactive / use group - b / construction type - 1b / occupant load 80 / fully sprinklered <<< fire sprinkler contr to relocate existing f/s heads and add as necessary for code complian
Status: Final
Fire
New tenant build-out for office suite ""gannett fleming"" 19th floor suite 1910b - use group / ib - construction type / fully sprinklered / occupant load - 20 <<< fire alarm contr to relocate existing occupant n
Status: Final
Electrical
Office build out on the 21st floor.
Status: Final
Fire
New tenant build-out for office suite ""gannett fleming"" 19th floor suite 1910b - use group / ib - construction type / fully sprinklered / occupant load - 20 <<< fire sprinkler contr to relocate existing f/s he
Status: Final
Mechanical
Relocate (17) existing vav boxes. provide & install duct work for the (17) existing vav boxes.
Status: Final
Building Addition and or Alteration
New tenant build-out / trader interactive / use group - b / construction type - 1b / occupant load 80 / fully sprinklered
Status: Final
Plumbing
Status: Final
Fire
( suite 1910 ) new tenant build-out for office suite ""gannett fleming"" 19th floor suite 1910b - use group / ib - construction type / sprinklered / occupant load - 20 <<< access control contr to install 1 - ma
Status: Final
Fire
Interior alterations - mmc /mma - use group b / construction type 1b / sprinklered <<< fire alarm contr to relocate existing occupant notification and add as required for code compliance in areas of alterations, huddle rm., work ca
Status: Closed
Mechanical
Relocate (1) existing vav box, reuse (3) existing vav boxes, and provide & install (1) new vav box. provide and install corresponding duct work for the (5) vav boxes.
Status: Final
Fire
( 16th floor ) the law firm of williams mullens <<< access control contr to install one maglock onto the back corridor employee entrance dr., all work to be performed in compliance with 2021 va. const. code
Status: Closed
Electrical
Office buildout
Status: Final
Building Addition and or Alteration
New tenant build-out for office suite ""gannett fleming"" 19th floor suite 1910b - use group / ib - construction type / fully sprinklered / occupant load - 20
Status: Final
Fire
Williams mullen law firm ( suite # 1600 ) <<< access control contr to relocate and reuse existing maglock, rex, push to exit button due to relocation of main entry door, all work to be performed in compliance with 2021 va. const. c
Status: Final
Fire
Stv engineering, new tenant build-out of 10th floor suite 1050, b-use 1a construction type fully sprinklered 29 occupants <<< access control contr to install 2 - double maglocks onto the front door, and 1 electric strike onto the c
Status: Closed
Plumbing
222 central avenue suite 1340
Status: Closed
Fire
Stv engineering, new tenant build-out of 10th floor suite 1050, b-use 1a construction type fully sprinklered 29 occupants <<< fire alarm contr to provide code compliant occupant notification as required throghout areas of alteratio
Status: Closed
Fire
Stv engineering, new tenant build-out of 10th floor suite 1050b-use 1a construction type fully sprinklered 29 occupants <<< fire sprinkler contr to relocate existing f/s heads and add for code compliance as required throughout area
Status: Closed
Fire
Interior alterations - mmc /mma - use group b / construction type 1b / sprinklered <<< fire sprinkler contr to relocate existing f/s heads and add f/s heads for code compliance throughout areas of alterations, existing rpz, all wor
Status: Closed
Electrical
Office renovation
Status: Closed
Building Addition and or Alteration
Interior alterations - mmc /mma - use group b / construction type 1b / sprinklered
Status: Closed
Mechanical
Status: Closed
Fire
Interior alteration - new tenant buildout - williams mullen 16th floor - use group - b - construction type - 1b - occupant load - 55 - fulley sprinklered <<< fire sprinkler contr to relocate existing f/s heads and add f/s coverage
Status: Closed
Plumbing
Status: Closed
Mechanical
16th flr - modify three (3) existing duct systems. relocate three (3) temperature sensors.
Status: Active
Electrical
Complete renovation of suite for stv. new lighting and devices.
Status: Closed
Fire
Divaris ( suite #220, gym ) <<< access control contr to install electric strikes ( fail /safe ) onto the main entry door, secondary entry hallway door, womens locker rm. dr., all work to be performed in compliance with 2021 va con
Status: Closed
Electrical
Status: Closed
Building Addition and or Alteration
Stv engineering, new tenant build-out of 10th floor suite 1050b-use 1a construction type fully sprinklered 29 occupants
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Building Addition and or Alteration
New tenant buildout - williams mullen 16th floor - use group b - construction type 1b - occupant load 55 - fully sprinklered
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Fire
Armada hoffler suite, existing interior alteration. construct 2 new demising walls and perform selective demolition. b-use, 1b construction type, fully sprinklered 86 occupants, <<< fire sprinkler contr to relocate existing f/s h
Status: Closed
Building Addition and or Alteration
Armada hoffler suite, existing interior alteration. construct 2 new demising walls and perform selective demolition. b-use, 1b construction type, fully sprinklered 86 occupants
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Mechanical
Ste 2100 - relocate (9) existing vav boxes. provide & install the corresponding ductwork and controls.
Status: Closed
Building Addition and or Alteration
New tenant build out - armada hoffler - use group b / construction type 1b / sprinklered ***occupant load 80
Status: Closed
Mechanical
Ste 1910 - relocate one (1) vav box and install new ductwork to this vav box. demo (1) vav box and return to owner.
Status: Closed
Building Addition and or Alteration
Interior renovation to create empty shell space - no co without tenant build-out permit -- demise existing tenant upfit space. perform selective demolition. construct new demising wall interior partition to deck. create new suite entrance
Status: Closed
Building Addition and or Alteration
Interior demolition to form shell space - use group b / construction type 1b **no co to be issued -- seperate tenant build-out permit required for a co****the permit shall be finaled upon the completion of the demolition work**
Status: Closed
Fire
Pender & coward, nterior alteration -- perform select minor interior alterations per attached floorplan <<< fire sprinkler contr to add and relocate existing f/s heads to accomodate new wall and ceiling layout, existing rpz,
Status: Closed
Plumbing
Status: Closed
Mechanical
Provide & install (1) ductless split system heat pump, (1) exhaust fan with ductwork, and transfer duct(s).
Status: Closed
Fire
Deloitte , renovations to existing office / no change of use or occupancy / b use / 1b construction <<< fire alarm contr to add one visual occupant notification appliance in the new meeting room, all work to be performed in complia
Status: Closed
Electrical
Office alterations
Status: Closed
Building Addition and or Alteration
Pender & coward, nterior alteration -- perform select minor interior alterations per attached floorplan
Status: Closed
Fire
Deloitte , renovations to existing office / no change of use or occupancy / b use / 1b construction <<< access control contr to install 3 - electric strikes, 1 - main entry ( fail / safe ), 1 - comit room ( fail/ secure ) 1 - stora
Status: Closed
Fire
Deloitte ( suite 1801 ) novations to existing office / no change of use or occupancy / b use / 1b construction <<< fire sprinkler contr to relocate one f/s head and turn one f/s uprite ( all walls surrounding uprite f/s head must c
Status: Closed
Electrical
Electrical alterations to an existing suite.
Status: Closed
Building Addition and or Alteration
Deloitte , renovations to existing office / no change of use or occupancy / b use / 1b construction
Status: Closed
Utility
Crane will be used to place a roof top unit on the building during night time to eliminate heavy traffic because of the road closure.
Status: Closed
Fire
Divaris mail room ( 1st flr ) access control contr to install one electric strike onto the entry dr. of the mail rm. ( fail / safe ) all work to be performed in compliance with 2018 va const code
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Utility
Wo grubb will use two 110 ton crane to lift signs onto building. we will need to set up the crane on central park ave. we would like to work daytime hours,
Status: Closed
Mechanical
Replace two cooling towers.
Status: Active
Elevator
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Utility
Setting up a 110 ton crane with 26ft 3in outriggers and a 150ft of boom to set signs onto building. set up crane on va beach blvd. would like to work during the night.
Status: Closed
Elevator
Status: Closed
Utility
Setting up 110 ton crane with 26ft 3in outrigger spacing and 150ft of boom
Status: Closed
Fire
New tenant build-out -- kpmg suite 1510 -- use group b / construction type 1b / sprinklered ( occupant contact info ) project worksite contact:shawn abrahm,512-581-4827, shawn.abraham@imegcorp.com, kpmg , john velozo, 3 chestnut rd., mo
Status: Closed
Elevator
Replacement of hoist ropes with like and kind
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Plumbing
Suite #1510
Status: Closed
Fire
New tenant build-out -- kpmg suite 1510 -- use group b / construction type 1b / sprinklered <<< fire sprinkler contr to add and relocate existing f/s heads throughout tenant buildout, existing rpz, all work to be performed in c
Status: Closed
Fire
New tenant build-out -- kpmg suite 1510 -- use group b / construction type 1b / sprinklered <<< fire alarm contr to provide code compliant occupant notification throughout buildout see stamped approved drawings, new nac with sm
Status: Closed
Electrical
New tenant build-out -- kpmg suite 1510 -- use group b / construction type 1b / sprinklered
Status: Closed
Mechanical
Kpmg-rework 14 existing vav boxes add 4 new vav boxes and air dist. add 1 new heat pump.
Status: Closed
Building Addition and or Alteration
New tenant build-out -- kpmg suite 1510 -- use group b / construction type 1b / sprinklered***tco issued pending final on electric and fire permits 12/20/2023 kobrien******tco extended pending final on electric and fire permits 1/23/202
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Fire
Divaris <<< access control contr to install 1 - electric strike on the first flr garage door location as shown on drawings ( fail / safe ), 16th flr 1 - e/s on door adj to stairwell ( fail / safe ) 1 - maglock opposite side of str
Status: Closed
Fire
New tenant build-out -- armada hoffler accounting offices -- use group b / construction type 1b / sprinklered <<< fire alarm contr to provide code compliant occupant notification thoughtout tenant buildout, *** notation *** vis
Status: Closed
Fire
New tenant build-out -- armada hoffler accounting offices -- use group b / construction type 1b / sprinklered <<< fire sprinkler contr to add and relocate existing f/s heads to accomodate new wall and ceiling layout, existing r
Status: Closed
Plumbing
Status: Closed
Mechanical
Relocate one (1) indoor ahu for an existing ductless split system. install one (1) owner provided vav box complete with controls and duct work.
Status: Closed
Electrical
New tenant build-out -- armada hoffler accounting offices -- use group b / construction type 1b / sprinklered
Status: Closed
Building Addition and or Alteration
New tenant build-out -- armada hoffler accounting offices -- use group b / construction type 1b / sprinklered
Status: Closed
Fire
Iday and zimmerman, interior renovations -- select interior modifications to provide security upgrades to existing tenant buildout. no new sf or c of o required. <<< access control contr to reinstall 2 - maglocks onto the main el
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Electrical
Interior renovations -- select interior modifications to provide security upgrades to existing tenant buildout. no new sf or c of o required.
Status: Closed
Elevator
Permit to replace and test brake shoes.
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed

Check permits at another Virginia Beach address

Free instant lookup, no signup.

Search Virginia Beach permits →
Disclaimer: Permit data comes from Virginia Beach's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the Virginia Beach building department before buying, selling, or planning work.