Permit history for 2025 Glenn Mitchell Dr

Virginia Beach, VA · 72 permits on file

72
Permits on file

Permits on file (72)

Ordered most recent first. Data from the city's open data portal.

Fire
Spah ( 2nd flr ) <<< access control contr to install one electric strike ( fail / safe ) onto the esd closet, all work to be performed in compliance with 2021 va const code
Status: Active
Mechanical
Spah ct2 replacement
Status: Final
Fire
Spah , ( cath lab ii) interior alteration of existing suite to replace ct equipment - first floori-2 - use group / iib - construction type / fully sprinklered / occupant load - existing <<< fire sprinkler contr to relocate existing
Status: Final
Fire
Spah ( 1st flr ) <<< access control contr to install 2 - electric strikes ( fail / safe ), 1 - storage rm. by the exterior mobile prep entrance dr., 1 - waiting / iv prep room rm # 1b143, all work to be performed in compliance with
Status: Active
Electrical
New circuits for cath lab
Status: Final
Building Addition and or Alteration
Interior alteration of existing suite to replace ct equipment - first floori-2 - use group / iib - construction type / fully sprinklered / occupant load - existing
Status: Final
Fire
Spah <<< kitchen fire suppression contr to bring into compliance existing type i hood and new cookline, ansul 3 gallon r-102 compliant system, 11 flow points available, 11 flow points to be used, no flow points remaining, ( fire al
Status: Final
Mechanical
Install air curtain
Status: Final
Elevator
Status: Final
Elevator
Status: Final
Elevator
Status: Active
Elevator
Status: Final
Elevator
Status: Final
Elevator
Status: Final
Elevator
Status: Final
Elevator
Status: Final
Mechanical
Install 2 3.5 ton and 3 2.5 ton mini splits in the elevator rooms.
Status: Final
Fire
Sentara princess anne medical office building, 4th flr, capital digestive care, <<< access control contr to install one electric strike ( fail / safe ) onto the telemetry / breakroom door, all work to be performed in compliance wit
Status: Final
Electrical
5 new ac units for elevator equipment rooms; 1 - new 150 amp sub-fed panel, 2 - 30 amp circuits & 3 - 35 amp circuits.
Status: Final
Electrical
Wire new air curtain; 1 - 15 amp circuit & 1 - 25 amp circuit.
Status: Closed
Mechanical
Spah mri renovation
Status: Closed
Fire
Spah, 1st flr. interior renovations of existing mri suite. replacing mri equipment and finishes.i-2 use / ii-b construction / fully sprinklered / occupant load - existing <<< fire sprinkler contr to relocate existing f/s heads and
Status: Closed
Plumbing
Spah mri renovation
Status: Closed
Electrical
Mri replacement
Status: Closed
Building Addition and or Alteration
Interior renovations of existing mri suite. replacing mri equipment and finishes.i-2 use / ii-b construction / fully sprinklered / occupant load - existing
Status: Closed
Building Addition and or Alteration
Tent - 40x60 *8 installed 3/21 -- take down 3/24
Status: Closed
Elevator
Replace ropes (belts) with like for like materials
Status: Closed
Fire
Spah ( 5th flr ) <<< access control contr to install one electric strike ( fail / safe ) onto the shared workroom space labeled as rm. 5a202 adj to the public elevator lobby, all work to be performed in compliance with 2021 va con
Status: Closed
Elevator
Replacement of hoist belts with like and kind on elevator p2
Status: Closed
Fire
New build-out -- sentara healthcare - third floor smoke compartments 1 and 5 -- use group i-2 / construction type 1a / sprinklered, ***liquiid oxygen tank to be permitted separately, ***permit allows for the pouring of the concrete pad f
Status: Closed
Electrical
Wiring a new air curtain @ door between main hospital & parking garage. 1- 15 amp circuit & 1 - 25 amp circuit.
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Fire
Spah <<< ( 1st flr ) access control contr to install 2 - electric strikes ( fail / safe ) supply storage rm 1b226, soiled utility rm 1f188, all work to be performed in compliance with 2018 va const code
Status: Closed
Fire
Spah <<< fire alarm contr to provide door hold open device onto the 1st flr family consult room which is located near the security desk, door will release upon general fire alarm, all work to be performed in compliance with 2016 nf
Status: Closed
Plumbing
Spa bio med
Status: Closed
Fire
Spah <<< ( this access control permit not associated with ongoing alterations ) access control contr to install 2 - maglocks and multiple electric strikes throughout the 1st and 2nd flrs, 1 - m/l 2nd flr quality suite/support servi
Status: Closed
Mechanical
Spa bio med - (1) 6"" ductwork and (3) new supply diffusers
Status: Closed
Fire
Interior renovations - sentara healthcare - use group i1 - construction type 1a <<< fire sprinkler contr to add and relocate existing f/s heads to accomodate new wall and ceiling layout, all work to be performed in compliance with
Status: Closed
Fire
New build-out -- sentara healthcare - third floor smoke compartments 1 and 5 -- use group i-2 / construction type 1a / sprinklered <<< access control contr to install electric strikes throughout buildout as shown on stamped appr
Status: Closed
Fire
New build-out -- sentara healthcare - third floor smoke compartments 1 and 5 -- use group i-2 / construction type 1a / sprinklered <<< fire alarm contr to remove existing shell protection and extend code compliant occupant notif
Status: Closed
Fire
Interior renovations - sentara healthcare - use group i1 - construction type 1a <<< ( location 1st flr biomed ) fire alarm contr to provide smoke dectors on either side of two new doors along with door release hold open devices on
Status: Closed
Electrical
Renovations to bio-med
Status: Closed
Building Addition and or Alteration
Interior renovations - sentara healthcare - use group i1 - construction type 1a
Status: Closed
Fire
New build-out -- sentara healthcare - third floor smoke compartments 1 and 5 -- use group i-2 / construction type 1a / sprinklered <<< fire sprinkler contr to add and relocate existing f/s heads throughout 3rd flr bldg alteratio
Status: Closed
Electrical
Interior build-out of the 3rd floor existing shell space.
Status: Closed
Fire
Spah <<< access control contr to install 1 - maglock onto the 1st flr ed room oxygen / soiled utility rm dr,1 - electric strike onto the physicians workspace rm, dr., all work to be performed in compliance with 2018 va const code
Status: Closed
Mechanical
(15) ceiling radiant heat pane;s, (56) vav with hot water reheat, supply, return, and exhaust ductwork, heating hot water suply and return branchlines
Status: Closed
Plumbing
New build-out -- sentara healthcare - third floor smoke compartments 1 and 5 -- use group i-2 / construction type 1a / sprinklered
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Elevator
Status: Closed
Building Addition and or Alteration
New build-out -- sentara healthcare - third floor smoke compartments 1 and 5 -- use group i-2 / construction type 1a / sprinklered***liquiid oxygen tank to be permitted separately***permit allows for the pouring of the concrete pad for t
Status: Closed
Electrical
Adding 3 new 20a circuits in or3 and or4
Status: Closed
Electrical
Add 6 wall packs; 2 - 20 amp circuits
Status: Closed
Fire
Spah offices 2nd floor, interior renovations -- modifications to 2,875 sf to create a new vendor prep area and (3) new offices. <<< fire alarm contr to reconnect devices removed for demolition in areas as shown on drawings, contr
Status: Closed
Fire
Spah , interior renovation -- interior renovation to existing 2,675 s.f. space to create new procedure/storage room. <<< ( partial finals if needed parts not available convo with rob brown 5/22/23 email in documents ) fire alarm
Status: Closed
Electrical
Modifications to vendor prep area
Status: Closed
Plumbing
Procedure room 11
Status: Closed
Mechanical
Spa vendor storagerelocate (6) grilles
Status: Closed
Fire
Spah, ( 3rd flr ) <<< access control contr to install 1 - electric strike ( fail / safe ) onto the nursing administrators entry dr., rm. # 3a132, all work to be performed in compliance with 2021 va. const. code
Status: Active