Permit history for 4100 George J Bean Pkwy
Tampa, FL · 5 permits on file · 2025
5
Permits on file
2025
First permit
2025
Most recent
Permits on file (5)
Ordered most recent first. Data from the city's open data portal.
Commercial Building Alterations (Renovations) B-9 Business-Professional Office
Airside f tsa upgrades. relocating and installing camera poles and floor boxes.
Status: Issued
Nov 17, 2025
Commercial Building Alterations (Renovations) A-3 Assembly-Worship. Amusement. Arcade. Church. Community Hall
This permit scope includes the renovation of the existing baggage system at the main terminal of the tampa international airport.
Status: Revision
Nov 6, 2025
Commercial Building Alterations (Renovations) S-1A Storage-Moderate Hazard
Remove existing concrete pads and install new 4" reinforced concrete housekeeping pads per structural drawings in the eds/baggage area at tampa international airport.
Status: Issued
Oct 13, 2025
Commercial Building Alterations (Renovations) A-3 Assembly-Worship. Amusement. Arcade. Church. Community Hall
Airside e roof replacement.
Status: Issued
Jul 22, 2025
Commercial Building Alterations (Renovations) S-2C Storage-Low Hazard. Parking Garages Open or Enclosed
Project consists of rehabilitation of the airside e shuttle guideway at tampa international airport. the project will include full depth removal and replacement of the existing concrete running surfaces and bearing pad replacement on the re
Status: Issued
May 5, 2025
Disclaimer: Permit data comes from Tampa's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the Tampa building department before buying, selling, or planning work.