Commercial Remodel
Epc - create additional storage room on second floor of fertigation building & field changes.
Status: Finaled
Jan 22, 2025
Commercial Other Struct (non-bldg)
Epc - replacement permit of com-1802665 to cover all site improvement items, including completed items under com-1802665 and added scope of site work that were done without prior permits - plng-insp
Status: Issued
Nov 4, 2024
Commercial Remodel
Epc - expedited - additional scope of work for equipment yard and equipment additions to existing building 1 existing building remodel permit is under com-1916571 - related inspections could have been done under original permit
Status: Finaled
Jul 23, 2024
Commercial Remodel
Epc - exterior remodel by replacing concrete footing and residing of building exterior walls. no occupancy. separated ti permit is required.
Status: Issued
Jul 15, 2024
Commercial Other Struct (non-bldg)
Epc - replacement permit of com-2004530 for co2 system. plan review required under the current codes - plng-insp
Status: Issued
Jun 25, 2024
Commercial Other Struct (non-bldg)
Epc - new racking at existing building 1
Status: Finaled
May 29, 2024
Commercial Remodel
Replacement permit of com-2006173 & com-2108148 to complete final inspections for the fertigation equipment building site work under com-1802665 & fertigation system under com-1920047 - plng-insp
Status: Issued
Jan 30, 2024
Commercial Remodel
Replacement permit of com-2105444 to complete final inspection for the greenhouse blgd 1 vestibules - plng-insp
Status: Finaled
Jan 30, 2024
Commercial Remodel
Replacement permit of com-2105443 to complete final inspection for greenhouse bldg 2 vestibules - plng-insp
Status: Finaled
Jan 30, 2024
Commercial Remodel
Replacement permit of com-2104670 to complete final inspection for greenhouse bldg 3 vestibules. - plng-insp
Status: Finaled
Jan 30, 2024
Commercial Remodel
Epc - additional scope to com-2307128 for additional heaters @ existing bldg 1
Status: Finaled
Jan 18, 2024
Commercial Other Struct (non-bldg)
Epc - replacement permit of com-2105444 for inspections. 75% of the original valuation was assessed. no additional plan review is required
Status: Withdrawn
Dec 20, 2023
Commercial Fire Equipment
Epc - emergency responder radio communication system installation for natura site
Status: Finaled
Dec 19, 2023
Commercial Remodel
Epc - added scope of work for additional grow lights and electrical switch gear in the new green building 3 shell permit under com-1903693 and electrical revision under com-2007887. - plng-insp
Status: Expired Permit
May 18, 2023
Commercial Fire Equipment
Epc - replacement permit of com-2104919 for installation of a closed loop water heating system for volatile extraction kettles. valuation is 15% of the original permit
Status: Finaled
May 11, 2023
Commercial Fire Equipment
Epc - additional fire sprinkler required by inspector for com-1903693 tco
Status: Finaled
May 2, 2023
Commercial Other Struct (non-bldg)
Epc - construction of an electrical vehicle gate. type vb, b occupancy. site development permit is under com-1802665. security building is under com-2001211 - plng-insp
Status: Finaled
Apr 11, 2023
Commercial New Building
Epc - replacement permit for com-2001211 to complete final inspections. valuation is 15% of the original permit - plng-insp
Status: Finaled
Apr 11, 2023
Commercial Other Struct (non-bldg)
Epc - replacement permit of the expired permit com-1920047 for final inspections. 15% of the original valuation of $250,000 was used for this replacement permit. no additional plan review. scope of work is for the overall site fertiga
Status: Finaled
May 4, 2022
Commercial Other Struct (non-bldg)
Epc - replacement permit of the expired permit com-1922991 for final inspections. 15% of the original valuation of $400,000 was used for this replacement permit. no additional plan review. scope of work is additional site improvement
Status: Expired Permit
May 4, 2022
Commercial Other Struct (non-bldg)
Epc - replacement permit of the expired permit com-1917237 for final inspections. 15% of the original valuation of $75,000 was used for this replacement permit. no additional plan review. scope of work is for additional fire line for
Status: Finaled
May 4, 2022
Commercial Other Struct (non-bldg)
Epc - replacement permit of the expired permit com-1920771 for final inspections. 15% of the original valuation of $200,000 was used for this replacement permit. no additional plan review. scope of work is for additional water and sew
Status: Finaled
May 4, 2022
Commercial Other Struct (non-bldg)
Epc - replacement permit of expired permit com-1917762 for final inspection. 15% of the original valuation of $100,000 was used for this replacement permit. no additional plan review. scope of work is to construct retaining walls for t
Status: Finaled
May 4, 2022
Commercial Other Struct (non-bldg)
Epc - replacement permit of the expired permit com-1802665 for final inspections. 15% of the original valuation of 1,200,000 was used for this replacement permit. no additional plan review. the scope of work is for onsite improvement f
Status: Expired Permit
May 4, 2022
Commercial Remodel
Epc - 1620 sq ft of installation of storage racks and shelving
Status: Expired Permit
Sep 14, 2021
Commercial Remodel
Epc - remodel the existing cannabis greenhouse #2 with 600 sf security entry vestibules - plng-insp replaced by com-2401947
Status: Expired Permit
Sep 13, 2021
Commercial Addition
Expedited - epc - addition to an existing fertigation equipment building for extra storage and automation control room at the existing mezzanine area. existing fertigation equipment building was under com-2006173 - plng-insp
Status: Expired Permit
Aug 30, 2021
Commercial Addition
Epc - add additional 240 sf security entry vestibules to the new greenhouse blgd 1 - plng-insp replaced by com-2401948
Status: Expired Permit
Aug 30, 2021
Commercial Addition
Epc - add additional 240 sf security entry vestibules to the new greenhouse bldg 3 replaced by com-2401946
Status: Expired Permit
Aug 5, 2021
Commercial Fire Equipment
Epc - installation of a closed loop water heating system for volatile extraction kettles replaced by com-2307128
Status: Expired Permit
May 11, 2021
Commercial Fire Equipment
Epc - installation of equipment for the cannabis facility at the existing bldg #1
Status: Finaled
Sep 9, 2020
Commercial Addition
Expedited - epc - remodel and addition to building 2. type iiib; occ. f-1,b. 1st floor remodel area is 15,200 sf. 2nd floor addition is 11,232 sf. addition to include new interior walls, doors, ceilings, light fixrtures, hvac units, ducting
Status: Withdrawn
Sep 1, 2020
Commercial New Building
Epc - construction of a 5,615 sf fertigation equipment building at the 8280 elder creek cannabis facility. site work under com-1802665 & fertigation system under com-1920047 - plng-insp
Status: Expired Permit
Jul 9, 2020
Commercial Other Struct (non-bldg)
Epc - installation of co2 system for the cannabis facility replaced by com-2400544
Status: Expired Permit
May 14, 2020
Commercial New Building
Expedited - epc - construction of a 324 sf building for security occupy purpose. type vb, b occupancy. replacement permit under com-2305459 site development under com-1802665 - plng-insp replaced by com-2305459
Status: Expired Permit
Mar 24, 2020
Commercial Other Struct (non-bldg)
Expedited - epc - additional site improvement by revising electrical plans to reflect the leed qualification requirement, adding sewer grease interceptor, and complete the gas distribution system for the proposed cannabis facility phase
Status: Expired Permit
Feb 21, 2020
Commercial Remodel
Expedited - epc - complete remodel of an existing 54,895 sf warehouse building (#1) for cannabis uses. - plng-insp this application replaces the old applications of com-1818335 & com-1901897. partial demolition for the building was
Status: Certificate of Occupancy
Dec 26, 2019
Commercial Other Struct (non-bldg)
Cannabis: epc - overall site fertigation system for the green house buildings phase i original site improvement permit is com-1802665 replaced by com-2208873
Status: Expired Permit
Dec 9, 2019
Commercial Other Struct (non-bldg)
Expedited - epc - onsite improvement for additional water and sewer due to the revised plumbing design. phase i original site improvement permit is com-1802665 replaced by com-2208512
Status: Expired Permit
Nov 25, 2019
Commercial Phased
Epc - phased permit to com-1916571 for structural improvement at the east and northeast corner and exterior remodel that will prepare the 2nd phase for occupancy. - plng-insp
Status: Void
Oct 29, 2019
Commercial New Building
Epc - construction of a cannabis cultivation greenhouse building at a cannabis warehouse complex. size: 80,769 sf. type ib, u occupancy site development under com-1802665 - plng-insp
Status: Certificate of Occupancy
Oct 4, 2019
Commercial Other Struct (non-bldg)
Expedited - epc - construction of retaining walls for the bio-retention planters phase i original site improvement permit is com-1802665 replaced by com-2208511
Status: Expired Permit
Oct 4, 2019
Commercial New Building
Epc - construction of a cannabis cultivation greenhouse building at a cannabis warehouse complex. size: 45,247 sf. type ib, u occupancy site development under com-1802665 - plng-insp
Status: Certificate of Occupancy
Sep 30, 2019
Commercial New Building
Epc - construction of a cannabis cultivation greenhouse building at a cannabis warehouse complex. size: 53,036 sf. type ib, u occupancy site development under com-1802665 - plng-insp
Status: Certificate of Occupancy
Sep 27, 2019
Commercial Other Struct (non-bldg)
Expedited - epc - additional fire line for the pump house (pump house structure and fire pump equipment will be on a separated permit) original permit for the site work is under com-1802665 replaced by com-2208865
Status: Expired Permit
Sep 16, 2019
Commercial Other Struct (non-bldg)
Epc - onsite improvement for a partially developed site that is consist of two existing warehouse buildings and 3 new buildings. the proposed improvement includes grading, drainage, site utilities and erosion control, site electrical upgra
Status: Expired Permit
Jun 27, 2019
Commercial Remodel
Epc - remodel of an existing 54,895 warehouse building (#1) for with new dsp panels and partial foundation (structural) reinforcements. this remodel is not for occupancy. this remodel do not include any interior walls, windows or doors, or
Status: Void
Jan 31, 2019
Commercial Remodel
Epc - remodel of an existing 17,059 sf warehouse building (#2) (15,200 sf building envelop with 1,859 sf mezzanine) with new dsp panels and partial foundation (structural) reinforcements. this remodel is not for occupancy. this remodel do n
Status: Void
Jan 30, 2019
Commercial Demolition Interior
Epc - partial demolition of the existing 17,059 sf warehouse building #2 for future tenant. - plng-insp
Status: Void
Nov 29, 2018
Commercial Demolition Interior
Epc - partial demolition of the existing 54,895 sf warehouse building #1 for future tenant. - plng-insp
Status: Void
Nov 29, 2018
Commercial New Temp Power
Expedited - temporary power to restore "security systems only" not for occupancy
Status: Expired Permit
Sep 6, 2018
Commercial Fire Equipment
Install cell communication on existing sprinkler suppression system.
Contractor: SIGNAL SERVICE INC
Status: Issued
Jul 12, 2017