Permit history for 6600 Bruceville Rd
Sacramento, CA · 126 permits on file · 2016–2026
126
Permits on file
2016
First permit
2026
Most recent
Permits on file (126)
Ordered most recent first. Data from the city's open data portal.
Commercial Remodel
Epc - area of work- 1000sf. construction type- va. occupancy- b. remodel for alternative treatment center at kaiser.
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Issued
Jan 15, 2026
Commercial Remodel
Epc - door and lock system replacement on the first floor for mob asc of 6 doors with electrical. minor patching and painting of walls and ceiling as required. project area is approximately 90sf electrical work includes low voltage(data) an
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Issued
Jul 18, 2025
Commercial Remodel
Epc - door and lock system replacement on the first floor for mob dan b. moore of 19 doors with electrical and security updates. minor patching and painting of walls and ceilings as required. project area is approximately 285. electrical wo
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Issued
Jul 18, 2025
Commercial Repair-Maintenance
Epc - door and lock system replacement on the first and second floors for mob oss of 42 doors with electrical. minor patching and painting of walls and ceilings as required. project area 555 sf. electrical work includes low voltage (data)
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Issued
Apr 16, 2025
Commercial Remodel
Epc - installing a new name board monitor, receptacle and data outlet. "for pharmacy name calling in pharmacy 1."
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Mar 18, 2025
Commercial Remodel
Epc - area of work- 375 sf. construction type- 1a. occupancy- b. door and door hardware replacement, remove triology door locks and replace with card readers. add auto release buttons at each of the reception desks for door. this will be fo
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Dec 23, 2024
Commercial Remodel
Epc - scope of work includes door hardware and door replacement on the first, second and third floors at 6600 bruceville road for mob 2. the mob is three (3) levels. the facility is switching from their trilogy lock and security system to a
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Dec 3, 2024
Commercial Remodel
Epc - scope of work includes door hardware and door replacement on the first and second floors at 6600 bruceville road for mob 1. the mob is three (3) levels, there is no scope of work on the third (3rd) floor. the facility is switching fro
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Dec 3, 2024
Commercial Remodel
Epc - providing screening at 2nd 3rd, 4th and 5th level of existing parking garage in kaiser south sacramento medical center. - plng-insp
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Expired Permit
Jul 16, 2024
Commercial Repair-Maintenance
Epc - replacement of two split system dx fan coil units and condensing units with two new split system units.
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Jul 16, 2024
Sign 1-5
Permit to complete work commenced on expired permits sig-2314471, sig-2105652 & sig-2202579 -install four (4) illuminated monument/directional signs, install one (1) non-illuminated monument sign.
Contractor:
ILLUMINATED CREATIONS INC
Status: Finaled
Mar 6, 2024
Commercial Remodel
Epc - 1-for-1 interior led lighting retrofit in mob 3 atrium great hall. light fixture change only.
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Jan 17, 2024
Commercial Remodel
Epc - this project involves the installation of two (2) new parking guidance
signs at each entrance and four (4) wireless repeaters for a new
parking guidance system at the new parking structure. each requires
120-volt power and will be
Contractor:
WHITTINGTON ELECTRIC INC
Status: Finaled
Dec 21, 2023
Commercial Remodel
Epc - size- 43,710 sf. occupancy- b. construction type- va. replacement of obsolete, unreliable pneumatic hvac controls with direct digital controls (ddc).
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Nov 7, 2023
Commercial Remodel
Epc - install new sink with associated piping.
Contractor:
AIRCO MECHANICAL INC
Status: Finaled
Sep 19, 2023
Sign 1-5
Permit to complete work commenced on expired permits sig-2105652 & sig-2202579 -install four (4) illuminated monument/directional signs, install one (1) non-illuminated monument sign.
Contractor:
ILLUMINATED CREATIONS INC
Status: Expired Permit
Aug 9, 2023
Commercial Remodel
Epc - replacement of existing surface parking with accessible parking lot improvements. the disturbed area is approximately 2,802 square feet.
Contractor:
XL CONSTRUCTION CORPORATION
Status: Finaled
Jul 28, 2023
Commercial Remodel
Epc - the scope is interior alterations. project is located on level one of the outpatient surgery services bldg. scope is to upgrade ptube system and replacement of one existing diverter and two ptube stations. we will alter the existing 6
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Jul 20, 2023
Commercial Other Struct (non-bldg)
Epc - replacement permit of com-1902717 for building and electrical inspections. install 133,889 sf, 2168.29 kw dc grid-tied solar photovoltaic system on an existing parking lot for kaiser permanente s. sacramento medical center. (dr17-253)
Contractor:
AMERESCO INC
Status: Finaled
Jul 19, 2023
Commercial Remodel
Epc - size- 43,289 sf. construction type- iia. occupancy- a3 & b. the following are components needed for the replacement. architectural scope consisting of identification of existing rated walls. structural scope consisting of identificati
Contractor:
TURNER CONSTRUCTION COMPANY
Status: Finaled
Jul 18, 2023
Commercial Remodel
Epc - remodel; area of work is 4,100 sf; type iib; occ. b. project consists of remodeling existing six waiting rooms and reception areas on the 1st and 2nd levels at mob 3. project also updates ergonomics, finishes, lighting, electrical, an
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
May 11, 2023
Commercial Fire Equipment
Epc - provide a fire alarm system replacement. the approximate total sq. ft. is 43,289 + mezz.
Contractor:
SIEMENS INDUSTRY INC
Status: Finaled
Feb 27, 2023
Commercial Remodel
Epc - size- 1205 sf. construction type- 1a. occupancy- i2, b. location of this project is at kaiser s. sacramento outpatient surgery center- sterile and decontamination rooms. replacement of the existing sterilizers, washer/disinfectors, pa
Contractor:
ROEBBELEN CONTRACTING INC
Status: Finaled
Jan 24, 2023
Commercial Remodel
Epc - kaiser south mob #1 remodel to include: equipment replacement project consisting of replacing existing siemens ysio unit with new philips (dr) digital diagnostic high performance unit in the ortho-radiology room (m1045) at medical off
Contractor:
ROEBBELEN CONTRACTING INC
Status: Expired Permit
Dec 8, 2022
Commercial Remodel
Epc - db moore - replacement of existing 60gal domestic water heater to new heat exchanger water heater
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Oct 14, 2022
Commercial Remodel
Epc - 1-for-1 interior led lighting retrofit in medical office building 3
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Oct 14, 2022
Commercial Remodel
Epc - 1-for-1 interior led lighting retrofit in atrium great hall.
(there shall be no building construction, re-circuiting, or re-wiring of any fixtures.)
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Oct 5, 2022
Commercial Remodel
Epc - mob ii - replacement of two (2) 204 gallon gas water heaters.
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Sep 13, 2022
Commercial Remodel
Expedited - eotc - epc - existing site lighting replacement. replace old with new energy efficient led. existing poles to be reused. existing circuits to be reused. site work only
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
May 26, 2022
Sign 1-5
Permit to complete expired, review completed on sig-2105652 - install four (4) illuminated monument/directional signs, install one (1) non-illuminated monument sign
revision com-2202959 - revise the attachment method and engineering calc
Contractor:
ILLUMINATED CREATIONS INC
Status: Expired Permit
Feb 4, 2022
Commercial Remodel
Epc -expidited- renovation of existing office into an exam room. project includes new finishes, electrical, mechanical, and plumbing utilities.
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Feb 4, 2022
Commercial Other Struct (non-bldg)
Epc - removal of existing ramp and construction of new accessible ramp. addition of new accessible parking stalls and alteration to path of travel to building entry. replacement of existing non-compliant wheelchair lift with new accessible
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Expired Permit
Dec 27, 2021
Commercial Remodel
Epc - replacement of drinking fountain with sensor operated fountain and bottle filler. electrical work
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Dec 1, 2021
Commercial Repair-Maintenance
Epc asc bldg - replacement of drinking fountain unit
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Oct 4, 2021
Commercial Repair-Maintenance
Epc - asc bldg - replacement of drinking fountain units
see revision com-2123501: delta 1 - updates to electrical drawings to show correct building where work is being performed; sheets e0.01, e0.02, e0.03, e1.01 updates to show db moore
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Oct 4, 2021
Commercial Repair-Maintenance
Epc - m.o.b. #1 - replacement of drinking fountain units
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Oct 4, 2021
Commercial Repair-Maintenance
Epc - m.o.b. #2) replacement of drinking fountain units
**** - see revision com-2201020::delta # 2 revisions- access barrier removal - drinking fountain replacement project - mob 2 bldg. originally specified motion sensor retrofit kit tha
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Oct 4, 2021
Commercial Repair-Maintenance
Epc - m.o.b. #3 - replacement of drinking fountain units
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Oct 4, 2021
Commercial Repair-Maintenance
Epc - oss- replacement of drinking fountain units
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Oct 4, 2021
Commercial Remodel
Expedited - epc - renovation of two existing outpatient procedure rooms including infrastructure for new equipment.
see revision com-2125635: modification of (e) casework, electrical panel relocation and additional equipment added to pro
Contractor:
ROEBBELEN CONTRACTING INC
Status: Finaled
Sep 3, 2021
Sign 1-5
Install four (4) illuminated monument/directional signs, install one (1) non-illuminated monument sign
Contractor:
ILLUMINATED CREATIONS INC
Status: Expired Permit
Jun 9, 2021
Commercial Remodel
Epc - remodeling several waiting rooms and receptions desks on the 1st and 2nd level at the kaiser sacramento medical office building 1 including revisions to electrical, mechanical and plumbing as required for new layout.
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
May 4, 2021
Commercial Remodel
Expedited - epc - addition of a 20 gallon water heater inside the evs room of mob2.
Contractor:
SWINERTON BUILDERS
Status: Finaled
Apr 16, 2021
Commercial Remodel
Epc - renovation of a vacated store into a coffee/refresh bar and provide a link to the courtyard.
project includes new finishes and electrical, mechanical and plumbing utilities.
Contractor:
SWINERTON BUILDERS
Status: Finaled
Dec 4, 2020
Commercial Remodel
Epc - mob 2 - 1-for-1 interior led lighting retrofit
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Oct 14, 2020
Commercial Remodel
Epc - 1-for-1 interior led lighting retrofit.
see revision com-2111661: 1-for-1 interior led lighting retrofit. see narrative for additional details
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Oct 2, 2020
Commercial Fire Equipment
Epc - initial plans did not include fire alarm drawings, as new devices were not anticipated. per jci/simplex, the existing system was outdated (incandescent system) and needed to be updated. scope includes replacement of existing devices.
Contractor:
SWINERTON BUILDERS
Status: Finaled
Sep 1, 2020
Commercial Addition
Epc - addition to commercial building - oshpd building is 41,525 sq. ft. 1 story, type 1a construction, disturbed acres is 3.7, the city of sacramento is responsible for the site work and landscape to accommodate the expansion building and
Contractor:
THE WHITING-TURNER CONTRACTING COMPANY
Status: Finaled
Aug 21, 2020
Commercial Minor
Mob #1 - remove exisitng tpo roof and install new tpo roof - 340-sq
Contractor:
ALLIANCE ROOFING COMPANY INC
Status: Finaled
Aug 4, 2020
Commercial Remodel
Epc - 1. replace existing casework and provide ada compliant casework & height
adjustable workstations within the back of house hallways.
2. remove existing pneumatic tube station and surrounding wall enclosure.
square- off adjacent w
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Jun 30, 2020
Commercial Remodel
Epc submittal - remodel of commercial building - the project is located within the 1st floor of south sacramento mob building 1. the proposed scope of work consists of renovation of an existing outpatient pharmacy.
project scope includes:
Contractor:
SWINERTON BUILDERS
Status: Finaled
May 6, 2020
Commercial Remodel
Epc - install new casework and install new data port, and lower existing power/data in the mob ii conference rms. abc. install new truncated domes at accessible parking stalls, replace existing truncated domes at curb ramps and loading zone
Contractor:
XL CONSTRUCTION CORPORATION
Status: Finaled
Apr 29, 2020
Commercial Remodel
Expedited - upgrading medical assistants work stations. relocating existing receptacles to allow adjustable work tables.
Status: Finaled
Apr 8, 2020
Commercial Remodel
(bldg mob 2) flashing retrofit to hoods, furniture modifications, duct modifications to existing hd buffer room to comply w/ usp 800 & 797 and add power outlets for the undercounter refrigerators
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Jan 2, 2020
Commercial Remodel
Expedited - kaiser permanente - tv monitor / data outlets within the db more building office location, room # 31
Status: Finaled
Dec 27, 2019
Commercial Remodel
Expedited - install aiphone system and security door at hr department entrance area. low voltage wire will be routed on existing jhooks above ceiling between master stations and control panel.
Status: Finaled
Dec 27, 2019
Commercial Remodel
Expedited - replace existing transformer with new, like for like, for mob-2 building.
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Dec 20, 2019
Commercial Remodel
Removing and replacing existing concrete stairs/guradrails and path from building to the access road.
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Dec 18, 2019
Commercial Remodel
Expedited - kaiser - pharmacy dept. remodel: installation of (1) tele-power pole for power and data to a robotic medicine dispensing unit and (2) workstations.
Contractor:
WHITTINGTON ELECTRIC INC
Status: Finaled
Nov 18, 2019
Commercial Remodel
Expedited - install card reader access points on telecom doors.
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Oct 29, 2019
Commercial Remodel
Epc - replacement permit for com-1801955 due to change of permit holder (different contractor)
Contractor:
XL CONSTRUCTION CORPORATION
Status: Finaled
Oct 28, 2019
Commercial Remodel
Expedited 15,10,10 - epc submittal - remodel of commercial building - permit to replace expired permit com-1806799 and to include additioanl scope. the projects consists of upgrading the controls and all associated components for three hy
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Sep 6, 2019
Commercial Remodel
Expedited - adding electrical for dedicated power to medical equipment.
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Sep 4, 2019
Commercial Remodel
Epc submittal - remodel of commercial building - the intent of these drawings and specifications is to add (2) duplex receptacles and data
outlet in work station area, m1248.
should any conditions develop, not covered by the contract docu
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Aug 16, 2019
Commercial Remodel
Epc - remodel and consolidate the existing health education office and “thrive” store, total of 1,485 sf into one space on its first floor at mob 2 building
Contractor:
SWINERTON BUILDERS
Status: Certificate of Occupancy
Aug 6, 2019
Commercial Remodel
Expedited - install (1) receptacles extending from existing circuit and (1) data outlets
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Jul 18, 2019
Commercial Remodel
Expedited - install (1) receptacles extending from existing circuit and (2) data outlets
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Jul 18, 2019
Commercial Remodel
Expedited - install (1) receptacles extending from existing circuit and (2) data outlets
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Jul 18, 2019
Commercial Remodel
Expedited - install (4) receptacles extending from existing circuit and (4) data outlets
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Jul 18, 2019
Commercial Remodel
Expedited - room # m 2123- electrical relocation of four outlets for (n) i.t- racks; installation of (n) i.t. racks
Contractor:
SWINERTON BUILDERS
Status: Finaled
Jul 2, 2019
Commercial Remodel
Remove 3 existing 2.5 radios and swap 3 existing 2.5 antennas with 3 new mimo antennas and 2 new hybrid cables. no ground work to be performed.
Contractor:
UNLIMITED COMMUNICATIONS INC
Status: Finaled
Jun 25, 2019
Commercial Remodel
Epc - permit to final expired permit com-1611032: mob 3, demolition of existing partitions including roll down door, ceiling, electrical/data, millwork, and furniture/fixtures. new partitions,ceiling, electrical/data, millwork, mechanical,
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
May 30, 2019
Commercial Other Struct (non-bldg)
Epc - install 133,889 sf, 2168.29 kw dc grid-tied solar photovoltaic system on an existing parking lot for kaiser permanente s. sacramento medical center. (dr17-253) - plng-insp
Contractor:
AMERESCO INC
Status: Expired Permit
May 29, 2019
Commercial Remodel
Epc - remodeling of the seven (7) existing conference rooms at the outpatient surgery center including ada upgrades to existing multi-user women's & men's restroom, interior and exterior parking signage. total area of work: 2,050 sqft.
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
May 9, 2019
Commercial Repair-Maintenance
Epc - additional scope to issued permit com-1806811. the additional scope to replace sump pump and other revisions on the approved plans are responses to a checklist that needs to be completed prior to scheduling inspection by the state el
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Feb 22, 2019
Commercial Remodel
Kaiser - electrical lighting (exam rooms - # m2226 & m2228) to consist of - the replacement of two (2) ceiling mounted exam lights; removal (non replacement) of three (3) under cabinet lights; relocation of four (4) duplex receptacles; rep
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Feb 7, 2019
Commercial Remodel
Expedited - epc submittal - remodel of 96 sf of space within the existing sterile processing area of the outpatient surgery services building to create a vestibule for access to the temporary sterile processing trailer (to be installed by o
Contractor:
XL CONSTRUCTION CORPORATION
Status: Finaled
Dec 12, 2018
Commercial Remodel
Epc - renovation of conference rooms a, b, & c at 3rd floor at the kaiser south mob 2 building.
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Withdrawn
Nov 20, 2018
Commercial Remodel
Expedited - epc - remodel the existing gi scope washer area. modify layout was required to accommodate additional equipment. revise electrical, mechanical, plumbing, fire protection, and fire detection as required for new layout.
Contractor:
XL CONSTRUCTION CORPORATION
Status: Finaled
Nov 6, 2018
Commercial Remodel
Epc - remodel for the existing cafeteria patio. scope of works include installation of concrete paving, seating trash receptacles, vine trellises, lighting, a water feature, to include but not be limited to, grading and drainage, wet utili
Contractor:
SWINERTON BUILDERS
Status: Expired Permit
Oct 29, 2018
Commercial Remodel
Epc - installation of new self contained compactor in existing loading dock area.
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Oct 22, 2018
Commercial Repair-Maintenance
Epc - scope of work consists of repairing existing truncated domes, concrete ramps and sidewalks for ada as shown in plans.
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Sep 20, 2018
Commercial Repair-Maintenance
Epc - consist of site accessibility upgrade for replacement of truncated domes, concrete ramps and sidewalks at various location shown on plans.
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Sep 20, 2018
Commercial Remodel
Epc - finishing work under expired permit com-1601419.
mob 2, the intent of these drawing is to replace obsolete unreliable pneumatic hvac controls with digital controls. no new hvac units as part of this scope.
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Sep 10, 2018
Commercial Remodel
Remodel 881 sq ft to include new partitions, electrical, mechanical, plumbing, finishes, install kitchenette, operable partitions and finishes.
(see revision com-1903820 )
minor ductwork revisions to supply & exhaust duct. 2 exhaust lin
Contractor:
SWINERTON BUILDERS
Status: Certificate of Occupancy
Sep 7, 2018
Commercial Repair-Maintenance
Epc - replace existing front door with "fire rated" door assembly.
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Aug 13, 2018
Commercial Remodel
Remove 3 existing ceiling mounted exam lights, install 5 new led exam lights in the urology and ob/gyn department.
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Aug 9, 2018
Commercial Remodel
Epc - resubmission for expired permit com-1607217 in order to final the project. original approval, com-1607217 is attached for reference
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Aug 3, 2018
Commercial Fire Equipment
Install 2 fire alarm horns in mob 2
see revision com-1813772 adding two strobes to (2) horns
Contractor:
JOHNSON CONTROLS FIRE PROTECTION LP
Status: Finaled
Jul 13, 2018
Commercial Remodel
Expedited - installing new exterior concrete in the counrtyard to provide level landing to at two exterior doors for accessibility.
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Jul 6, 2018
Commercial Remodel
Epc - construction of upgrading the controls and all associated components for two hydraulic elevators ( elevators13 and 14) in the mob-3 building at the south sacramento medical campus.
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Jul 2, 2018
Commercial Remodel
Epc - construction of upgrading the controls and all associated components for three hydraulic elevators ( elevators 9, 10 and 11) in the mob-2 building at the south sacramento medical campus.
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Expired Permit
Jul 2, 2018
Commercial Remodel
Epc - remodel of commercial building - renovation of existing gym & exercise room. accessibility upgrades to two (2) public unisex toilet rooms; accessibility upgrades to staff
(men & women) restrooms, shower and locker rooms.
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Jun 21, 2018
Commercial Remodel
Expedited - install new 50a sub-panel to existing valet parking booth in dp moore parking lot.
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Jun 21, 2018
Commercial Remodel
Epc submittal - remodel of commercial building - additional waiting area lighting, replacing the fluorescent with new led lighting and controls per title 24 lighting.
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Jun 5, 2018
Commercial Remodel
Expedited - installation of three - 20 amp dedicated circuits for new microwave ovens on the 2nd floor - ob gyn dept.. ( room aamen 2607 & room rnsta 2380)
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Jun 1, 2018
Commercial Demolition Interior
Expedited - mob 2 suite 7***interior demolition of existing non-structural interior elements, such as interior partitions, ceilings, lighting, millwork, plumbing, and finishes
Contractor:
SWINERTON BUILDERS
Status: Expired Permit
May 25, 2018
Commercial Remodel
Mob #2 suite 7 interior remodel. new interior partitions with associated plumbing/mechanical, electrical, fires sprinklers and alarm. install new operable partition separating rooms 1916 & 1917.
see revision com-1810242: incorporating
Contractor:
SWINERTON BUILDERS
Status: Certificate of Occupancy
May 21, 2018
Commercial Minor
Permit pulled to final expired permit com-1708210.
Contractor:
WHITTINGTON ELECTRIC INC
Status: Finaled
Apr 12, 2018
Commercial Web-Minor
Tear off - yes, resheet - no, 1 layer(s), 273 squares of tpo single ply. in-progress inspection required if 10 squares or greater.
Contractor:
ALLIANCE ROOFING COMPANY INC
Status: Finaled
Feb 1, 2018
Commercial Remodel
Expedited - remodel waiting room m3110a in mob 3 (south campus). relocate and extend electrical outlet and data to east wall for new wall mounted monitor. infill existing framed openings (two locations) with non-loading framing and gypsum b
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Dec 12, 2017
Commercial Fire Equipment
Epc submittal - remodel of commercial building - replace existing fire alarm system with new fire alarm system consisting of new fire alarm control panel, new initiation devices, new notification devices and interconnection with campus wide
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Oct 24, 2017
Commercial Remodel
Expedited - retrofit existing fixtures with led lights, there is no building construction or electrical wiring.
Contractor:
WHITTINGTON ELECTRIC INC
Status: Finaled
Sep 27, 2017
Commercial Remodel
Expedited - medical office building 2 adding 5 new digital lobby way finding monitors on the first floor of mob 2 in the elevator lobby m1c004
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Aug 30, 2017
Commercial Minor
Remove gravel and existing roof to concrete deck, replace insulation and install new tpo roofing.
Contractor:
KODIAK UNION ROOFING SERVICES INC
Status: Withdrawn
Jul 25, 2017
Commercial Web-Minor
Tear off - yes, resheet - no, 1 layer(s), 278 squares of tpo single ply. in-progress inspection required if 10 squares or greater.
Contractor:
ALLIANCE ROOFING COMPANY INC
Status: Finaled
Jul 18, 2017
Commercial Other Struct (non-bldg)
Epc - mob 4, building a new free standing canopy on the north side of the mob 4 trauma center. the canopy will provide weather protection and light for people waiting to enter the trailer.
increased the canopy size to 52' through cycle
Contractor:
XL CONSTRUCTION CORPORATION
Status: Finaled
Jul 5, 2017
Commercial Other Struct (non-bldg)
Epc - central utility plant yard. building a new exterior steel open air shade canopy (250 sq. ft.) over an existing steel cogeneration equipment skid. the canopy will provide weather protection for the existing electrical panels.
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Jun 30, 2017
Commercial Remodel
Expedited - remodel existing workstation room 2050 to develop anew general alcove and new work station. area of work 100 sq ft and will include new demising wall, electrical modification for relocation og existing circuit, minor plumbing r
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Jun 30, 2017
Commercial Remodel
Expedited - remodel 3rd floor conference, replace existing video conferencing equipment with new. (not oshpd)
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Jun 13, 2017
Commercial Remodel
Expedited - led lighting upgrade
see new permit com-1806763
Contractor:
WHITTINGTON ELECTRIC INC
Status: Expired Permit
May 17, 2017
Commercial Remodel
Mob 3, demolition of existing partitions including roll down door, ceiling, electrical/data, millwork, and furniture/fixtures. new partitions,ceiling, electrical/data, millwork, mechanical, fire alarm, and furniture/fixtures. new finishes,
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Expired Permit
Feb 21, 2017
Commercial Remodel
Mob 1, convert an existing ekg file room (720 sq. ft.) into an open office space.
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Feb 3, 2017
Sign 1-5
Install 2 new signs one attached illuminated and one monument illuminated. "urgent care"
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Nov 29, 2016
Commercial Remodel
Mob 2, conference room upgrade of existing and new audio / visual conferencing equipment including electrical, framing and drywall
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Nov 28, 2016
Commercial Remodel
Expedited - mob 1, renovation of existing casework within orthopedics including relocation of some existing non-emergency and emergency power, lighting and data locations, removal and re-installation of existing sinks for counter top replac
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Nov 21, 2016
Sign 1-5
Shared plans with sig-1615208, db moore, kaiser permanente. remove 1 existing faded illuminated directional monument sign leaving the base/footing & replace with new illuminated directional monument sign on existing base/footing. this permi
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Sep 22, 2016
Sign 1-5
Shared plans with sig-1615207, remove 5 existing faded illuminated directional monument signs leaving the base/footings & replace with 5 new illuminated directional monument signs on existing base/footings. this permit is to replace sig-151
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Sep 22, 2016
Commercial Remodel
Expedited - mob 1, the project scope consists of reconfiguration of electrical, data and work stations to better serve the department work flow. remove one un-necessary fire alarm pull station.
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Sep 14, 2016
Commercial Remodel
Installation of new electrical vehicle charging stations throughout the kaiser campus. install 8 chargers at main parking garage, 4 dual wall units on the 3rd level and 1 charger on the 1st level. parking lot 12, 10 make-ready stubs, 5 pe
Contractor:
CLEAN FUEL CONNECTION INC
Status: Finaled
Aug 23, 2016
Commercial Remodel
Mob 3, demolition of existing partitions, ceiling, lighting, electrical / data, plumbing, millwork, nurse call devices and furniture, fixtures and flooring. new partitions, ceiling, lighting, electrical / data, plumbing, and millwork. new w
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
Aug 4, 2016
Commercial Remodel
Mob 3, replace obsolete, unreliable pneumatic hvac controls with digital controls. no new hvac units as part of scope.
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Expired Permit
Aug 4, 2016
County Fire CF
State access
Status: Issued
May 20, 2016
Commercial Remodel
Mob 2, the intent of these drawing is to replace obsolete unreliable pneumatic hvac controls with digital controls. no new hvac units as part of this scope.
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Expired Permit
May 12, 2016
Commercial Remodel
Epc - parking lot #16 & 17, relocation of an existing parking lot light, revision to curb and gutter at entry drive and replace disturbed landscaping, the modification of an on-site parking lot entrance and installation of (2) new automatic
Contractor:
KAISER FOUNDATION HEALTH PLAN INC
Status: Finaled
May 9, 2016
Commercial Repair-Maintenance
Expedited - retrofit existing lighting fixitures with led light sources in the existing parking sturcture located at project addres. energy reduction, no structural to be done.
Contractor:
WHITTINGTON ELECTRIC INC
Status: Finaled
May 2, 2016
Check permits at another Sacramento address
Free instant lookup, no signup.
Search Sacramento permits →
Disclaimer: Permit data comes from Sacramento's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the Sacramento building department before buying, selling, or planning work.