Permit history for 555 Capitol Mall
Sacramento, CA · 107 permits on file · 2016–2025
107
Permits on file
2016
First permit
2025
Most recent
Permits on file (107)
Ordered most recent first. Data from the city's open data portal.
Facilities Permit Program Remodel
Epc - expedited - interior remodel of 7th floor restrooms.
Contractor:
PACIFIC RIDGE BUILDERS INC
Status: Finaled
Aug 22, 2025
Facilities Permit Program Remodel
Epc - expedited - t.i. to include new walls,
electrical, hvac, plumbing, fire sprinklers and fire alarm
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Aug 20, 2025
Commercial Remodel
Expedited - epc - a partial-floor tenant improvement located on the level 2 of 555 capitol mall. demolition work includes demolition of non-structural walls and finishes. an addition of a new private office with new lighting, power outlets
Contractor:
WILSON DELANG CONSTRUCTION GROUP
Status: Issued
Mar 21, 2025
Commercial Remodel
Epc - new corridor on the 10th floor - demo, new walls, electrical, fire sprinklers and fire alarm
Contractor:
SIRBAUGH ROOFING SPECIALIST
Status: Finaled
Jan 16, 2025
Commercial Fire Equipment
Epc - the telephone lines and existing 411 udac communicator shall be removed and replaced with a new fc2015-u1 dialer module and a telguard tg-7s cellular communicator.
Contractor:
ENGINEERED MONITORING SYSTEMS
Status: Finaled
Dec 3, 2024
Sign 1-5
Install two (2) illuminated wall signs carbon monoxide & smoke alarms required. reference crc sections r315 & r314.
Contractor:
ILLUMINATED CREATIONS INC
Status: Finaled
Nov 25, 2024
Facilities Permit Program Remodel
Epc - expedited - interior improvements to suite 400 to include new walls, electrical, mechanical and fire alarm
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Jul 28, 2023
Facilities Permit Program Remodel
Expedited - epc- fpp- remodel 4th floor restrooms- remodel to include new walls, demo, electrical and plumbing
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
May 16, 2023
Facilities Permit Program Remodel
Epc - expedited - suite #725 - interior improvement to include demo, new walls, electrical, fire sprinklers and hvac
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Nov 16, 2022
Sign 1-5
Install one (1) illuminated wall sign
Contractor:
COAST SIGN INCORPORATED
Status: Expired Permit
Aug 19, 2022
Commercial Other Struct (non-bldg)
Epc. shared plans main permit. installation of five dart/dart tails- two darts: excavate footing and install base anchor plate into concrete footing, then pour concrete pad for finish grade. three dart tails: excavating 6'' to pour a concre
Contractor:
SAENZ LANDSCAPE CONSTRUCTION COMPANY
Status: Finaled
Jul 19, 2022
Commercial Other Struct (non-bldg)
Epc. shared plans dart e. installation of five dart/dart tails- two darts: excavate footing and install base anchor plate into concrete footing, then pour concrete pad for finish grade. three dart tails: excavating 6'' to pour a concrete pa
Contractor:
SAENZ LANDSCAPE CONSTRUCTION COMPANY
Status: Finaled
Jul 19, 2022
Commercial Other Struct (non-bldg)
Epc. shared plans dart d. installation of five dart/dart tails- two darts: excavate footing and install base anchor plate into concrete footing, then pour concrete pad for finish grade. three dart tails: excavating 6'' to pour a concrete pa
Contractor:
SAENZ LANDSCAPE CONSTRUCTION COMPANY
Status: Finaled
Jul 19, 2022
Commercial Other Struct (non-bldg)
Epc. shared plans dart c. installation of five dart/dart tails- two darts: excavate footing and install base anchor plate into concrete footing, then pour concrete pad for finish grade. three dart tails: excavating 6'' to pour a concrete pa
Contractor:
SAENZ LANDSCAPE CONSTRUCTION COMPANY
Status: Finaled
Jul 19, 2022
Commercial Other Struct (non-bldg)
Epc. shared plans dart b. installation of five dart/dart tails- two darts: excavate footing and install base anchor plate into concrete footing, then pour concrete pad for finish grade. three dart tails: excavating 6'' to pour a concrete pa
Contractor:
SAENZ LANDSCAPE CONSTRUCTION COMPANY
Status: Finaled
Jul 19, 2022
Sign 1-5
Install two (2) illuminated wall signs, install three (3) non-illuminated wall signs, install two (2) sets door/window vinyl, re-skin one (1) existing awning, install two (2) illuminated interior wall signs.
Contractor:
COAST SIGN INCORPORATED
Status: Expired Permit
Jul 12, 2022
Facilities Permit Program Remodel
Epc - expedited - tenant finish out
Contractor:
B T BUILDERS INC
Status: Finaled
Jun 9, 2022
Facilities Permit Program Remodel
Epc - interior improvement to include demo, new walls, electrical and plumbing
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Mar 3, 2022
Facilities Permit Program Remodel
Expedited - epc - interior remodel to include new walls, electrical, hvac and fire sprinklers. (no demo) ste 735
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Dec 7, 2021
Commercial Addition
Epc - new exterior fence around outdoor seating expansion for house restaurant. 1093sf
Contractor:
B T BUILDERS INC
Status: Finaled
Dec 2, 2021
Commercial Other Struct (non-bldg)
Epc - complete work on expired com-2002645; installation of structural framing for future signage. area of the future signage is 35' x 115' & 30' x 30'; sign permit will be submitted separately -sig-2002797 - plng-insp
Contractor:
VISION SIGN INC
Status: Finaled
Aug 16, 2021
Commercial Fire Equipment
Epc - replace smoke detector to a heat detector due to false alarms.
Contractor:
ENGINEERED MONITORING SYSTEMS
Status: Finaled
Aug 11, 2021
Facilities Permit Program Remodel
Epc - remodel to include demo, new wall, electrical and hvac
Contractor:
BROWNING CONSTRUCTION INC
Status: Expired Permit
Jul 26, 2021
Facilities Permit Program Remodel
Epc - demo, new walls, electrical, plumbing, hvac, fire alarm and fire sprinklers
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Jul 26, 2021
Facilities Permit Program Remodel
Epc - interior improvements to include demo, new walls, electrical, hvac, plumbing, fire alarm and fire sprinklers
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Jul 7, 2021
Facilities Permit Program Remodel
Expedited - epc - suite # 440: 1831 sf -remodel : demolition of existing interior improvements; construction of (n) improvements to include: interior partitions, finishes, and plumbing , electrical and fire sprinklers. (b--e-p-f)
see r
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Jun 16, 2021
Commercial Web-Minor
E-permit: tear off - yes, resheet - no, 1 layer(s), 90 squares of pvc single ply. crrc: 0674-0031
Contractor:
TECTA AMERICA SACRAMENTO INC
Status: Expired Permit
Jun 9, 2021
Commercial Remodel
Epc - exterior lighting upgrade to meet ca. atm lighting requirements. scope of work is all exterior and includes: replacing 8 existing fixtures and adding 4 new fixtures.
Contractor:
LIN R ROGERS ELECTRICAL CONTRACTORS INC
Status: Finaled
May 25, 2021
Commercial Remodel
Epc - upgrade of power to garage and connect digital signs to permanent power from smud. tapping into the existing smud vault.
Contractor:
VISION SIGN INC
Status: Finaled
Jan 11, 2021
Facilities Permit Program Remodel
Expedited - epc - suite 180,
(no demo)
new walls
electrical
hvac
plumbing
fire sprinklers and alarms
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
May 26, 2020
Commercial Fire Equipment
Epc - first floor only***removal and replacement of mxlv control components, remote annunciators, and network cards.
Contractor:
ENGINEERED MONITORING SYSTEMS
Status: Finaled
May 13, 2020
Sign 1-5
Installation of digital signs on garage of 555 capitol mall. structural framing review under permit com-2002645.
($1,800,000 for the signage and $500,000 for structural framing) - plng-insp
Contractor:
VISION SIGN INC
Status: Finaled
Mar 23, 2020
Commercial New Temp Power
Epc - temporary power for installation of digital signs on garage of 555 capitol mall. structural framing review under permit com-2002645.($1,800,000 for the signage and $500,000 for structural framing)
Contractor:
VISION SIGN INC
Status: Expired Permit
Mar 18, 2020
Commercial Other Struct (non-bldg)
Epc - installation of structural framing for future signage. area of the future signage is 35' x 115' & 30' x 30'; sign permit will be submitted separately -sig-2002797 - plng-insp
Contractor:
VISION SIGN INC
Status: Expired Permit
Mar 5, 2020
Commercial Fire Equipment
Fire alarm system installation within the (restroom only - 1 st floor)
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Mar 4, 2020
Commercial Remodel
Expedited - #710 changing existing office to 2offices new partitions, electrical, mechanical and fire protection
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Feb 28, 2020
Commercial Remodel
Expedited - remodel suite #570 to include: demo of existing improvements, construction of new improvements in existing office space. new partitions & finishes, modification of existing hvac, electrical, fire sprinklers and fire alarm.
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Dec 3, 2019
Commercial Remodel
Expedited - suite 440 - floor plan renovation to existing 1831-sqft office space to include removal of partition walls to create open office space and modifications to electrical & fire sprinklers / alarm.expedited - suite 440 - revision to
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Nov 8, 2019
Commercial Remodel
Expedited - suite 460: demo of existing partitions. new interior partitions & finishes, modification of hvac electrical, fire sprinklers & fire alarm.
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Nov 7, 2019
Commercial Remodel
Expedited - remodel 14th floor restrooms to include: demolition as needed, new framing, new plumbing and electrical. upgrades for accessibility
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Oct 1, 2019
Commercial Remodel
Expedited - ground floor accessibility upgrades to existing restrooms
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Sep 17, 2019
Commercial Remodel
Remove existing 100hp fan in fan room and remove all metal transitions from motor housing to plenum. install new ductwork and (9) 15hp fan array. install new access door and needed support for fans and controls.
Contractor:
FAMAND INC
Status: Finaled
Aug 22, 2019
Facilities Permit Program Remodel
Expedited - epc - 10th floor, tenant improvement to an office space. scope includes adding new non-load bearing walls, glass partitions, and installation of new millwork.
Contractor:
DESCOR INC
Status: Finaled
Jun 13, 2019
Commercial Remodel
Expedited - 15th floor remodel: minor drywall repair. new cabinets, led lighting replacement, new flooring and paint. demolition work included.
Contractor:
B T BUILDERS INC
Status: Finaled
May 13, 2019
Commercial Remodel
Expedited - tenth floor interior demo work for a ti that will be under separate permit, demo includes removal of walls and ceiling
Contractor:
DESCOR INC
Status: Finaled
Apr 17, 2019
Commercial Remodel
Expedited - office remodel to include: new interior partitions and finishes for (1) new office and telecom room; modification of existing hvac , electrical and fire sprinkler systems.
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Feb 22, 2019
Feb 22, 2019
Commercial Remodel
Replace existing ground floor store front with new, new canopy, new landscape, new flatwork. - plng-insp
Contractor:
HOLLAND CONSTRUCTION
Status: Finaled
Jan 2, 2019
Facilities Permit Program Remodel
Expedited - epc - 14th floor, tenant improvement for merrill lynch. including new interior partitions, new electrical & lighting, new ductwork, modifications to the existing fire sprinkler system. new finishes throughout.
Contractor:
B T BUILDERS INC
Status: Finaled
Nov 19, 2018
Facilities Permit Program Remodel
Expedited - epc - work includes but is not limited to replacement of hvac equipment, use of existing electrical service, metal stud and glazed partitions, ceilings, flooring and casework.
Contractor:
ICON GENERAL CONTRACTORS INC
Status: Certificate of Occupancy
Nov 6, 2018
Commercial Remodel
Expedited - consolidating existing suites 525 and 545 into one suite 525 demolition work consist of removal of walls doors and door frames and finishes "not for occupancy"
Contractor:
ICON GENERAL CONTRACTORS INC
Status: Finaled
Oct 31, 2018
Commercial Fire Equipment
Install hood / duct ansul pcu fire system
Contractor:
SENTINEL FIRE EQUIPMENT COMPANY
Status: Finaled
Oct 26, 2018
Commercial Remodel
Expedited - tenant improvement of 7th floor. removal and relocation of existing door, frame and hardware. construction of new partition. replacement of damaged ceiling. new floor and wall finishes. existing casework to remain.
Contractor:
ASI-ANTHONY & SONS GENERAL CONTRACTORS INC
Status: Finaled
Oct 24, 2018
Facilities Permit Program Remodel
Expedited - epc submittal - remodel of commercial building - interior remodel of existing space to include new walls, plumbing,electrical and hvac
*****expedited - revision to fpp-1816353: hvac - (fresh air ) change in the duct work ..****
Contractor:
BROWNING CONSTRUCTION INC
Status: Expired Permit
Oct 15, 2018
Commercial Fire Equipment
Hook-up ul300 hood duct ansul system.
Contractor:
SENTINEL FIRE EQUIPMENT COMPANY
Status: Finaled
Sep 27, 2018
Commercial Remodel
Shared plans (with revision com-1814747) - expand existing restaurant into adjacent office space. increases restaurant by 630 square feet.
Contractor:
HOLLAND CONSTRUCTION
Status: Finaled
Sep 13, 2018
Sign 1-5
Install 1 illuminated canopy sign camden 6.375 sq ft
Contractor:
ILLUMINATED CREATIONS INC
Status: Finaled
Aug 27, 2018
Facilities Permit Program Remodel
Expedited - east tower first floor remodel. add interior walls to demise existing space for future tenants. new restrooms, two new exterior doors, extend existing flatwork and railing.
Contractor:
HOLLAND CONSTRUCTION
Status: Finaled
Jun 14, 2018
Commercial Remodel
First floor restaurant remodel to include new partition walls, plumbing / electrical / mechanical distribution, kitchen equipment, new air scrubber. see revision com-1814747: added cane rails and modified tile specs (reviewed under com-181
Contractor:
HOLLAND CONSTRUCTION
Status: Certificate of Occupancy
Jun 14, 2018
Commercial Fire Equipment
Add 1 new fire alarm device in suite 1215.
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Jun 4, 2018
Sign 1-5
Install (1) attached / illuminated wall sign
Contractor:
ILLUMINATED CREATIONS INC
Status: Finaled
May 23, 2018
Commercial Remodel
Expedited - interior remodel of suite 1215 to include the demolition of existing partitions. new partitions with associated electrical, plumbing/mechanical and fire sprinklers.
Contractor:
BROWNING CONSTRUCTION INC
Status: Expired Permit
Mar 16, 2018
Commercial Fire Equipment
555 capitol mall suite #700 fire alarm
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Feb 27, 2018
Facilities Permit Program Remodel
Expedited - 10th floor remodel to include minor rework of partitions, finishes, ceiling, lighting and me/fp to accommodate new layout.
Contractor:
DESCOR INC
Status: Finaled
Jan 26, 2018
Commercial Remodel
Expedited - suite 455: demolition of existing interior improvements. construction of new improvements. work to include new interior partitions, finishes, plumbing, hvac, electrical & fire sprinklers.
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Jan 16, 2018
Commercial Remodel
Expedited - suite 700 interior remodel w/ demolition, new interior partitions & finishes, modification of existing hvac, electrical and fire sprinklers.
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Jan 8, 2018
Sign 1-5
Install 2 attached illuminated wall signs. "visit california" - plng-insp
Contractor:
ILLUMINATED CREATIONS INC
Status: Issued
Dec 27, 2017
Commercial Remodel
Expedited - suite 650 interior remodel of existing interior communicating stairs between the 5th and 6th floor for santec office space.
Status: Finaled
Dec 8, 2017
Facilities Permit Program Remodel
Expedited 5,5,5- 4th floor office space remodel of 10,131 sq ft, to include mechanical, plumbing, electrical, fire sprinklers, fire alarm and reconfiguring the interior layout.
Contractor:
HOLLAND CONSTRUCTION
Status: Finaled
Nov 30, 2017
Facilities Permit Program Remodel
Expedited - suite 355, new interior partitions, relocate existing lighting, power, data, ductwork & grid per the architectural drawings. relocate 2-cwib's, new vav per mechanical plans. relocate & add fire sprinklers per the fire sprinkler
Contractor:
B T BUILDERS INC
Status: Finaled
Nov 15, 2017
Commercial Remodel
Expedited - interior remodel suite 1195 new finishes, electrical and fire sprinklers.
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Oct 30, 2017
Commercial Remodel
Voluntary seismic upgrades to the west tower.
Contractor:
HOLLAND CONSTRUCTION
Status: Finaled
Sep 5, 2017
Facilities Permit Program Remodel
Expedited - suite 265, new interior partitions for future tenants, including electrical and hvac upgrades
Contractor:
B T BUILDERS INC
Status: Finaled
Sep 1, 2017
Commercial Remodel
Expedited - new partitions, electrical, mechanical and plumbing. remodel suite 480
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Aug 16, 2017
Commercial Fire Equipment
Adding(1) new strobe and relocate (14) existing fire alarm devices connecting to existing fire alarm system. suite 1215
Contractor:
VALLEY FIRE AND SECURITY ALARMS INC
Status: Finaled
Jul 20, 2017
Sign 1-5
Install one illuminated wall sign and one non illuminated wall sign on existing fountain. bank of america see revision com-1715537: method of anchorage / attachment to wall changed. see pg 4
Contractor:
ILLUMINATED CREATIONS INC
Status: Finaled
Jul 18, 2017
Commercial Remodel
Expedited - suite 1255 interior office improvement including new partitions, plumbing, electrical, fire sprinklers reconfig. per improvements and hvac
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Jul 10, 2017
Commercial Remodel
Expedited - remodel of existing 2nd floor restrooms, electrical and plumbing,
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Jun 30, 2017
Commercial Remodel
Expedited - new partitioning modifications to existing hvac, plumbing, electrical and fire sprinklers. & remodel suite 1200 & 1215
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Jun 19, 2017
Commercial Remodel
Remodel 2nd floor to include new partitions, work to plumbing/mechanical/electrical/fire
Contractor:
B T BUILDERS INC
Status: Finaled
Apr 12, 2017
Sign 1-5
Install one set of channel letters. "old soul co."
Contractor:
ILLUMINATED CREATIONS INC
Status: Finaled
Apr 10, 2017
Commercial Remodel
Expedited - demo of existing improvements, construction of new improvements. new interior partitions, finishes, plumbing, electrical, hvac modifications, & fire sprinklers.
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Mar 30, 2017
Facilities Permit Program Remodel
Expedited - interior remodel suite 995. new interior partitions with associated plumbing/mechanical, electrical and fire sprinklers.
Contractor:
B T BUILDERS INC
Status: Expired Permit
Mar 22, 2017
Facilities Permit Program Remodel
Expedited - suite 545, interior improvements including new walls, hvac, electrical, fire sprinklers, carpet and paint
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Feb 14, 2017
Facilities Permit Program Remodel
Expedited - 1 st floor, interior remodel for future coffee shop tenant 1610 sq. ft.
Contractor:
B T BUILDERS INC
Status: Finaled
Jan 19, 2017
Commercial Remodel
Expedited - suite 1155. interior remodel to include interior demo of walls. minor rework of partitions, finishes, ceiling, lighting and mep/fp to accommodate new layout.
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Jan 5, 2017
Facilities Permit Program Remodel
Expedited - 2nd floor, remodel 1,808 sq. ft.
Contractor:
B T BUILDERS INC
Status: Finaled
Dec 13, 2016
Commercial Addition
Remove existing on site sidewalk and replace with new uncovered patio, fencing and landscaping for future tennants. - plng-insp
Contractor:
HOLLAND CONSTRUCTION
Status: Expired Permit
Dec 12, 2016
Sign 1-5
Install (2) attached/illuminated projecting (blade) signs for parking garage
Contractor:
ILLUMINATED CREATIONS INC
Status: Expired Permit
Nov 18, 2016
Commercial Remodel
Expedited - suite 747 interior remodel to include new partitions with associated utilities.
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Oct 20, 2016
Commercial Demolition Interior
Expedited - suite 255 interior demolition of existing partitions and associated plumbing/mechanical and electrical.
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Oct 3, 2016
Commercial Remodel
Expedited - remodel ste#1295, install partition walls, plumbing, hvac, finishes, electrical & fire sprinklers
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Sep 28, 2016
Commercial Fire Equipment
Installing 2 speaker strobes and 1 pull station east tower 1st floor.
Contractor:
ENGINEERED MONITORING SYSTEMS
Status: Expired Permit
Sep 21, 2016
Facilities Permit Program Remodel
Expedited - new ground floor demising wall for future tenant spaces. includes hvac, electrical, and fire sprinkler work in preparation for future tenant.
. - plng-insp
Contractor:
B T BUILDERS INC
Status: Finaled
Sep 9, 2016
Commercial Remodel
Expedited - remodel 15th fl at select locationsthat include new cabinetry, elcetrical, and finish upgrades
Contractor:
B T BUILDERS INC
Status: Finaled
Aug 12, 2016
Sign 1-5
Install (1) illuminated wall sign for sacramento business journal
Contractor:
ILLUMINATED CREATIONS INC
Status: Finaled
Aug 9, 2016
Facilities Permit Program Remodel
Expedited - remodel of 5th and 6th floor core restrooms.
Contractor:
B T BUILDERS INC
Status: Finaled
Jul 20, 2016
Commercial Fire Equipment
Suite 985 / modify existing fire alarm system
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Jul 20, 2016
Commercial Remodel
Expedited - suite 985-gbb office remodel-interior office remodel only. installing demising wall and creating two offices to include new ceilings, and minor modifications to fire sprinklers, install electrical, carpeting and painting. modify
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Jun 9, 2016
Commercial Remodel
Converting a portion of ground floor to retail, installing new awning (less than 4' depth), new ground floor storefront, reconfigured exit corridor, including removal of landscaping for the new path of travel. - plng-insp , plans reviewed u
Contractor:
B T BUILDERS INC
Status: Finaled
Jun 1, 2016
Facilities Permit Program Remodel
Expedited - interior remodel suites 550 & 650. new interior partitions, with associated meps and fire sprinkler and alarm. see com-1612857 for the revised structural steel for the moveable partition track pathway.
Contractor:
B T BUILDERS INC
Status: Finaled
May 27, 2016
Facilities Permit Program Repair-Maintenance
Expedited - switch gear modification in basement
Contractor:
SCHETTER ELECTRIC INC
Status: Finaled
Apr 29, 2016
Commercial Remodel
Expedited - suite 640 interior remodel. work to include new partitions, finishes, plumbing modification of the existing hvac, electrical and fire sprinklers.
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Apr 22, 2016
Commercial Remodel
Expedited - suite 700-interior remodel to include new walls, demo walls, new electrical, relocate grills, relocate fire sprinkler heads.
Contractor:
BROWNING CONSTRUCTION INC
Status: Finaled
Mar 24, 2016
Commercial Demolition Interior
Expedited - suites 550 and 650 floor 5th(1/2 wing) & 6th floor (west wing) interior demo only. no other work proposed on this permit.
Contractor:
B T BUILDERS INC
Status: Expired Permit
Mar 18, 2016
Commercial Fire Equipment
Suite 240-fire alarm modification: adding (2) strobe and (3) new speaker/strobes. connecting to existing fire alarm system.
Contractor:
VALLEY FIRE AND SECURITY ALARMS INC
Status: Expired Permit
Jan 15, 2016
Commercial Fire Equipment
Suite 215-add 1 strobe and 1 speaker/strobe to existing fire alarm system.
Contractor:
VALLEY FIRE AND SECURITY ALARMS INC
Status: Finaled
Jan 15, 2016
Check permits at another Sacramento address
Free instant lookup, no signup.
Search Sacramento permits →
Disclaimer: Permit data comes from Sacramento's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the Sacramento building department before buying, selling, or planning work.