Permit history for 500 Capitol Mall

Sacramento, CA · 50 permits on file · 2016–2026

50
Permits on file
2016
First permit
2026
Most recent

Permits on file (50)

Ordered most recent first. Data from the city's open data portal.

Facilities Permit Program Remodel
Epc - expedited - remodel to include demo and new interior partitions, door frames, finishes, ceilings and lighting. rework of mechanical, electrical, plumbing and fire sprinklers to accommodate new layout
Status: Issued
Apr 1, 2026
Sign 1-5
Install one (1) illuminated wall sign
Status: Finaled
Nov 20, 2024
Facilities Permit Program Remodel
Epc - expedited - tenant improvement to include demo and new interior partitions, door frames, finishes, ceilings and lighting. rework of mechanical, electrical, plumbing and fire sprinklers to accommodate new layout
Contractor: J SUTTER BUILDERS
Status: Finaled
Nov 14, 2024
Facilities Permit Program Remodel
Expedited - epc - suite 1900, tenant suite expansion including rework of walls, doors, lighting, ceiling, mechanical, electrical and plumbing- 19th floor
Status: Finaled
Jul 15, 2024
Facilities Permit Program Remodel
Epc - expedited - suite 1760 - remodel to include demo and new interior partitions, door frames, finishes, ceilings and lighting. rework of mechanical, electrical, plumbing and fire sprinklers to accommodate new suite revision com-242057
Status: Finaled
Jun 13, 2024
Commercial Remodel
Epc - remodel to include a second production line. install outlets and data boxes. previous remodel finaled under com-2322009.
Contractor: REX MOORE GROUP INC
Status: Expired Permit
May 10, 2024
Sign 5+
Replacement face, 3.8 sf replacment wall signs, north elevation and west elevation, 20 sf each. window and dor vinyl replacments, wall plaque replacement. temporary signs. all signs will connect to existing electrical.
Status: Finaled
May 6, 2024
Facilities Permit Program Remodel
Epc - expedited - suite 800 - corporate office build out in existing warm shell suite including new partitions, doors, ceilings, light fixtures, finishes, casework, mechanical, electrical, plumbing and fire protection
Status: Finaled
Apr 24, 2024
Facilities Permit Program Remodel
Epc - expedited - tenant suite improvements to include: new partitions, doors, mechanical, electrical, and fire protection for new layout. all existing plumbing to be reused.
Contractor: J SUTTER BUILDERS
Status: Finaled
Mar 12, 2024
Commercial Fire Equipment
Epc - expand fire alarm notification circuit.
Contractor: REX MOORE GROUP INC
Status: Expired Permit
Jan 10, 2024
Facilities Permit Program Remodel
Epc - expedited - tenant improvement - new walls, doors, finishes, mechanical, electrical, plumbing, fire protection reworked to accommodate new layout
Contractor: J SUTTER BUILDERS
Status: Finaled
Dec 20, 2023
Commercial Fire Equipment
Epc - modification/add to existing fire alarm system due to ti remodel
Contractor: REX MOORE GROUP INC
Status: Expired Permit
Dec 18, 2023
Commercial Remodel
Epc - expedited - remodel of existing cafe for panera bread- new interior walls in dining room and kitchen. update lighting; replacing existing pendant lighting, remove existing front counters and replace with new. install drains and electr
Contractor: JORGE LARA CHAVEZ
Status: Finaled
Dec 4, 2023
Sign 1-5
Installation of 1 led internally illuminated exterior wall signs and 1 led illuminated interior hanging sign.
Status: Finaled
Oct 26, 2023
Commercial Demolition Interior
Expedited - suite 120 interior demo of non-load bearing walls, fixtures, and finishes.
Contractor: JORGE LARA CHAVEZ
Status: Expired Permit
Oct 20, 2023
Sign 5+
Replacement face, 3.8 sf replacment wall signs, north elevation and west elevation, 20 sf each. window and dor vinyl replacments, wall plaque replacement. temporary signs. all signs will connect to existing electrical.
Status: Expired Permit
Jun 21, 2023
Facilities Permit Program Remodel
Expedited - epc- fpp 500 capitol mall remodel ste 2100- 2002 sq ft tenant improvement in multi tenant 21st floor, includign demo and construction of non-structural partitions,ceilings,finsihses and furniture/equipment, and assosciated desig
Status: Finaled
Jun 13, 2023
Facilities Permit Program Remodel
Epc - expedited - reworking existing suite entrance to accommodate "give back" space from tenant. demolition of walls, furniture and ceiling elements,new walls, herculite doors, minor power and reworking ceiling, hvac, fire sprinkler and el
Contractor: J SUTTER BUILDERS
Status: Finaled
Aug 9, 2022
Facilities Permit Program Remodel
Epc - expedited - 5th floor tenant improvements including new partitions, finishes, mechanical, electrical and plumbing and the inclusion of a horizontal exit, and adding an assembly use to the 5th floor roof
Contractor: J SUTTER BUILDERS
Status: Finaled
Jun 24, 2022
Facilities Permit Program Remodel
Epc - expedited - tenant suite improvements - 23rd floor
Contractor: Universal Solutions
Status: Finaled
May 10, 2022
Facilities Permit Program Remodel
Epc - demolition of existing and construction of new partitions, ceilings, finishes, mechanical/plumbing and electrical upgrades.
Status: Finaled
Apr 18, 2022
Commercial Demolition Interior
Expedited - eotc interior demolition for suit 2000 to prepare for remodel fpp-2204388 .
Status: Finaled
Mar 15, 2022
Facilities Permit Program Remodel
Epc - removal of portion of existing workstations at 4th floor to make room for new private office. new walls, door, light fixtures and paint.
Status: Finaled
Oct 26, 2021
Commercial Fire Equipment
Epc - modification/addition to existing fire alarm system. suite #1810
Contractor: REX MOORE GROUP INC
Status: Finaled
Apr 6, 2021
Facilities Permit Program Remodel
Expedited - epc - remove existing interior finishes, non-load bearing interior wall and ceiling. new non-load bearing interior wall, door, ceiling, finishes and lighting. modify existing electrical and hvac see revision fpp-2104792 r
Contractor: DESCOR INC
Status: Finaled
Feb 22, 2021
Commercial Remodel
Install 7 dual ev chargers & transformer revision com-2103381 show existing bollard and utility draing
Contractor: REX MOORE GROUP INC
Status: Finaled
Dec 21, 2020
Facilities Permit Program Remodel
Expedited - epc - suite 2200, remodel of commercial building - suite 2200 remodel to include the demolition of some partitions,new full width sidelites at offices, new flooring and wallfinishes, new electrical in some areas and reworked mec
Status: Finaled
Feb 25, 2020
Facilities Permit Program Remodel
Expedited - epc - 9th & 14th floor, remodel of commercial building - tenant improvement - new walls, doors, mechanical, electrical, fire protection, 9th floor (690) 14th floor (585)
Status: Finaled
Jan 30, 2020
Facilities Permit Program Remodel
Expedited - epc - suite 1560, remodel of commercial building - selected demolition of (e) non-load bearing walls and ceiling system,new interior finishes,new non-load bearing, non-rated walls ,new suspended acoustic ceiling system,new light
Status: Finaled
Dec 20, 2019
Facilities Permit Program Remodel
Expedited - epc - suite 1900, remodel of commercial building - tenant suite expansion, including rework of walls, mechanical and electrical. new lighting throughout - 19th floor
Status: Certificate of Occupancy
Nov 27, 2019
Facilities Permit Program Remodel
Expedited - epc - suite 2250 - remodel of commercial building - tenant improvements - new partitions, doors, electrical, and plumbing. fire protection and mechanical reworked as required (see fpp-1914151: relocate 1 fire sprinkler head, ad
Status: Finaled
Jun 17, 2019
Commercial Remodel
Epc -suite 120 - interior remodel to include new storage in existing restaurant space (351 sf), new partition walls, equipment and millwork, new fire sprinklers, and mechanical.
Status: Finaled
May 17, 2019
Facilities Permit Program Remodel
Expedited - epc - the scope of work includes interior tenant improvements to 500 capitol mall, suite 1500 with modifications to mechanical, electrical, plumbing, fire alarm and fire sprinkler.
Status: Finaled
Apr 11, 2019
Facilities Permit Program Remodel
Expedited - epc - suite 2150, 21 floor tenant improvements
Status: Finaled
Dec 7, 2018
Facilities Permit Program Remodel
Expedited - epc - remodel of commercial building - suite 1800 remodel to include miscellaneous demolition, new partitions, flooring and wall finishes. new electrical, mechanical, plumbing and fire protection. unoccupied suite 1880 scope
Contractor: J SUTTER BUILDERS
Status: Finaled
Nov 29, 2018
Facilities Permit Program Remodel
Expedited - epc - suite 2260, tenant remodel and expansion on the 22nd floor. to include new partitions, doors ceiling, finished mechanical, electrical, fire protection
Contractor: J SUTTER BUILDERS
Status: Finaled
Nov 2, 2018
Commercial Remodel
Remodel to include expansion into existing "shell" space. adding two (2) walk-in freezer boxes. expanding deli-prep counter space. reconfiguration of sales display fixtures. updating fire system. adding a type-ii hood in deli. - plng-insp
Contractor: J SUTTER BUILDERS
Status: Expired Permit
Oct 12, 2018
Sign 1-5
Replace (2) attached / illuminated (1) attached / non-illuminated signs for bank of the west
Status: Finaled
Sep 27, 2018
Facilities Permit Program Remodel
Epc - expedited - remodel of interior space, 3396 sf.
Contractor: J SUTTER BUILDERS
Status: Finaled
Jul 24, 2018
Facilities Permit Program Remodel
Expedited - suite 1000, tenant improvement of existing suite and corridor improvements. new partitions, doors, ceilings, lighting, finishes, mechanical, electrical, plumbing, and fire protection
Contractor: J SUTTER BUILDERS
Status: Finaled
Apr 10, 2018
Facilities Permit Program Remodel
Expedited - suite 1060, new walls, doors, ceiling, lights, finishes, mechanical, electrical, plumbing, and fire protection.
Contractor: J SUTTER BUILDERS
Status: Finaled
Apr 10, 2018
Facilities Permit Program Remodel
Expedited - suite 1900, tenant improvement and corridor improvement
Status: Finaled
Nov 16, 2017
Commercial Demolition Interior
Expedited - 19th floor miscellaneous demolition to suite 1900 to include walls, millwork, light fixtures, finish fixtures , door and wall finishes.
Status: Expired Permit
Oct 10, 2017
Commercial Fire Equipment
Furnish & install a clean agent fire suppression system for the server room
Status: Expired Permit
Dec 20, 2016
Facilities Permit Program Tenant Improvement
Expedited - suite 200 first time tenant improvement. 8601 square feet office space for california school information services. new interior partitions, ceilings and associated, plumbing/mechanical, electrical and fire sprinklers and alarm
Contractor: J SUTTER BUILDERS
Status: Certificate of Occupancy
Sep 2, 2016
Facilities Permit Program Tenant Improvement
Expedited - first time tenant improvement suite 1150. new partitions with associated plumbing/mechanical, electrical, fire sprinklers and fire alarm.
Contractor: J SUTTER BUILDERS
Status: Certificate of Occupancy
Aug 16, 2016
Sign 1-5
Install (1) illuminated / attached wall sign for "jll" suite 2300
Status: Finaled
Jul 22, 2016
Commercial Remodel
Expedited - remodel ste #1000 enrty and new conference room layout.
Status: Finaled
Jun 10, 2016
Facilities Permit Program Tenant Improvement
Expedited - 1st time tenant improvement (10,976 square feet) for regus, ste 2350. includes new offices, lighting, minor plumbing an mechanical modifications.
Status: Finaled
Apr 11, 2016
Facilities Permit Program Tenant Improvement
Expedited - suite 2300 interior tenant improvement to include new offices, lighting, plumbing/mechanical, fire sprinklers and alarm.
Status: Finaled
Mar 4, 2016

Check permits at another Sacramento address

Free instant lookup, no signup.

Search Sacramento permits →
Disclaimer: Permit data comes from Sacramento's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the Sacramento building department before buying, selling, or planning work.