Permit history for 0 Unknown
Sacramento, CA · 500 permits on file · 2022–2026
500
Permits on file
2022
First permit
2026
Most recent
Permits on file (500)
Ordered most recent first. Data from the city's open data portal.
County Fire CF
Solar/ pv system- installation of a 12.42kw roof mounted pv system with 27 modules, 27 microinverters and a 20kwh energy storage system consisting of (2) ess units
Contractor:
N R G CLEAN POWER INC
Status: Issued
Apr 23, 2026
County Fire CF
Build a new detached 1199sf adu with 524 sf attached garage
(please note: the main existing resident address is 5841 40th st. the adu address is 5845 40th st.)
Contractor:
POLI BUILDING
Status: Issued
Apr 22, 2026
County Fire CF
Construct 650 square foot, two bed, one bath adu in back yard per plan with 40 square foot covered porch, relocated existing electrical service per plan as required by smud
county#cbnr2026-00185
Status: Issued
Apr 22, 2026
County Fire CF
Proposed construction of one building approximately 558,000 sf with loading docks, parking, drive aisles, perimeter landscaping and street lighting along lone tree road. total development= 30 acres
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Issued
Apr 21, 2026
County Fire CF
Revision to fire alarm permit cf-2601322- install new relay modules to shutdown new rooftop units; rtus 1 & 2 together
Contractor:
J - FOUR ENTERPRISES INC
Status: Issued
Apr 20, 2026
County Fire CF
Tenant improvement remodel, demise one suite into 4 smaller separate units
Status: Issued
Apr 20, 2026
County Fire CF
Revision to fa permit cf-2601315- install new relay modules to shutdown new rooftopunits; rtus 1 & 2 together
Status: Issued
Apr 20, 2026
County Fire CF
Revision to cf-2601320- install new relay modules to shutdown new rooftop units; rtus 1 and 2 together
Status: Issued
Apr 16, 2026
County Fire CF
Revision to cf-2512865-plan revision to remove 100 linear feet of 8 bays of racks
county # cbac2025-00197
Contractor:
BIG JOE CALIFORNIA NORTH INC
Status: Issued
Apr 7, 2026
County Fire CF
Revision to cf-2523981-install storage racks in an existing warehouse
Status: Issued
Apr 2, 2026
County Fire CF
Treatment area to receive new cosmetic upgrades to the facility including but not limited to new chase counter tops and plumbing fixtures in a like for like replacement. new paint, frp, and flooring at selective locations. new watch boxes a
Status: Issued
Apr 2, 2026
County Fire CF
Project includes minor modification to an existing tenant improvement and installation of new equipment. add 2 ea. pendants and relocate 2 ea. pendents.
Contractor:
GPS COMMERCIAL CONSTRUCTION INC
Status: Issued
Mar 19, 2026
County Fire CF
8' tall black vinyl-coated chain-link fencing is to enclose the tenant truck court
county# cbnc2026-00049
Status: Issued
Mar 19, 2026
County Fire CF
Tenant remodel of existing office spaces, fire alarm plans
Contractor:
DPR CONSTRUCTION A GENERAL PARTNERSHIP
Status: Issued
Mar 12, 2026
County Fire CF
Tenant remodel of existing office spaces. fire sprinkler plans
Status: Issued
Feb 26, 2026
County Fire CF
Install underground fire main piping - revision to cf-2526801
Status: Issued
Feb 26, 2026
County Fire CF
Installation of fire sprinkler systems and fire pump. (pls note. fire inspection collected on main permit cf-2502756)
Contractor:
COSCO FIRE PROTECTION INC
Status: Issued
Feb 9, 2026
County Fire CF
Relocate fire sprinklers and add fire sprinklers at new tenant ceiling layout. remodel
Contractor:
MARQUEE FIRE PROTECTION LLC
Status: Issued
Feb 6, 2026
County Fire CF
Replacing existing generator and concrete generator pad with new 40 kw diesel generator. replacing (2) existing hvac units with (2) new hvac units and installing (2) new hvac disconnects. installing new service outlet in waterproof enclos
Contractor:
TOTAL ENVIRONMENTAL & POWER SYSTEMS INC
Status: Issued
Feb 4, 2026
County Fire CF
Fire protection plans -build out of 9,813 sf office space in existing esfr warehouse
Status: Issued
Feb 2, 2026
County Fire CF
Add two relays to existing fa system a community building to shunt trip power to outside gates in a fire event.
Contractor:
ALLCOM ELECTRIC INC
Status: Withdrawn
Jan 22, 2026
County Fire CF
Fire alarm improvements to support construction of a -+/2.890 sq office for a speculative warehouse tenant, building permit application submitted to sac county record cbac2025-0052
Status: Issued
Jan 21, 2026
Jan 21, 2026
County Fire CF
Fire sprinkler improvements for +/-2,890 sf office construction for speculative warehouse tenant. building permit applicaiton submitted to sacramento county record cbac2025-00502
Contractor:
WEST COAST FIRE PROTECTION SYSTEMS CO INC
Status: Issued
Jan 2, 2026
County Fire CF
Revision to cf-2507119-
plans revision to add 12 linear feet or one bay of rack, and reposition one bay of rack. original scope is to install 183 feet of 12' tall racks only
Contractor:
BIG JOE CALIFORNIA NORTH INC
Status: Issued
Dec 23, 2025
County Fire CF
Revision to permit cf-2521639- added restroom to ti area
Contractor:
J - FOUR ENTERPRISES INC
Status: Finaled
Dec 18, 2025
County Fire CF
Battery and roof pv- (42) 16.605kw dc modules (2) 13.5kwdc battery, 200a subpanel, 225a main panel upgrade
Contractor:
NORTH VALLEY LLC
Status: Issued
Dec 10, 2025
County Fire CF
Building new adu, preapproved by sacramento county. redwood model. no fire sprinkler system required
Contractor:
KY'S HOME IMPROVEMENT COMPANY
Status: Issued
Oct 30, 2025
Oct 14, 2025
County Fire CF
High-pild storage plans with notes, site and floor plans. revision 2-
Status: Finaled
Oct 8, 2025
County Fire CF
Installation of a large (00288) and a small (00287) shade structures with led lighting (one permit per structure) the large structure will include a solar array on the roof and associate conduit, wire, and electrical controller/cabinet
Status: Issued
Oct 8, 2025
County Fire CF
Tenant fitout /interior improvements of 64,500 sf warehouse space, expansion of office space and addition of interior cold storage facility
Status: Issued
Oct 7, 2025
County Fire CF
Installation of 12 new level 2 electric vehicle charging stations (evcs) to the existing sacramento employee parking garage at 625 7th st. the work includes the installation of conduit, pull boxes and conductors to fee the 12 evc's
Status: Issued
Oct 2, 2025
County Fire CF
21 roof mounted solar modules and 1 tesla powerall 3 (legacy)
Contractor:
FREEDOM FOREVER NORTHERN CALIFORNIA LLC
Status: Issued
Sep 26, 2025
County Fire CF
Install a roof-mounted pv system and energy storage system
Contractor:
ES SOLAR LLC
Status: Issued
Sep 25, 2025
County Fire CF
Roadway infrastructure improvement project that extends bear paw drive approximately 1,700 feet due south of meister way and 1,700 feet due west. parcel viewer 201-1020-141- currently no address, only parcel number
Status: Issued
Sep 24, 2025
County Fire CF
New tenant improvement to new retail suite. adding fire horn strobe notification and global shutdown for new hvac unit. all devices will be integrated with the existing building fire alarm system that is operational and monitored
Status: Issued
Sep 23, 2025
County Fire CF
Per the inspector the duct detectors needed to be added to the symbol legend shown as furnished by others. revision to cf-2323493- fire inspection fee's paid on main permit cf-2210106
Contractor:
FOOTHILL FIRE PROTECTION INC
Status: Finaled
Sep 22, 2025
County Fire CF
Per the inspector the duct detectors needed to be added to the symbol legend shown as furnished by others- revision to cf-2323907
Contractor:
FOOTHILL FIRE PROTECTION INC
Status: Finaled
Sep 18, 2025
County Fire CF
Fire alarm work: install supervised relays to shut down bigass fans upon alarm condition
Contractor:
REX MOORE GROUP INC
Status: Issued
Sep 18, 2025
County Fire CF
(n) 3,750 sf office ti, provide and install (5) 30,000 eod's (10) dock bumpers, 6' chain link fence with vinyl slates (2) auto slide gates of truck yard.
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Finaled
Sep 18, 2025
County Fire CF
Revision to main permit:cf-2405103
revision to high-piled storage plans with notes, site and floor plans
fire inspection paid on original permit cf-2222200
Status: Issued
Sep 17, 2025
County Fire CF
New arco am/pm, car wash and fueling canopy with 8 multiple product dispensers 12 fueling positions, three underground storage tanks, and related site improvements
Status: Issued
Sep 17, 2025
County Fire CF
Construction of new two story single family residence
please note fire sprinklers submittal deferred per w. gildersleeve
Contractor:
SRB CONSTRUCTION
Status: Issued
Sep 12, 2025
County Fire CF
This project is a (663,390) square feet, one story storage building with adjacent office and refrigeration machine room. the building consists of steel structure. walls are tilt concrete panels with metal awning and metal panel siding above
Status: Issued
Sep 10, 2025
County Fire CF
Replace standalone duct detectors at makeup air unit (mau-1 &mau-2) with addressable type duct detector and program to fire alarm control panel
Contractor:
ACCO ENGINEERED SYSTEMS INC
Status: Finaled
Sep 9, 2025
County Fire CF
Co2 permit for bulk co2 at new arco am pm c-store
Status: Issued
Sep 9, 2025
County Fire CF
Replace the existing sprinkler monitoring system in order to add a cellular communicator
Contractor:
BAY ALARM COMPANY
Status: Issued
Sep 8, 2025
County Fire CF
Install a energy storage system: (02) tesla powerwall 3 (23.0kw, 27.0 okwh) (01) tesla backup switch (01) tesla remote meter (01) energy system disconnect (01) ess combiner subpanel
Contractor:
ES SOLAR LLC
Status: Issued
Sep 8, 2025
County Fire CF
Replace the existing sprinkler monitoring system in order to add a cellular communicator
Contractor:
BAY ALARM COMPANY
Status: Issued
Sep 2, 2025
County Fire CF
This project is associated to permit: cbnc2025-00037, this project includes the installation of a micro grid system that includes a roof mounted and vertical well mounted photo voltaic (pv) aarray (3) linked battery energy storage system
Status: Issued
Sep 2, 2025
County Fire CF
Construction of a bollard goal post at the auto entrance of the existing target food distribution center at 7450 metro air parkway
Contractor:
RYAN COMPANIES US INC
Status: Issued
Aug 20, 2025
County Fire CF
Install a fire alarm system consisting of a new fire alarm control panel with internal dialer located in the fire pump room
Contractor:
INDUSTRIAL ELECTRONIC SYSTEMS INC
Status: Issued
Aug 8, 2025
County Fire CF
(20) new sprinklers at ceiling in new ti. (35) replace heads at roof above the ti due to new r-30 insulation (3) new sprinklers at roof to maintain proper sprinkler coverage
Contractor:
J - FOUR ENTERPRISES INC
Status: Issued
Aug 6, 2025
County Fire CF
Install a energy storage system: ·(01) tesla powerwall 3 (11.5kw, 13.5kwh) · (01) powerwall dc expansion unit (13.5kwh)·(01) tesla powerwall 3 (11.5kw, 13.5kwh) · (01) powerwall dc expansion unit (13.5kwh) (01) tesla backup switch· (
Contractor:
ES SOLAR LLC
Status: Finaled
Aug 5, 2025
County Fire CF
Install a energy storage system: (02) tesla powerwall 3 (23.0
Contractor:
ES SOLAR LLC
Status: Finaled
Jul 31, 2025
County Fire CF
This project is associated to county permit# cbnc2025-00037. this project includes the installation of a micro grid system that includes a roof mounted and vertical well mounted photo voltaic (pv) array (3) linked battery energy storage sy
Status: Issued
Jul 30, 2025
County Fire CF
(main permit) the project is proposing a 3 story u-haul storage building with site amenities such as pavement, landscaping, parking and on-site detention basins. the project will have 2 entrances from 44-ft street for site circulation. no
Status: Issued
Jul 30, 2025
County Fire CF
Build out of a 1,400 sf office space in an existing esfr warehouse
Status: Finaled
Jul 29, 2025
County Fire CF
Install a pre-fab bus sized spray booth (1,362 sf,) (fire suppression system by c-16 contractor)
Status: Issued
Jul 29, 2025
County Fire CF
Removal of existing conveyor system, installation of new conveyer system, installation of robotic palletizer with concrete footing. installation of access platform, with sprinkler underneath. installation of electrical circuitry off of exi
Contractor:
SILMAN VENTURE CORPORATION
Status: Finaled
Jul 28, 2025
County Fire CF
New half plex; 1253 sq ft livable space w/ 233 sf garage
Status: Issued
Jul 8, 2025
County Fire CF
Installing a cellular communicator to the previously approved system
Contractor:
EVERON LLC
Status: Issued
Jul 7, 2025
County Fire CF
Fire monitoring system: provide a new cellular communicator with enclosure and document cabinet
Status: Finaled
Jul 1, 2025
County Fire CF
Install 183 linear feet of 12' tall racks only.
Contractor:
BIG JOE CALIFORNIA NORTH INC
Status: Issued
Jun 19, 2025
County Fire CF
Revision for cf-2510989 - update / revised drawings now reflect only needing two (2) devices, not three (3) from previous permit revision.tenant remodel to meet exiting requirements to include: adding exterior exit door and replacing/adding
Contractor:
DPR CONSTRUCTION A GENERAL PARTNERSHIP
Status: Finaled
Jun 16, 2025
County Fire CF
Sprinkler revision to original permit cf-2418472 original sprinkler layout didn't take in to account of an existing structural beam. the revised sprinkler plan shows the new sprinkler layout and theaddition of 12 new sprinkler heads
Status: Finaled
Jun 13, 2025
County Fire CF
Tower work: remove (3) antenna(s), (3) rru(s), and (3) tma(s). install (9) pipe mount(s), (6) crossover plate kit(s), (3) back to back bracket(s), (12) pipe to angle mount(s), (3) antenna(s), and (3) rru(s). ground work: remove (1) -48vdc
Status: Issued
Jun 10, 2025
County Fire CF
Revision for cf-2400374- tenant remodel to meet exiting requirements to include: adding exterior exit door and replacing/adding illuminated exit signage. revision to plans includes adding three (3) devices back to facp that will control th
Contractor:
DPR CONSTRUCTION A GENERAL PARTNERSHIP
Status: Issued
Jun 5, 2025
County Fire CF
Fire sprinklers approved/architectural office remodel and expansion within existing unit . this includes demolition and construction of non-bearing partitions and reconfiguration of existing ceiling grid and tile. structural. none. all new
Status: Issued
Jun 3, 2025
Jun 3, 2025
County Fire CF
New fire sprinkler system with fire pump for new 2-story vocational trainging pre-engineer metal builiding. cosco scope to start at fire riser flange 1'-0" above finish floor
Contractor:
COSCO FIRE PROTECTION INC
Status: Issued
May 28, 2025
County Fire CF
Location of containers onto an approved site, b occupancy 160 sf container to house security camera routers and monitors. other containers to support a open air canopy (fabric) for servicing equipment in the shade.
Status: Issued
May 27, 2025
May 23, 2025
County Fire CF
Replace (63) heads at roof above ti due to new r-30 batt insulation.
install (32) new heads at ceiling.
relocate existing branchline in warehouse space.
install (9) new heads at roof near new full height wall and (48) new heads at ro
Status: Issued
May 22, 2025
County Fire CF
Offsite improvement plans- the proposed development includes offsite improvements associated with the development of 7360 metro air parkway. metro air parkway improvements include: frontage sidewalk and landscaping, median removal and curb
Status: Issued
May 21, 2025
County Fire CF
Construct approximately 2,864 sf of office space as well as associated improvements inside a new warehouse shell.
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Finaled
May 19, 2025
County Fire CF
Construct approximately 2,240 sf. of office space as well as associated improvements inside a new warehouse shell
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Finaled
May 19, 2025
County Fire CF
Install 4 new heads in the new suspended ceiling grid.
Contractor:
J - FOUR ENTERPRISES INC
Status: Finaled
May 19, 2025
County Fire CF
New 2 story 21025 sf steel framed building over slab on grade with steel open web joist and concreted filled metal deck 2nd floor.
building is occupancy group b type v-b, 480 occupancy load. building is fire sprinklered with a fire alarm
Status: Issued
May 13, 2025
County Fire CF
Construct approximately 2,880 sf of office space as well as associated improvements inside a new warehouse shell.
Status: Finaled
May 13, 2025
County Fire CF
(9) new gbqr fire sprinklers at the roof above the ti area
(24) replace the existing esfr heads at the roof with new gbqr sprinklers above the ti area
(17) install new sprinklers into the new ti ceilings
(5) install new sprinklers
Status: Finaled
May 13, 2025
County Fire CF
Non structural interior renovation of an 1295 sf existing space with minor interior demolition to flooring wall base and modular wall.
the project with consist of interior cabinetry updates/ additions, appearance facelift to existing spa
Status: Issued
May 9, 2025
County Fire CF
(6) new gbqr fire sprinklers at the roof above the ti area
(24) replace the existing esfr heads at the roof with new gbqr sprinklers above the ti area
(18) install new sprinkler into the new ti ceilings
Status: Finaled
May 9, 2025
County Fire CF
Installation of a davit crane on the exterior parapet wall
Status: Issued
May 9, 2025
County Fire CF
(5) new gbqr fire sprinklers at the roof above the ti area
(21) replace the existing esfr heads at the roof with new gbqr sprinklers above the ti area
(15) install new sprinkler into the new ti ceilings
Status: Finaled
May 9, 2025
County Fire CF
Black chain link fencing with motorized gates and pedestrian access doors.
Status: Finaled
May 7, 2025
County Fire CF
(15) add fire sprinklers into the new ti ceilings
(9) add fire sprinkler heads at the roof in the warehouse space, (7) add fire sprinkler heads at the roof above ti area
(3) add fire sprinklers on the new branch-line near new full height
Status: Issued
Apr 29, 2025
County Fire CF
Replacement a damaged fire alarm panel for an existing fire sprinkler monitoring system. add 01 smoke detector above fire alarm panel, and 01 pull station in facp room.
Contractor:
PERFORMANCE SYSTEMS INTEGRATION INC
Status: Finaled
Apr 28, 2025
County Fire CF
Interior construction for office suite, including walls, doors, ceiling and floor/wall finishes. associated mechanical, electrical and plumbing required
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Finaled
Apr 22, 2025
County Fire CF
Interior construction for office suite, including walls, doors, ceiling and floor/wall finishes. mechanical, electrical and plumbing with added chain link fence with motorized gates and ev parking. demising wall separating spaces.
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Finaled
Apr 22, 2025
County Fire CF
Construction of new adu, driveway and separation fence from neighbor. no fire sprinklers
Status: Issued
Apr 17, 2025
County Fire CF
Pv roof mount 19.74kw 47 panels, 2 (n) batteries 13.5kwh
Contractor:
JAJ ROOFING
Status: Issued
Apr 11, 2025
County Fire CF
Upgrade the facu due to maintenance issues and add a cellular communicator to this existing manual fire alarm system as the single path means of alarm transmission
upgrade the facu due to maintenance issues and add a cellular communicator
Contractor:
BAY ALARM COMPANY
Status: Finaled
Apr 11, 2025
Apr 10, 2025
Apr 10, 2025
Commercial New Building
Epc - building a 267-sqft greenhouse w/ gravel floor - no utilities or interior finishes.
access greenhouse through empty parcel on 1108 azusa (owned by same po).
Status: Finaled
Apr 10, 2025
County Fire CF
Garage conversion into an adu
Status: Issued
Apr 9, 2025
County Fire CF
Fire alarm spec ti suite #200 - revision to approved plans (cf-2427132)
Contractor:
J - FOUR ENTERPRISES INC
Status: Finaled
Apr 8, 2025
County Fire CF
Revisions 2 is a revision to the approved plans and original permit:cf-2227431- this revision shows that the fire sprinkler lines existing the fire pump house have been upsized from 8-inch to 10-inch lines. ths is change was approved in the
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Issued
Apr 7, 2025
County Fire CF
Construct approximately 2,500 sf of office space with associated improvements within an existing warehouse including a demising wall along the north elevation of the building
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Finaled
Apr 2, 2025
Mar 25, 2025
County Fire CF
The scope of work is limited to obtaining an occupancy permit for cal fire. designated as "b" and "s-1" occupancy, in "as-is" condition for their operation. the layout of existing walls to remain as-is. therefore, no work to the existing
Status: Issued
Mar 20, 2025
County Fire CF
Tenant improvement, consisting of infilling the existing full height wall to create a demising wall between suites 6 & 7. top notch will occupy suite 7 and suite 6 will remain vacant the mechanical, plumbing, electrical and fire sprinkler
Status: Finaled
Mar 14, 2025
County Fire CF
Installation of 9.77kw solar pv: twenty-three (23) qtron425 modules on roof of resience; installation of 13.5kwh energy storage system: one(1) tesla powerall 3 (for whole home backup) within 5' of the main electric panel. main panel upgrad
Contractor:
CAPITAL REMODEL & DESIGN INC
Status: Finaled
Mar 14, 2025
County Fire CF
Installation of 752 bays of pallet racking into an existing warehouse facility. proposed square footage (racking being installed) = 55,000 square feet. (high pile storage)
Status: Finaled
Mar 6, 2025
County Fire CF
Remodel of existing burger king, including seating and decor with ada improvements
Status: Issued
Mar 5, 2025
County Fire CF
Addition, construct a 2 bedroom 1 bathroom 529 sq. ft.
Contractor:
BOSS CONSTRUCTION SERVICES
Status: Issued
Mar 4, 2025
Feb 28, 2025
Feb 28, 2025
County Fire CF
Proposed scope is to obtain a high piled storage permit for the installation of pre-manufactured storage racks and palletized storage
Status: Issued
Feb 20, 2025
Feb 20, 2025
County Fire CF
(14) new sprinklers at ceiling in new ti, (24) replace heads at roof above the ti due to new r-30 insulation (9) new sprinklers at roof to maintain proper sprinkler coverage. add and relocated branchline to maintain proper spacing and cover
Contractor:
J - FOUR ENTERPRISES INC
Status: Issued
Feb 14, 2025
County Fire CF
Installation of 9 gates at entrances and exits of associate and truck parking lots, additional perimeter fencing, and curb and landscape removal and replacement.
Status: Issued
Feb 10, 2025
County Fire CF
The permit number new single story family home to be built on vacant lot 4 bedroom, 2 bathrooms. dwelling 1734 sq ft., garage 454 sq ft, front porch 72 sq ft, rear or 55 sq. ft.
Status: Issued
Feb 10, 2025
County Fire CF
New 3 bedroom 2 bath 1,200 sf adu per the design plans and elevations
Status: Issued
Feb 7, 2025
County Fire CF
Revision to main permit# cf-2415270
installation of an air-sampling smoke detection for the new battery storagearea within the (e) warehouse. installation includes: -air sampling smoke detectors and sampling tube.- system programming and
Contractor:
SABAH INTERNATIONAL INCORPORATED
Status: Finaled
Feb 6, 2025
County Fire CF
Legalize 896 sf. of added living space. replace wall and attic insulation, windows and doors, drywall on ceilings and walls repair exterior and replace roofing, rewire electrical, replace plumbing fixtures
Status: Issued
Jan 30, 2025
County Fire CF
(3) new esfr 25.2k sprinkler systems 2000 gpm at 168 psi diesel fire pump (fire inspection fee collected on permit cf-2227431)
Contractor:
J - FOUR ENTERPRISES INC
Status: Finaled
Jan 29, 2025
County Fire CF
Relocate and replace / add (83) fire sprinklers for tenant improvement. revision to cf-2415690
Contractor:
AQUAMATIC FIRE PROTECTION INC
Status: Issued
Jan 24, 2025
County Fire CF
Fire alarm installation to fire pump house
Contractor:
J - FOUR ENTERPRISES INC
Status: Finaled
Jan 22, 2025
County Fire CF
Demolition of non-load bearing partitions, flooring, and acoustical ceiling systems. consolidate (2) existing suites +- 5,820 sf) in a commercial -industrial building.
Status: Finaled
Jan 20, 2025
County Fire CF
This is a new construction project in the town of freeport.
Status: Issued
Jan 16, 2025
County Fire CF
Construction of new two story (21,676) building along with site improvements associated with new building. improvements are associated with the approved water main extension plans (cf-2408946) previously approved (cf-2416209) need re appro
Status: Issued
Jan 14, 2025
County Fire CF
Install 489 linear feet or - 8,000 sq. ft. of high piled storage racks county permit# cbac2023-0654
Contractor:
BIG JOE CALIFORNIA NORTH INC
Status: Finaled
Jan 13, 2025
County Fire CF
Installation of a new fire sprinkler system
Status: Issued
Jan 9, 2025
County Fire CF
(16) new sprinklers at ceiling in new ti (32) replace heads at roof above the ti due to new r-30 insulation (8) new sprinklers at roof to maintain proper sprinkler coverage
Contractor:
J - FOUR ENTERPRISES INC
Status: Finaled
Jan 3, 2025
County Fire CF
Replaced fa panel only, all other devices reamined the same existing fa panel old and discontinued. all other devices reamined the same, added tg7 cellular dialer
Status: Finaled
Jan 3, 2025
County Fire CF
Building release letter-existing restrooms, new fixtures and reworked plumbing as require for new restroom layout, updated electrical for new rest room lay out, new restoorm entry doors etc.
Status: Issued
Jan 3, 2025
County Fire CF
(3) new esfr 25.2 k sprinkler systems 2000 gpm at 168 psi diesel fire pump is under little dipper - building a
Contractor:
J - FOUR ENTERPRISES INC
Status: Finaled
Dec 26, 2024
County Fire CF
Honeywell hwf2-com fire communicator installation. no other changes to the existing sprinkler monitoring system, that has been previously approved.
Status: Finaled
Dec 20, 2024
Dec 19, 2024
County Fire CF
New half-plex: 1253 sq ft livable space w/ 233 sf garage
Status: Finaled
Dec 18, 2024
County Fire CF
New half-plex; 1253 sq ft livable space w/ 233 sf garage
Status: Finaled
Dec 18, 2024
County Fire CF
(4) newesfr25.2k sprinkler systems 2000 gpm at 168 psi diesel fire pump is under little dipper - building a
Contractor:
J - FOUR ENTERPRISES INC
Status: Finaled
Dec 12, 2024
County Fire CF
The scope of work consists of expanding the existing office use into an existing unoccupied shell space. the project will consist of constructing a single wall to separate this office space from the open shell space for office use. this s
Status: Issued
Dec 12, 2024
Commercial Other Struct (non-bldg)
Epc - public art project for the sacramento office of arts + culture. install artwork made of steel on a concrete service pad in existing landscape planters.
Contractor:
SAENZ LANDSCAPE CONSTRUCTION COMPANY
Status: Finaled
Dec 12, 2024
County Fire CF
The project will include the demolition and removal of existing site features and furnishings including, but not limited to, concrete, various site paving and vegetation. the improvements will include an expanion of the north parking lot,
Status: Issued
Dec 10, 2024
County Fire CF
Residential fire sprinklers reference master plan (1) cf-2410120
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Dec 8, 2024
County Fire CF
The scope of work consists of build out of existing shell space to include: addition of power and ventilation for equipment small water filtration system to be installed and compressed air and n2 systems to be installed as well.
Contractor:
RUDOLPH & SLETTEN INC
Status: Issued
Dec 5, 2024
County Fire CF
Electrical only. construction of the tenant improvements including adding a 200 amp panel, disconnects, and receptacles. no changes to the existing fire protection system are proposed under this permit. the architectural and structural p
Status: Issued
Nov 22, 2024
County Fire CF
Create an addition to existing garage and build adu. scope of work incldes removing and reinstalling siding, removing garage door, pouring foundation on addition, framing, installing trusses,
Status: Issued
Nov 20, 2024
County Fire CF
New 904 s.f. adu on the rear of existing property. existing fire hydrant across the street on 41st ave.
Status: Issued
Nov 20, 2024
County Fire CF
Residential fire sprinklers reference master plan (1) cf-2410120
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Nov 18, 2024
County Fire CF
Fire alarm installation- please note, fire inspection fee collected on main permit cf-2227431
Contractor:
J - FOUR ENTERPRISES INC
Status: Finaled
Nov 14, 2024
Nov 14, 2024
County Fire CF
Scope is to obtain a high piled storage permit for the installation of pre-manufactured storage racks
Status: Finaled
Nov 14, 2024
County Fire CF
Fire alarm installation please note, fire inspection fee collected on main permit cf-2227431
Contractor:
J - FOUR ENTERPRISES INC
Status: Finaled
Nov 14, 2024
County Fire CF
Residential fire sprinklers reference master plan (3) cf-2410125
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Nov 8, 2024
County Fire CF
Residential fire sprinklers reference master plan (1) cf-2410120
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Nov 8, 2024
County Fire CF
Residential fire sprinklers reference master plan (2) cf-2410123
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Nov 8, 2024
County Fire CF
Residential fire sprinklers reference master plan (3) cf-2410125
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Nov 8, 2024
County Fire CF
Residential fire sprinklers reference master plan (3) cf-2410125
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Nov 8, 2024
County Fire CF
Residential fire sprinklers reference master plan (2) cf-2410123
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Nov 8, 2024
County Fire CF
Residential fire sprinklers reference master plan (1) cf-2410120
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Nov 8, 2024
Nov 7, 2024
County Fire CF
Residential fire sprinklers reference master plan (1) cf-2410120
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Issued
Nov 5, 2024
County Fire CF
Residential fire sprinklers reference master plan (2) cf-2410123
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Nov 5, 2024
County Fire CF
Residential fire sprinklers reference master plan (3) cf-2410125
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Nov 5, 2024
County Fire CF
Residential fire sprinklers reference master plan (2) cf-2410123
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Nov 5, 2024
County Fire CF
Residential fire sprinklers reference master plan (3) cf-2410125
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Nov 5, 2024
County Fire CF
Residential fire sprinklers reference master plan (1) cf-2410120
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Nov 5, 2024
County Fire CF
Residential fire sprinklers reference master plan (3) cf-2410125
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Nov 5, 2024
County Fire CF
Residential fire sprinklers reference master plan (2) cf-2410125
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Nov 5, 2024
County Fire CF
Residential fire sprinklers reference master plan (2) cf-2410123
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Nov 5, 2024
County Fire CF
Residential fire sprinklers reference master plan (2) cf-2410120
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Nov 1, 2024
County Fire CF
Relocation of existing fire alarm panel and cellular communicator from inside building to the exterior
Contractor:
PERFORMANCE SYSTEMS INTEGRATION INC
Status: Finaled
Nov 1, 2024
County Fire CF
Residential fire sprinklers reference master plan (10) cf-2410120
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Nov 1, 2024
County Fire CF
Residential fire sprinklers reference master plan (3) cf-2410125
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Oct 31, 2024
Oct 30, 2024
Commercial Other Struct (non-bldg)
Epc - residential infill infrastructure permit only. all impact fees will be accessed under separate building permit. private onsite grading, utility, and landscape site work for a residential subdivision of 60 lots (12 common lots and 48 s
Status: Issued
Oct 28, 2024
County Fire CF
Construction of the tenant improvements including adding a demising wall, dock doors and a drive-in door. no changes to the existing fire protection system are proposed under this permit.
Status: Issued
Oct 25, 2024
County Fire CF
Residential fire sprinklers reference master plan (2) cf-2410120
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Oct 22, 2024
County Fire CF
Residential fire sprinklers reference master plan (1) cf-2410120
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Oct 22, 2024
County Fire CF
Residential fire sprinklers reference master plan (1) cf-2410120
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Oct 22, 2024
County Fire CF
Residential fire sprinklers reference master plan (3) cf-2410125
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Oct 22, 2024
County Fire CF
Residential fire sprinklers reference master plan (3) cf-2410125
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Oct 21, 2024
County Fire CF
Residential fire sprinklers reference master plan (2) cf-2410123
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Oct 21, 2024
County Fire CF
Residential fire sprinklers refence master plan (2) cf-2410123
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Oct 21, 2024
County Fire CF
Building release letter-an addition of (2) 60kw dc chargers to and existing 225 amp 480 volt panetl
Status: Issued
Oct 21, 2024
County Fire CF
Residential fire sprinklers reference master plan (1) cf-2410120
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Oct 11, 2024
County Fire CF
Residential fire sprinklers reference master plan (2) cf-2410123
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Oct 11, 2024
County Fire CF
Revision to original permit: cf-2404395 to add new pendant sprinklers in new dropped down ceilings-
Contractor:
FOOTHILL FIRE PROTECTION INC
Status: Finaled
Oct 11, 2024
Oct 11, 2024
County Fire CF
Residential fire sprinklers reference master plan (1) cf-2410120
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Oct 11, 2024
County Fire CF
Install in-rack fire sprinkler system into carpet storage racks
Contractor:
J - FOUR ENTERPRISES INC
Status: Issued
Oct 10, 2024
County Fire CF
Residentialfire sprinklers- reference master plans (3) cf-2410125
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Oct 7, 2024
County Fire CF
Residential fire sprinklers reference masster plan (2) cf-24101213
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Oct 7, 2024
Oct 4, 2024
County Fire CF
Residential fire sprinklers reference master plan (2) cf-2410120
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Oct 3, 2024
County Fire CF
Residential fire sprinklers/ reference master plan (2) cf-2410123
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Oct 3, 2024
County Fire CF
In- rack fire sprinklers for lithium-ion battery storage room. revision to permit cf-2416311
Contractor:
J - FOUR ENTERPRISES INC
Status: Finaled
Oct 1, 2024
County Fire CF
Installation of selective pallet racking in (1) area (s) of the warehouse with (5 to 6) beam level (s) per bay. the system will be installed per the attached drawings, structural calculations and structural details sheet.
Status: Finaled
Sep 27, 2024
County Fire CF
Installation of (2) autel dual port- level 2 evsh , (2) 208 v panel (1) stop down transformer
Contractor:
COIL INC
Status: Issued
Sep 6, 2024
County Fire CF
Installation of new walk in coolers for packaged food facility
Status: Issued
Sep 5, 2024
County Fire CF
Fire alarm ti- connect fire alarm system to vesda system. (vesda system being installed by others)
Contractor:
J - FOUR ENTERPRISES INC
Status: Finaled
Sep 4, 2024
County Fire CF
Installation of an air-sampling smoke detection for the new battey storage within the (e) warehouse installation includes:- air sampling smoke detectors and sampling tube. - system programming and testing
Contractor:
SABAH INTERNATIONAL INCORPORATED
Status: Issued
Sep 4, 2024
County Fire CF
Install 1,251 linear feet or ~11,864 sq. ft. of high piled storage racks
Contractor:
BIG JOE CALIFORNIA NORTH INC
Status: Finaled
Sep 3, 2024
County Fire CF
In-rack fire sprinklers for lithium-ion battery storage room-
Status: Issued
Aug 30, 2024
County Fire CF
Construction of an approx. 11,950 sf new battery storage area within the existing warehouse. associated electrical and structural work.
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Finaled
Aug 30, 2024
County Fire CF
Installation of one 2' domestic water services and meters and one 12" private fire hydrant service to remove the existing building off of their private wells that currently serve both domestic and fire protection water.
Status: Issued
Aug 27, 2024
County Fire CF
Removal of an existing prefabricated metal stair on the building (exterior). removal of a portion of railing on a metal stair on the south side of the building (exterior)./ removal of existing interior cates, relocation of a pit charging s
Status: Issued
Aug 20, 2024
County Fire CF
Modify existing fire sprinkler due to location of new wall. existing sprinklers will be raised or lowered via hangers to accomodate new hard lid in bathrooms
Status: Finaled
Aug 20, 2024
County Fire CF
Revision- to cf-2408946- installation of two 2' doemstic water services and meters and one 12' private fire hydrant service to remove the two existing building off of their private wells that currently serve both domestic and fire protecti
Status: Issued
Aug 14, 2024
County Fire CF
Construction of new two story (21,676 sf) building along with site improvements associated with new building. improvements are associated with the approved water main extension plans
Status: Issued
Aug 14, 2024
County Fire CF
(county permit# cbnc2024-00217-proposed pergolas for existing reyes warehouse
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Issued
Aug 9, 2024
County Fire CF
Installation of 11.40 kw dc stc pv solar system on rooftop- county permit number: misc2024-00394
Contractor:
BARNUM & CELILLO ELECTRIC INC
Status: Finaled
Aug 7, 2024
County Fire CF
Remodel interior office space form open floor plan to private offices. frame new walls, adjust t-bar and lighting. modify sprinkler pendants as required for new office layout and walls
Status: Issued
Aug 7, 2024
County Fire CF
Install a 5.60kw roof mount pv system with 1 tesla battery for back up
Contractor:
SUN AT WORK ELECTRIC INC
Status: Issued
Aug 6, 2024
County Fire CF
Residential fire sprinklers- reference master plan (2) cf-2410123
Status: Finaled
Jul 26, 2024
County Fire CF
Residential fire sprinklers reference master plan (1) cf-2410120
Status: Finaled
Jul 26, 2024
County Fire CF
Residential fire sprinklers- reference master plan (2) cf-2410120
Status: Finaled
Jul 26, 2024
County Fire CF
Residential fire sprinklers reference master plan (2) cf-2410123
Status: Finaled
Jul 26, 2024
County Fire CF
Residential fire sprinklers reference master plan (2) cf-2410123
Status: Finaled
Jul 26, 2024
County Fire CF
Residential fire sprinklers reference master plan (2) - cf-2410123
Status: Finaled
Jul 26, 2024
County Fire CF
Residential fire sprinklers- reference mater plan (3) original master plan permit - cf-2410125
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Jul 26, 2024
County Fire CF
Residential fire sprinklersreference master plan (1) cf-2410120
Status: Finaled
Jul 26, 2024
County Fire CF
Customer is adding an additional riser to existing sprinkler system. make additions to the existing fire alarm system. add (1) waterflow connection and (1) b-fly valve tamper connection to fire alarm system. new devices located in pump r
Status: Finaled
Jul 25, 2024
County Fire CF
Proposed def (diesel exhaust fluid) def tank for existing reyes warehouse
(county permit #misc2024-01100
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Finaled
Jul 24, 2024
County Fire CF
Revision - added two relay modules to two fans inside cold storage (original permits cf-2222200)
Contractor:
J - FOUR ENTERPRISES INC
Status: Finaled
Jul 17, 2024
County Fire CF
Roof mounted ballasted pv system with 1472 modules each at 540w with 12 inverters 9 at 60kw and 3 at 50kw. total system size is 794.99 kw dc stc and 736.7 kw ac cec 1472
Contractor:
CALIFORNIA SOLAR INTEGRATORS INC
Status: Finaled
Jul 17, 2024
County Fire CF
Residential fire sprinklers reference master plan (1) cf-2410120- (please note fire fees collected on cf-2410120)
Contractor:
FIRE SPRINKLER SYSTEMS INC
Status: Finaled
Jul 16, 2024
County Fire CF
Residential fire sprinklers reference master plan (2) cf-2410123
Status: Finaled
Jul 16, 2024
County Fire CF
Residential fire sprinklers reference master plan (3) cf-2410125
Status: Finaled
Jul 16, 2024
County Fire CF
Residential fire sprinklers- reference master plan (3) cf-2410125
Status: Finaled
Jul 16, 2024
Jul 3, 2024
Jul 3, 2024
Jul 3, 2024
County Fire CF
The scope of work is limited to constructing a new demise within the existing warehouse creating two spaces. one space will be for a future tenant (suite 200) and the other for pilot air freight (suite 240). no new plumbing or mechanical. t
Contractor:
NYECON INC
Status: Finaled
Jul 2, 2024
County Fire CF
Reinstallation of roof mounted pv with increase number of anchors after a wind event
Contractor:
COLLINS ELECTRICAL COMPANY INC
Status: Finaled
Jun 27, 2024
County Fire CF
Fire sprinkler design review for permit for new home construction
Contractor:
AFS SPRINKLER INC
Status: Issued
Jun 26, 2024
County Fire CF
Design and installation of a new fire sprinkler system for rack storage
Contractor:
CEN-CAL FIRE SYSTEMS INC
Status: Finaled
Jun 21, 2024
Jun 20, 2024
County Fire CF
Remove 1 duct detector and 1 rooftop unit- revision to original permit cf-2321319)
Contractor:
J - FOUR ENTERPRISES INC
Status: Issued
Jun 18, 2024
County Fire CF
Tenant interior fit of cold dark shell for preparation of future tenant fixtures, finishes, mechanical, electrical, plumbing & non bearing partitions. facade renovation and interior remodel of existing shell. renovation of main entry facade
Status: Finaled
Jun 12, 2024
County Fire CF
Installation of two 2" domestic water services and meters and one 12" private fire hydrant service to remove the two existing buildings off of their private wells that currently serve both domestic and fire protection water
Status: Issued
May 28, 2024
County Fire CF
Tenant improvement, consisting of office remodel , including demolition and construction of non-bearing partitions, reconfiguration of existing ceilinggrid and tile, relocation of existing and new light fixtures, hvac grilles, new outlets a
Status: Finaled
May 22, 2024
May 17, 2024
County Fire CF
As built fire alarm plans. original permit cf-2303589
Contractor:
FOOTHILL FIRE PROTECTION INC
Status: Finaled
May 15, 2024
County Fire CF
As-built (original permit cf-2310172) install 10 new esfr sprinkler systems in new 356.250 sf. warehouse building. system #10 includes 2 story office space. system #6-7-8-9 includes individual drops to stand alone cooler assemblies. insta
Contractor:
SHAMBAUGH & SON L P
Status: Finaled
May 14, 2024
County Fire CF
1150 sf detached adu, replacing the existing building that had been demolished several years ago at the same address 4570 perryave, single family home, 3 bedrooms 2 baths, single story
Status: Finaled
May 9, 2024
County Fire CF
As built fire alarm system plans for 4535 bldg. b-main permit cf-2303592
Contractor:
FOOTHILL FIRE PROTECTION INC
Status: Finaled
May 7, 2024
County Fire CF
Detached 1200 sq ft. adu 4 bedroom and 2 bath solar home. demolition of existing 400 sq ft detached garage. original lot address is 6101 40th street sac ca 95824
Status: Issued
May 6, 2024
County Fire CF
Installation of 11.40 kw dc st c pv solar system on rooftop- county permit number misc2024-00397
Contractor:
BARNUM & CELILLO ELECTRIC INC
Status: Finaled
Apr 25, 2024
County Fire CF
Construct 3 bedroom 2 bath 1 car garage residence
Contractor:
C & K BUILDERS
Status: Issued
Apr 16, 2024
County Fire CF
Demo (1) pendent, change out (5) sprinklers
Contractor:
WESTATES MECHANICAL CORPORATION INC
Status: Finaled
Apr 16, 2024
County Fire CF
Construct an 1203 3 bedroom 2 bath single car garage residence
Contractor:
C & K BUILDERS
Status: Issued
Apr 11, 2024
County Fire CF
Remove existing spray booth and replace with one (1) new closed top open front preparation station into an existing automotive collision repair facility - no other changes to existing building there will be a separate submittal for the fire
Contractor:
PRECISION FOR COLLISION INC
Status: Finaled
Apr 11, 2024
County Fire CF
Installation of steel storage racks
Contractor:
MATERIAL HANDLING SYSTEMS INC
Status: Finaled
Apr 9, 2024
County Fire CF
Revision- removed all relays for the rooftop units. added rooftop unit and monitor module
Contractor:
J - FOUR ENTERPRISES INC
Status: Issued
Apr 4, 2024
County Fire CF
New 1555 sf sfd 3 bed 2 bath, with 473 sf garage, 85 sf porch
Status: Finaled
Mar 28, 2024
County Fire CF
Fire alarm revision- added 3 duct detectors to original approved plans permit# cf-2227231
Contractor:
J - FOUR ENTERPRISES INC
Status: Issued
Mar 28, 2024
Mar 26, 2024
County Fire CF
High-piled storage plans with notes, site and floor plans
Status: Finaled
Mar 26, 2024
County Fire CF
2 - hanwha q.peak duo blk ml-g10+ 40 (n) solar modules(8.910 kw),
22- enphase iq8m-72-2-us(240v) (n) inverters, 2- enphase iq battery 5p (n) ess battery(10 kwh),1- enphase iq system controller 3 (n) ess mid,
1- 125a enphase ac combiner 5c
Contractor:
SEMPER SOLARIS CONSTRUCTION INC
Status: Issued
Mar 25, 2024
County Fire CF
Replace the existing automatic fire alarm system and initiaing devices while adding a cellular communicator
Contractor:
BAY ALARM COMPANY
Status: Finaled
Mar 22, 2024
County Fire CF
Subject space is 10,000 s.f. of office, converting 4,000 s.f. back to warehouse.
Contractor:
GPS COMMERCIAL CONSTRUCTION INC
Status: Finaled
Mar 22, 2024
County Fire CF
Fire sprinkler ti of existing space
Contractor:
FRONTIER FIRE PROTECTION INC
Status: Finaled
Mar 21, 2024
County Fire CF
Tenant improvement remodel, expansion into adjacent suite
Status: Finaled
Mar 13, 2024
County Fire CF
As-built plans to reflect devices onsite. original permit cf-2400435
Contractor:
BAY ALARM COMPANY
Status: Finaled
Mar 12, 2024
Mar 12, 2024
County Fire CF
As built plans- provide new sprinkler monitoring system with a common area occupant notification devices. system shall monitor all fire alarm initiating devices as indicated on the design plans including a manual pull station. original pl
Contractor:
FOOTHILL FIRE PROTECTION INC
Status: Issued
Mar 1, 2024
County Fire CF
1. demolition of existing interior non-structural partitions 2. construction of new interior non-structural partitions 3. new finishes accessibility upgrades, provide new signage at existing van accessible parking , provide new striping at
Status: Issued
Feb 28, 2024
Feb 22, 2024
County Fire CF
Installation of fire sprinklers for the proposed 3,296 sf tenant improvement.
Contractor:
WEST COAST FIRE PROTECTION SYSTEMS CO INC
Status: Finaled
Feb 21, 2024
County Fire CF
Installation of the fire sprinklers for the proposed 3,612 sf tenant improvement
Status: Finaled
Feb 21, 2024
County Fire CF
Relocation of existing manual swing gates with fence extension to enclose equipment within secure yard. no changes to driveway lanes, widths, circulation, etc.
Status: Issued
Feb 16, 2024
County Fire CF
Construction of tenant improvements including an office and restroom build out
Status: Finaled
Feb 15, 2024
County Fire CF
Building release letter-roof mount 5.39 kw pv array / 14 mods / 2 ess / new 225a msp
Status: Issued
Feb 15, 2024
County Fire CF
Tenant remodel to meet exiting requirements to include: re-working of existing equipment chain-link cages, adding exterior exit door, and replacing/adding illuminated exit signage
Contractor:
DPR CONSTRUCTION A GENERAL PARTNERSHIP
Status: Issued
Feb 13, 2024
County Fire CF
As built fire alarm plans (original permit cf-2312166)
Contractor:
SPRIG ELECTRIC CO
Status: Finaled
Feb 9, 2024
County Fire CF
Combing suite b & c. tenant interior fir tout of retail space which include but limited to the demof of previous tenant fixtures, finishes and infrastructure for preparation of new five below fixtures, finishes, mechanical, electrical plumb
Status: Finaled
Feb 8, 2024
County Fire CF
Building release letter- scope of work is to demo of two (2) walls non-bearing to open up a small room and to install a cabinet. scope of work is no more than 600 sqft.
Status: Issued
Jan 31, 2024
County Fire CF
Provide at owners request an annunciator with pull station at new office t.i. point of entry extending from existing dedicated function sprinkler monitoring system previously installed for shell. in addition to the pull & annunciator we wi
Status: Issued
Jan 30, 2024
County Fire CF
Cen cal to provide fire sprinkler system coverate in new speculative office ti area
Contractor:
CEN-CAL FIRE SYSTEMS INC
Status: Finaled
Jan 30, 2024
County Fire CF
Upgrade the existing sprinkler monitoring system in order to add a cellular communicator.
Contractor:
BAY ALARM COMPANY
Status: Finaled
Jan 23, 2024
County Fire CF
Remove and replace antenna and ground equipment
remove and replace antenna and ground equipment.
Status: Finaled
Jan 18, 2024
County Fire CF
Installation of two (2) ev charging stations (each charger can charge 2 vehicles at once). chargers and panels are all mounted on the outside wall with no penetrations inside the building. panels mounted by the main switchboard in the back
Contractor:
GUSAR ELECTRIC INC
Status: Issued
Jan 16, 2024
County Fire CF
Addition of hvac monitoring and global shut down to existing sprinkler monitoring system
Contractor:
FOOTHILL FIRE PROTECTION INC
Status: Issued
Jan 13, 2024
County Fire CF
Adding a cellular communicator to the existing sprinkler monitoring system as the single path means of alarm transmission.
Contractor:
BAY ALARM COMPANY
Status: Issued
Jan 12, 2024
County Fire CF
Building release letter- new free standing detached deck with patio cover over top 625 feet
Status: Issued
Jan 10, 2024
County Fire CF
New fire alarm devices in new ti. new fire alarm equipment will connect into the existing fire alarm control panel.
Contractor:
NORTH STATE ELECTRICAL CONTRACTORS INC
Status: Finaled
Jan 5, 2024
County Fire CF
Revision submittal to cf-2310239- provide sprinkler protection in the warehouse, trailer maintenance bldg., and pump house. the warehouse will be supplied by (8) reaction risers, (4) dry risers, and (6) wet risers. the trailer maintenance b
Contractor:
SHAMBAUGH & SON L P
Status: Issued
Jan 3, 2024
County Fire CF
New fire alarm devices in new ti. new fire alarm equipment will connect into the existing fire alarm control panel
Contractor:
NORTH STATE ELECTRICAL CONTRACTORS INC
Status: Finaled
Jan 3, 2024
County Fire CF
Changes include updated details, revised owner equipment layout, revised details, updated bollard placement, etc. some items have shifted, a few items have been removed and a handful have been added
Contractor:
RYAN COMPANIES US INC
Status: Issued
Jan 2, 2024
Dec 27, 2023
County Fire CF
Conversion of portion of unconditioned warehouse space into conditioned office space. including expansion of men's and women's restroom and partial remodel of existing office space.
Status: Finaled
Dec 15, 2023
County Fire CF
Tenant improvement permit for new walk-in freezer and cooler in the existing clubhouse
Status: Finaled
Dec 15, 2023
County Fire CF
New spec office ti- new interior walls, new lighting, new rooftop hvac, new bathrooms, new fixtures and finishes
Contractor:
DEACON CONSTRUCTION LLC
Status: Issued
Dec 15, 2023
County Fire CF
New spec office. ti new interior walls, new lighting, new rooftop hvac, new bathrooms, new fixtures and finishes
Contractor:
DEACON CONSTRUCTION LLC
Status: Issued
Dec 15, 2023
County Fire CF
Addition of hvac monitoring and global shut down to existing sprinkler monitoring system
Contractor:
FOOTHILL FIRE PROTECTION INC
Status: Issued
Dec 13, 2023
County Fire CF
Building release letter. approval needed by the city of sacramento fire department for the solar plans related to this new construction project. solar plans have already been approved by smud.
Status: Issued
Dec 4, 2023
County Fire CF
1) revisions to approved plans cf-2317108 2) (20) replace existing esfr sprinkler heads at the roof above ti space to new cmda sprinkler heads due to new r-30 insulation at the roof
Contractor:
J - FOUR ENTERPRISES INC
Status: Issued
Nov 29, 2023
County Fire CF
1) revisions to approved plans cf-2317102 2) (20) replace existing esfr sprinkler heads at the roof above ti space to new cmda sprinkler heads due to new r-30 insulation at the roof
Status: Issued
Nov 29, 2023
County Fire CF
Installation of protection wire for the pre-action systems in the racking installation.
Contractor:
SHAMBAUGH & SON L P
Status: Issued
Nov 16, 2023
County Fire CF
Update fire damper to fire and smoke damper at pump room, per iinspector's comment
Contractor:
DEACON CONSTRUCTION LLC
Status: Finaled
Nov 15, 2023
County Fire CF
Revisions to cf-2202100 revisions include revised exiting plan. update
fence & gate. update concrete scoring line at the entry hardscape. sac county# cbnc2022-00012 &+8
Status: Finaled
Nov 14, 2023
County Fire CF
Provide new duct detector at fire smoke damper with remote test switch
Status: Issued
Nov 9, 2023
County Fire CF
County permit# cbac2022-00793 ch02-revisions to cf-2313180 tenant improvement--- revisions include
addition of bench in shower area, addition of 5 dock levelers and
warehouse lighting.updated path of travel and egress plan.
Status: Issued
Nov 8, 2023
County Fire CF
Building release letter- construction of a speculative office tenant improvement in existing shell building a. work to include but not limited to offices, toilet rooms, and coffee bar. fire sprinklers and fire alarm under separate permit.
Status: Issued
Nov 7, 2023
County Fire CF
Demo of interior doors, cabinetry, and non-load bearing and non-structural interior walls.construction of new interior non-structural partitions, new millwork, new electrical outlets new led lighting. relocate existing mechanical registers.
Contractor:
ETHAN CONRAD CONSTRUCTION INC
Status: Finaled
Nov 7, 2023
County Fire CF
Revision to cf-2317755 -all single row rack elevations are being reprofiled to account for sprinkler piping by the ti sprinkler contractor
Status: Issued
Nov 7, 2023
County Fire CF
Submittal for storefront system with translucent entry canopies
Status: Issued
Nov 3, 2023
County Fire CF
Building release letter-site work to install two new stationary outdoor load banks. no interior work. sac county# cbnc2023-00318
Contractor:
DPR CONSTRUCTION A GENERAL PARTNERSHIP
Status: Issued
Nov 1, 2023
County Fire CF
Installation of an emergency responder radio communication system within target fdc 3712
Status: Issued
Nov 1, 2023
County Fire CF
Construction of a new 600 sqft adu including: site works, foundation, framing, roofing, mechanicals, exterior and interior finishes, and completion.
Contractor:
RWFC INC
Status: Issued
Nov 1, 2023
Oct 25, 2023
County Fire CF
Construction of approx. 13,000 sf new office area with private offices, open office, conference rooms, break rooms, restrooms, and other associated rooms. construction of approx. 2,500 sf separate warehouse employee brearoom and restrooms.
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Finaled
Oct 25, 2023
County Fire CF
Building release letter-demolition of existing sports field and court lighting and associated wiring and installing new sports lights for the field and the basketball court. then connecting the new lighting to the lighting controller
Status: Issued
Oct 24, 2023
County Fire CF
1) relocate existing and add new fire sprinkler heads at the roof due to new full height walls to maintain proper coverage and spacing.. 2) replace fire sprinkler heads at the roof above the ti space from esfr pendents to standard spray pen
Contractor:
J - FOUR ENTERPRISES INC
Status: Finaled
Oct 24, 2023
Oct 24, 2023
County Fire CF
Remove existing fire sprinkler pendant heads for the removal of the existing ceiling. relocate existing pendant head ffor the new wall. new pendant heads will be chrome recessed heads. if the ceiling is removed and replaced in the office a
Contractor:
FOOTHILL FIRE PROTECTION INC
Status: Finaled
Oct 24, 2023
County Fire CF
Proposed construction of one (1) building approximately 372,000 sf total with future expansion totaling 104,000 sf, including loading docks, parking, drive aisles,perimeter landscaping and street lighting along lone tree road. total develop
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Issued
Oct 18, 2023
Oct 17, 2023
County Fire CF
Review of site fencing and gates for a food distribution center
Contractor:
RYAN COMPANIES US INC
Status: Issued
Oct 13, 2023
County Fire CF
The primary electric fire pump is fed by a 300,000 gallon water storage tank. the secondary diesel fire pump will be fed by city water. the fire pumps will provide water for sprinkler protection in the warehouse, trailer maintenance buildin
Contractor:
SHAMBAUGH & SON L P
Status: Finaled
Oct 9, 2023
County Fire CF
County submittal: cbnc 2023-00279 - installation of 6'0" high chain link fence, (2) 20'0" wide electric sliding gates, with 10'0" counterbalance, (2) 3'0" wide pedestrian gate with knox box, fast track review approved with sac county build
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Finaled
Oct 4, 2023
County Fire CF
Building release letter- construction of approx. 13,000 sf new office area with private offices, open office, conference rooms, break rooms, restrooms, and other associated rooms. construction of approx. 2,500 sf separate warehouse employee
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Issued
Sep 29, 2023
County Fire CF
Building release letter-the installation of the electrical for the building of a single story 235,894 sq. ft. warehouse and site
Contractor:
VASKO ELECTRIC INC
Status: Issued
Sep 26, 2023
County Fire CF
Install 876 linear feet of high piled racks with 12' and 18' high racks
Contractor:
BIG JOE CALIFORNIA NORTH INC
Status: Finaled
Sep 26, 2023
County Fire CF
Install new sole path cell communicator on existing sprinkler monitoring system
Contractor:
SONITROL OF SACRAMENTO LLC
Status: Finaled
Sep 21, 2023
County Fire CF
Fire alarm shell
Status: Finaled
Sep 19, 2023
County Fire CF
New duplex addition to existing single family residence, no fire sprinklers
Status: Issued
Sep 15, 2023
County Fire CF
Building release letter-cold storage portion of previously approved project. shell was approved under cf-2222200&t.i: cf-2227246. shell included all applicable fire life safety items related to the cold storage.
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Issued
Sep 13, 2023
County Fire CF
Removing and replacing existing generator and concrete generator pad with new 40kw diesel generator with new 360 gallon tank on new 10' x 5' concrete pad. remove and replace existing 200a electrical panel with new 200a ilc. install (1) new
Status: Issued
Sep 12, 2023
County Fire CF
County#misc2023-00847-redundant fuel system line to each of the existing generators to provide fuel supply in the event of a catastrophic event and installing new electrical to upgraded fuel system controller and isolation valves.
Contractor:
DPR CONSTRUCTION A GENERAL PARTNERSHIP
Status: Finaled
Sep 11, 2023
County Fire CF
All changes are clearly indicated with clouding and deltas on uploaded documents and a narrative has been provided to indicate al changes per drawing sheet. changes include, updated details, revised owner equipment layout, revised door spe
Contractor:
RYAN COMPANIES US INC
Status: Finaled
Sep 1, 2023
County Fire CF
Adding an awning to existing building entrance to help with storm protection
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Issued
Aug 31, 2023
County Fire CF
Installation of new visual and audio visual notification appliances throughout the area of work to meet proper coverage per nfpa 72 requirements due to tenant improvement work. reference sheet fa-301 floor plan for the exact locations
Contractor:
H C I SYSTEMS INC
Status: Finaled
Aug 31, 2023
County Fire CF
Provide new dedicated function sprinkler monitoring system in its entirety for building 8 warehouse. warehouse is a cold shell with no occupants & no hvac.
Status: Issued
Aug 31, 2023
County Fire CF
Provide additions to existing fire alarm control system for purpose of five below retail store hvac monitoring and control. provide new hvac zone connections to duct smoke detectors. provide new zone connections to hvac shutdown relays.
Status: Issued
Aug 30, 2023
County Fire CF
Nstallation of storage racking only inside warehouse. no sprinkler, electrical or building structural modifications included in scope. this permit relates to overall tenant improvement project under permit cf-2313499 please reference any a
Contractor:
WIZE SOLUTIONS INC
Status: Finaled
Aug 28, 2023
County Fire CF
Provide sprinkler protection in the warehouse, trailer maintenance bldg, and pump house. the warehouse will be supplied by (8) preaction risers, (4) dry risers, and (6) wet risers. the trailer maintenance bldg. will be supplied by (1) wet r
Contractor:
SHAMBAUGH & SON L P
Status: Issued
Aug 28, 2023
County Fire CF
Prefabricated canopy for project shaver, main project number cbnc2022-00377. this application is for the prefabricated canopy for the guardhouse, permit number cbnc2022-00386. the permit number for this specific canopy is cbnc2023-00244. th
Contractor:
RYAN COMPANIES US INC
Status: Issued
Aug 23, 2023
County Fire CF
Installation of conveyor within an existing building
Status: Finaled
Aug 22, 2023
County Fire CF
(14) new sprinklers at ceiling in new ti
Contractor:
J - FOUR ENTERPRISES INC
Status: Issued
Aug 22, 2023
County Fire CF
(14) new sprinklers at ceiling in new ti
Contractor:
J - FOUR ENTERPRISES INC
Status: Issued
Aug 22, 2023
County Fire CF
Tenant improvement scope to include reconfiguratio of existing care center with changes tointerior partitions, doors, ceiling, associated finished and utilities.
Status: Issued
Aug 18, 2023
County Fire CF
Install underground fire utilities for the 4525 and 4535 elkhorn blvd. we are in need of an underground inspection on the fire lines that have not been installed due to a conflict with the stair footings in the loading docks. we have prov
Status: Issued
Aug 10, 2023
County Fire CF
Project involves developing of a sanctioned homeless encampment. 33-one person cabins with electrical service. 11-two person cabins with electrical services, office trailer, all gender restrooms, and breakfast bar. shower restroom, ada re
Status: Finaled
Aug 10, 2023
County Fire CF
Convert garage into junior adu, convert existing storage into adu, and structural design as-built storage
county# cbnr2023-00237
Status: Issued
Aug 10, 2023
County Fire CF
Cen-cal install 8 (n) esfr fire sprinkler systems and 1 (n) diesel fire pump
Contractor:
CEN-CAL FIRE SYSTEMS INC
Status: Issued
Aug 10, 2023
County Fire CF
Remove (e) swing gate and replace with electrically-operated sliding (rolling) gate, verify compliance of existing gate operator and electrical service, no work at existing compliant accessible parking no work in existing structures
Contractor:
ETHAN CONRAD CONSTRUCTION INC
Status: Finaled
Aug 9, 2023
County Fire CF
Building release letter-retaining wall: 5620 martin luther king blvd. a permit to allow an additional masonry wall to an existing cmu walls along the northern and western property lines of a vacant property on 0.64 acres in the lc zone loca
Status: Issued
Aug 3, 2023
County Fire CF
Demo of interior doors, cabintry, and non-load bearing and non-structural interior walls. construction of new interior non-structural partitions, new millwork, new electrical outlets, new led lighting. relocate existing mechanical registe
Contractor:
ETHAN CONRAD CONSTRUCTION INC
Status: Issued
Aug 2, 2023
County Fire CF
Erection of roll-form steel racking in existing warehouse- county project: cbac2021-00591
Status: Finaled
Aug 1, 2023
County Fire CF
We are installing a perimeter fence to secure the parking areas outside of the amazon smf6 facility. there will be one location with swing arm gates. nearest the building main entrance (further set west untrace along albaugh dr.) t this l
Contractor:
CLAYCO INC
Status: Issued
Jul 24, 2023
County Fire CF
New networked campus fire alarm sy
Status: Finaled
Jul 20, 2023
County Fire CF
1715 sf tenant improvement in 109.300 sf warehouse building. fire alarm submittal
Status: Finaled
Jul 3, 2023
County Fire CF
Install 8.874 linear feet or 90,000 sf of high piled storage racks
Contractor:
BIG JOE CALIFORNIA NORTH INC
Status: Finaled
Jun 29, 2023
County Fire CF
Installation of (2) level 2 electric vehicle chargers with dual handles, 40 amp 240v and (2) quick disconnect safety switches inside warehouse for fleet use.
Contractor:
AVAIL SERVICES INC
Status: Issued
Jun 27, 2023
County Fire CF
Replace 35 heads to roof due to new r-30 belt insulation. install 19 new heads at ceiling. install 5 new heads at roof to maintain proper spacing near the new full height wall
Contractor:
J - FOUR ENTERPRISES INC
Status: Finaled
Jun 27, 2023
County Fire CF
Installing ev charging stations for electric vehicle char
Contractor:
PHE INC
Status: Issued
Jun 23, 2023
County Fire CF
Interior modernization of existing space was a dental clinic. space will be converted to a sunday school
Status: Finaled
Jun 21, 2023
County Fire CF
Changes include updated details, revised owner equipment layout, revised door specs, updated bollard placement etc. many items have shifted, a few items have been removed and a handful have been added
Contractor:
RYAN COMPANIES US INC
Status: Issued
Jun 21, 2023
County Fire CF
Construction of (n) office area with private offices, open office, break room and (2) multi user restrooms and (2) all gender restrooms. (n) demising wall between office and warehouse. associated mechanical, plumbing and electrical work (
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Finaled
Jun 15, 2023
County Fire CF
Construction of (n) office area with private offices, open office, break room, (2) multi-user restrooms and (2) all gender restrooms. (n) demising wall between office and warehous, associaed mechanical, plumbing and elecrrial work, (n) pit
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Finaled
Jun 15, 2023
County Fire CF
Construciton of (n) office area with private offices, open office, break room, (2) multi-user restrooms and (2) all gender restrooms. (n) demising wall between office and warehouse. associated mechanical, plumbing and electrical work. (n)
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Finaled
Jun 12, 2023
County Fire CF
Installation of a 6.46 w photovoltaic system mpy and (1) 10kwh enphase encharge battery
Contractor:
ADT SOLAR LLC
Status: Issued
Jun 7, 2023
County Fire CF
Provide sprinkler protection in the warehouse, trailer maintenance bldg, and pump house. the warehouse will be supplied by (8) preaction risers, (4) dry risers, and (6) wet risers. the trailer maintenance bldg. will be supplied by (1) wet r
Contractor:
SHAMBAUGH & SON L P
Status: Issued
Jun 7, 2023
Jun 6, 2023
County Fire CF
Construction of tilt up industrial building- seeking approval for architectural and structural plans. civil plans are provided for reference but are being reviewed under a separate permit submittal. mechanical, plumbing fire sprinkler, and
Status: Issued
Jun 1, 2023
County Fire CF
(16) new sprinklers at ceiling in new ti (6) relocate sprinklers at roof to maintain proper spacing (9) new sprinklers at roof to maintain proper sprinkler coverage
Contractor:
J - FOUR ENTERPRISES INC
Status: Issued
May 31, 2023
County Fire CF
(16) new sprinklers at ceiling in new ti (6) relocate sprinklers at roof to maintain proper spacing (11) new sprinklers at roof in warehouse and above ti to maintain proper sprinkler coverage
Contractor:
J - FOUR ENTERPRISES INC
Status: Issued
May 31, 2023
County Fire CF
(16) new sprinklers of ceiling in new ti (30) replace heads at roof above the ti due to new r-30 insulation (6) new sprinklers at roof to maintain proper sprinkler coverage
Contractor:
J - FOUR ENTERPRISES INC
Status: Issued
May 31, 2023
County Fire CF
Build new chain link enclosure around a section of existing parking lot to provide security for caltrans vehicles. enclosure will include six electric vehicle charge stations (evcs). evcs are not available to the public. enclosure does no
Status: Finaled
May 31, 2023
County Fire CF
Install 10 new esfr sprinkler systems in new 356,250 sf warehouse building. system #10 includes 2 story office space. system #6-7-8-9 includes individual drops to stand alone cooler assemblies install new sprinkler system for remote 6,988
Contractor:
SHAMBAUGH & SON L P
Status: Finaled
May 30, 2023
County Fire CF
Installation of drinking fountain, bleachers, ev chargers and associated conduite, wire and electrical controller cabinet
Status: Issued
May 26, 2023
County Fire CF
Installation of a large (00288) and a small (00287) shade structures with led lighting (one permit per structure). the large structure will include a solar array on the roof and assocaited conduit, wire, and electrical controller/cabinet.
Status: Issued
May 26, 2023
County Fire CF
New single family, porch and garage
Status: Finaled
May 24, 2023
May 19, 2023
County Fire CF
Replace 20 heads at roof due to new r-30 batt insulation. install 13 new heads at ceiling in new tenant improvement space
Contractor:
J - FOUR ENTERPRISES INC
Status: Finaled
May 19, 2023
County Fire CF
Install one (1) new 225a, 600v breaker on 480v main service- install one (1) new 400a ac disconnect fusible at 225a. install one (1) new 150kva transformer 480v-208/1204. install one (1) new 600a, 208/120v, 3ph, 4w distribution panel "ev-l
Contractor:
E V INFRASTRUCTURE LLC
Status: Finaled
May 17, 2023
County Fire CF
New single family, porch and garage
Status: Finaled
May 11, 2023
County Fire CF
New single family, porch and garage
Status: Finaled
May 11, 2023
County Fire CF
New single family, porch and garage
Status: Finaled
May 11, 2023
County Fire CF
New single family, porch and garage
Status: Finaled
May 11, 2023
County Fire CF
New single family, porch and garage
Status: Finaled
May 11, 2023
County Fire CF
Replacement of owner provided generator and after treatment systems, installation of associated urea pipiing and exhaust, relocation of electrical and structural components to accommodate new equipment layout. one fire alarm strobe will be
Contractor:
DPR CONSTRUCTION A GENERAL PARTNERSHIP
Status: Finaled
May 4, 2023
County Fire CF
New single family, porch and garage
Status: Finaled
May 2, 2023
County Fire CF
Construction of (n) office area with private offices, open office, break room and 2 multi user restrooms and 2 all gender restrooms, demising wall between office and warehouse, associated mechanical, plumbing, electrical, fire sprinkler and
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Finaled
May 2, 2023
County Fire CF
During another final on the ti space, the inspector asked us to add one horn strobe on the outside wall of the ti due to the added demising wall added device shown on sheet fa4.1.1
Contractor:
REX MOORE GROUP INC
Status: Issued
May 1, 2023
County Fire CF
Replace 36 heads at roof due to new r-30 batt insulation. install 18 new heads at ceiling. install new branchline with 5 new heads at roof to maintain sprinkler coverage near new full height walls. relocate existing branchline with 5 head
Contractor:
J - FOUR ENTERPRISES INC
Status: Issued
Apr 27, 2023
County Fire CF
New single family, porch and garage
Status: Finaled
Apr 24, 2023
Apr 21, 2023
County Fire CF
Upgrading fire monitoring/ life safety system to encompass the warehouse work area. additional horn/ strobe warning devices per code
Contractor:
PREMIERE PLUS CORP
Status: Finaled
Apr 18, 2023
County Fire CF
Fire sprinkler tenant improvement
fire sprinkler tenant improvement
Contractor:
SYSTEMS TECH INC
Status: Issued
Apr 14, 2023
County Fire CF
High piled combustible storage submittal
Status: Finaled
Apr 11, 2023
County Fire CF
All changes are clearly indicated with clouding and deltas an uploaded documents and a "list of changes" has been provided to indicate changes per drawing sheet changes include updated details, compactor and drive in ramp shift, relocated b
Contractor:
RYAN COMPANIES US INC
Status: Finaled
Mar 28, 2023
County Fire CF
Converting to a sprinkler monitoring system
Status: Issued
Mar 23, 2023
County Fire CF
Fire alarm-provide new sprinkler monitorng system with a common area occupant notification device system shall monitor all fre alarm initating devices as indicated on the desgn plans including a manual pull station and equipment smoke detec
Contractor:
FOOTHILL FIRE PROTECTION INC
Status: Finaled
Mar 23, 2023
County Fire CF
Provide new sprinkler monitoring system wth a common area occupant notification devce system shall monitor all fire alarm initiating devces as indcated on the design plans including a manual pull station and equipment smoke detector
Contractor:
FOOTHILL FIRE PROTECTION INC
Status: Finaled
Mar 22, 2023
County Fire CF
Revision- proposed construction of one main guilding
Status: Finaled
Mar 14, 2023
County Fire CF
Install storage racking in existing warehouse
Status: Finaled
Mar 14, 2023
County Fire CF
Install underground fire utilities for the 4525 & 4535 elkhorn blvd. project. we are needing underground fire inspection.. fire inspection fee paid on permit cf-2210097
Status: Finaled
Mar 13, 2023
County Fire CF
Replace 30 heas at roof due to new r-30 batt insulation. install 19 new heas at ceiling
Contractor:
J - FOUR ENTERPRISES INC
Status: Finaled
Mar 10, 2023
County Fire CF
Install 17 silfab 380 roof mounted pv panels 6.46 kw, 1 backup battery enphase encharge. derate main breaker from 200a to 175a
Contractor:
ADT SOLAR LLC
Status: Issued
Mar 10, 2023
County Fire CF
Building release letter infill of exterior truck dock to create a new height
Contractor:
RCD Contractin, Inc.
Status: Issued
Mar 8, 2023
County Fire CF
252 st. detached adu addition
Status: Issued
Mar 7, 2023
Mar 2, 2023
County Fire CF
New shell spec warehouse- 7200 metro air parkway sac ca 95835
Status: Issued
Feb 28, 2023
County Fire CF
Changing a 3 car garage into a 1200 sq. ft. 3 bed 2 bath home
Status: Issued
Feb 27, 2023
County Fire CF
Adu garage conversion adding 2 bathrooms and one diving wall in middle of garage adding smoke and carbon monoxide alarms
Status: Issued
Feb 27, 2023
County Fire CF
(3) new esfr 16.8 k sprinkler systems w/ 1500 gpm at 104 psi diesel fire pump
Contractor:
J - FOUR ENTERPRISES INC
Status: Withdrawn
Feb 23, 2023
County Fire CF
Onsite improvement include one industrial building , with associated truck docks, parking areas, and drive aisles. offsite improvements include road widening and sidewalk installation , utility relocation, and construction of new east leg
Status: Issued
Feb 21, 2023
County Fire CF
Area: r07: solar : solar (pv + battery) - 4941 j pkwy. (residential) 5.2kw rooftop pv system and 12.6kwh battery storage system.
Contractor:
MARTY SNYDER CONSTRUCTION
Status: Finaled
Feb 20, 2023
County Fire CF
Proposed construction of one (1) approximately 372,000 sf total with future expansion totaling 104,000 sf, including loading docks, parking, drive aisles, perimeter landscaping and street lighting along lone tree road total development0 25
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Finaled
Feb 13, 2023
County Fire CF
Relocate detectable warning paths to match the exact edge of the pedestrian transition. add striping to stairway treads. amend handrail extensions. secure doormat
Status: Issued
Feb 10, 2023
County Fire CF
Proposed construction of one main building approx. 525,000 sf with smaller support structures, loading docks, parking, drive isles, perimeter landscaping, and street lighting along metro air parkway- total site acreage = 75
Contractor:
RYAN COMPANIES US INC
Status: Finaled
Feb 8, 2023
County Fire CF
This project consists of a 236,721 sf warehouse distribution facility and associated site work including, but no limited to grading, drainage, and underground improvements
Status: Issued
Feb 7, 2023
County Fire CF
This tenant is adding a sprinkler fire monitoring device for their rack fire sprinkler system. the fire sprinkler monitoring device will be added to the existing fire monitoring system.
Contractor:
PREMIERE PLUS CORP
Status: Finaled
Feb 3, 2023
County Fire CF
Proposed construction of one building approximately 145,180 sf with loading docks, parking, drive aisles, perimeter landscaping and street lighting along sky king road total development= 7.76 acres
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Finaled
Jan 30, 2023
County Fire CF
Proposed construction of one building approximately 110,525 sf with loading docks, parking, drive aisles, perimeter landscaping and street lighting along metro air parkway total development -7.37 acres
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Finaled
Jan 30, 2023
County Fire CF
Proposed construction of approximately 30,000 sf office and various warehouse improvements
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Finaled
Jan 27, 2023
County Fire CF
(4) new esfr 16.8k sprinkler systems
Contractor:
J - FOUR ENTERPRISES INC
Status: Finaled
Jan 27, 2023
County Fire CF
Installation of new (1) 1o645gd facp (1) bps 10a-7 booster power supply- 1(cellular alarm communicator, located inside the electrical and mpoe room at the first floor in each building 1,2,3,4,5,6,7,8,9 to include the following components no
Contractor:
H C I SYSTEMS INC
Status: Issued
Jan 27, 2023
County Fire CF
Site upgrades to include (6) ev charging stations, new electrical to accommodate new parking layout. no fire sprinkler or fire alarm work.
Status: Issued
Jan 24, 2023
County Fire CF
As built drawings required to submit for approval
Contractor:
H C I SYSTEMS INC
Status: Issued
Jan 20, 2023
County Fire CF
Install fire sprinklers in bathroom
Status: Issued
Jan 19, 2023
County Fire CF
Proposed construction of one building approximately 95,099 sf with loading docks, parking drive aisles, perimeter landscaping and street lighting along sky king road and metro air parkway. total development- 6,60 acres
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Finaled
Jan 17, 2023
County Fire CF
Main permit-proposed construction of approximately 356,000 sf warehouse and 8000 sf service garage
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Finaled
Jan 17, 2023
County Fire CF
Proposed construction of three (3) total buildings approximately 351,000 sf for little dipper, including loading docks, parking, drive aisles, and perimeter landscaping total development - 22 acres
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Issued
Jan 13, 2023
County Fire CF
The proposed improvement shall widen metro air parkway (west side) and skyking rd. from skyking rd. to the big dipper north property line ( a total of about 3060 lf of roadway widening)
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Issued
Jan 13, 2023
County Fire CF
Tenant, exterior, and site improvements to include the following: 1. (n) tenant improvement work on interior to include demolition and new walls, ceilings for (n) offices, reception and two all-gender r.r. facilities. 2. (n) exterior wor
Contractor:
ADAIR GENERAL CONSTRUCTION
Status: Finaled
Jan 12, 2023
County Fire CF
Add new esfr 16.8k sprinklers at the roof along new demising wall t maintain proper coverage
Contractor:
J - FOUR ENTERPRISES INC
Status: Finaled
Jan 11, 2023
County Fire CF
(3) new esfr 16.8k sprinkler systems w/ 1500 gpm at 104 psi diesel fire pump
Contractor:
J - FOUR ENTERPRISES INC
Status: Finaled
Jan 11, 2023
County Fire CF
(3) new esfr 16.8k sprinkler systems
Contractor:
J - FOUR ENTERPRISES INC
Status: Finaled
Jan 10, 2023
Jan 5, 2023
County Fire CF
Cen-cal to install 5(n) esfr fire sprinkler systems and 1 (n) diesel fire pump
Contractor:
CEN-CAL FIRE SYSTEMS INC
Status: Finaled
Jan 4, 2023
County Fire CF
Cen-cal to install 3 (n) esfr fire sprinkler systems and 1 (n) diesel fire pump
Contractor:
CEN-CAL FIRE SYSTEMS INC
Status: Finaled
Jan 4, 2023
County Fire CF
Convert +/- 806 st. living space into attached adu in new cabinet, installation new stove over existing countertop is the only construction to occur in this permit or project cap of hvac duct to storage area
Status: Issued
Dec 30, 2022
County Fire CF
Regrading the site adding parking area, sidewalk, landscape with a new storm drain system to improve the site drainage system in compliance with city of sacramento drainage standards
Status: Issued
Dec 20, 2022
County Fire CF
(14) new esfr 25.2 k sprinkler systems w/ 2000gpm at 165 psi diesel fire pump
Contractor:
J - FOUR ENTERPRISES INC
Status: Finaled
Dec 5, 2022
County Fire CF
Installation of new sprinkler monitoring panel to separate adjacent building panel
Contractor:
INTEGRATED FIRE SYSTEMS INC
Status: Finaled
Nov 21, 2022
County Fire CF
Building release letter issued- install keeguard post to roof with metal place and bolts- install freestanding non-roof penetrating keepguard guardrail to the roof- install hoist to face of wall parapet with galvanized steel plate
Status: Issued
Nov 17, 2022
County Fire CF
Resubmital for fire correction notice for roof mount pv system fire access ramps. ramp locations are now
Status: Finaled
Nov 16, 2022
County Fire CF
To add new wp horn strobes outside the cell processing area in the corridors and one(1) wall mounted wp horn strobe outside the main electrical room. remove existing fire alarm monitoring devices from the osy-piv. these are being monitored
Contractor:
H C I SYSTEMS INC
Status: Finaled
Nov 16, 2022
Nov 9, 2022
County Fire CF
Building release letter- replace damaged roof beams, adding steel columns and footing support at new to existing glb transition.
Contractor:
REGIONAL BUILDERS INC
Status: Finaled
Nov 4, 2022
County Fire CF
A. nstalling a new remote annunciator at the entrance of the tenant improvement space.
a. nstalling a new remote annunciator at the entrance of the tenant improvement space.
check spelling
c. installing one manual fire alarm box at
Contractor:
REX MOORE GROUP INC
Status: Finaled
Nov 3, 2022
County Fire CF
A. installing a new remote annunciator at the entrance of the tenant improvement space. b. installing one 15 candela ceiling horn strobe within the tenant improvement space. c. installing one manual fire alarm box at the entrance of the ten
Contractor:
REX MOORE GROUP INC
Status: Issued
Nov 3, 2022
County Fire CF
Addition of steel pallet racking in existing warehouse- county project# cbac2021-00590
Status: Finaled
Nov 2, 2022
County Fire CF
High pile storage
Status: Finaled
Nov 2, 2022
County Fire CF
Building release letter demo of existing observation window for replacement of double doors for additional acces to chiller room. no fire sprinkler or fire alarm work
Status: Issued
Nov 2, 2022
County Fire CF
Replacement of two vehicle gates, miscellaneous electrical and structural as needed. no fire sprinkler or fire alarm work
Status: Finaled
Oct 20, 2022
County Fire CF
Convert 245 sf of warehouse into (2) each 10 x 11 private offices
Contractor:
GPS COMMERCIAL CONSTRUCTION INC
Status: Finaled
Oct 20, 2022
County Fire CF
One powewall moved outside equipment relocated- revision to county permit misr022-03186
Contractor:
TESLA ENERGY OPERATIONS INC
Status: Finaled
Oct 18, 2022
County Fire CF
New 16.8 esfr sytems with 1500 gpm diesel fire pump
Contractor:
J - FOUR ENTERPRISES INC
Status: Finaled
Oct 18, 2022
County Fire CF
Fire alarm installation- fire inspection fee deferred and paid on cf-2212935
Contractor:
J - FOUR ENTERPRISES INC
Status: Finaled
Oct 14, 2022
Oct 13, 2022
County Fire CF
Commercial racking
Status: Finaled
Oct 11, 2022
County Fire CF
Construction of tenant improvement, including warehouse and restroom. includes mep, fire sprinkler, structural and architectural design elements.
Status: Finaled
Oct 4, 2022
County Fire CF
Removed mhe piping from original plans- revisions to approved plans cf-2118429
Contractor:
J - FOUR ENTERPRISES INC
Status: Issued
Sep 28, 2022
County Fire CF
Install 2 dual -port level 2 ev charging stations in the parking lot
Status: Issued
Sep 28, 2022
County Fire CF
Dish wireless collocation at existing wireless facility. install tower equipment and ground equipment
Status: Issued
Sep 27, 2022
County Fire CF
Provide new dedicated function sprinkler monitoring system in its entirety for bldg. 3 warehouse. warehouse is a cold shell with no occupants & no hvac.
Status: Finaled
Sep 27, 2022
County Fire CF
Fire alarm panel replacement
Contractor:
WESTERN STATES FIRE PROTECTION COMPANY
Status: Issued
Sep 23, 2022
County Fire CF
Building shell fire alarm install
Contractor:
J - FOUR ENTERPRISES INC
Status: Issued
Sep 21, 2022
County Fire CF
Civil/improvement plans reviewed-proposed construction of one main building approximately 524,000 sf with smaller support structures, loading docks, parking, drive aisles, perimeter landscaping, and street lighting along metro air parkway.
Status: Finaled
Sep 21, 2022
Sep 20, 2022
County Fire CF
Construction of tenant improvements. including warehouse office and restroom. includes mep, fire sprinkler, structural and architectural design elements. slso includes construction of demising wall
Status: Finaled
Sep 16, 2022
County Fire CF
Foothill fire protection, inc. (ffp) to design and install 6 new west fire sprinkler systems in warehouse building. systems to include a diesel fire pump which is located in the building. an esfr system is being proved for all 6 systems-
Contractor:
FOOTHILL FIRE PROTECTION INC
Status: Issued
Sep 12, 2022
County Fire CF
Foothill fire protection, inc (ffp) to design and install 6 new wet fire sprinkler systems in new warehouse building. systems to include a diesel fire pump which is located in the building. an esfr system is being proved for all 6 systems
Contractor:
FOOTHILL FIRE PROTECTION INC
Status: Issued
Sep 12, 2022
County Fire CF
Foothill fire protection, inc. (ffp) to design and install 6 new wet fire sprinkler systems in new warehouse building. systems to include a diesel fire pump which is located in the building. an esfr system is being proved for all systems.
Contractor:
FOOTHILL FIRE PROTECTION INC
Status: Issued
Sep 12, 2022
County Fire CF
Foothill fire protection, inc. (ffp) to design & install 6 new wet fire sprinkler systems in new warehouse building. systems to include a diesel fire pump which is located in the building. an esfr system is being proved for all 6 systems.
Contractor:
FOOTHILL FIRE PROTECTION INC
Status: Issued
Sep 12, 2022
County Fire CF
Foothill fire protection, inc. (ffp) to design & install 6 new wet fire sprinkler systems in new warehouse building. systems to include a diesel fire pump which is located in the building. an esfr system is being proved for all 6 systems.
Contractor:
FOOTHILL FIRE PROTECTION INC
Status: Issued
Sep 12, 2022
County Fire CF
Foothill fire protection, inc. (ffp) to design & install 6 new wet fire sprinkler systems in new warehouse building. systems to include a diesel fire pump which is located in the building. an esfr system is being proved for all 6 systems.
Contractor:
FOOTHILL FIRE PROTECTION INC
Status: Issued
Sep 12, 2022
County Fire CF
Foothill fire protection, inc. (ffp) to design & install 6 new wet fire sprinkler systems in new warehouse building. systems to include a diesel fire pump which is located in the building. an esfr system is being - proved for all 6 systems
Contractor:
FOOTHILL FIRE PROTECTION INC
Status: Issued
Sep 12, 2022
County Fire CF
Provide new sprinkler monitoring system with a common area occupant notification device. system shall monitor all fire alarm initiating device as indicated on the design plans including a manual pull station and equipment smoke detector.
Status: Issued
Sep 12, 2022
County Fire CF
Foothill fire protection, inc. (ffp) to design and install 6 new wet fire sprinkler systems in new warehouse building. systems to include a diesel fire pump which is located in the building. an esfr system is being proved for all 6 system
Contractor:
FOOTHILL FIRE PROTECTION INC
Status: Issued
Sep 12, 2022
County Fire CF
The northlake elementary school project contains the construction of a new
tk-8 grade elementary school in the new master
planned community of northlake. the school campus contains (8) new buildings on approximately 16.8 acres and (1) c
Status: Issued
Sep 9, 2022
County Fire CF
Interior tenant improvement consisting of demolition of non-load bearing partitions, reconfiguration of existing ceiling grid and tile, relocation of existing and new light fixtures. hvac grilles, new outlets and new finishes. the existin
Status: Finaled
Sep 9, 2022
County Fire CF
Building plans-proposed construction of one building approximately 108,000 sf with loading docks. parking, drive aisles, perimeter landscaping total development = 6.2 acres
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Finaled
Sep 8, 2022
County Fire CF
Proposed construction of one building approximately 135,000 sf with loading docks, parking, drive aisles, perimeter landscaping total development- 7.3 acres
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Finaled
Sep 7, 2022
County Fire CF
Proposed construction of one building approximately 149,000 sf with loading dock, parking, drive aisles, perimeter landscaping total development - 10 acres
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Finaled
Sep 7, 2022
County Fire CF
High piled storage plans detailing what is being stored, how it is being stored, and how it is being protected
Status: Finaled
Sep 2, 2022
County Fire CF
Fire alarm installation
Status: Issued
Sep 2, 2022
County Fire CF
Habitat for humanity of greater sacramento (hfhgs) will be building 18 single family homes in the cornerstone development. hfhgs is currently in the process of getting it's 3 master plans approved by the county building department. this ap
Contractor:
HABITAT FOR HUMANITY OF GREATER SACRAMENTO INC
Status: Finaled
Aug 31, 2022
County Fire CF
Habitat for humanity of greater sacramento (hfhgs) will be building 18 single family homes in the cornerstone development. hfhgs is currently in the process of getting it's 3 master plans approved by the county building department. this a
Contractor:
HABITAT FOR HUMANITY OF GREATER SACRAMENTO INC
Status: Finaled
Aug 31, 2022
County Fire CF
Habitat for humanity of greater sacramento (hfhgs) will be building 18 single family homes in the cornerstone development. hfhgs is currently in the process of getting it's master plans approved by the county building department. this appl
Status: Finaled
Aug 30, 2022
County Fire CF
Construction of metal building for truck repair including office and storage space
Status: Issued
Aug 25, 2022
County Fire CF
Civil on-site plans-proposed construction of one building approximately 391,500 sf with loading docks, parking, drive aisles, perimeter landscaping and street lighting along lone tree road total- 26 acres
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Finaled
Aug 19, 2022
County Fire CF
On-site civil plans-proposed construction of one building approximately 391,500. with loading docks, parking, drivand street lighting along lone tree road. total development = 26 acres.e aisles, perimeter landscaping
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Finaled
Aug 19, 2022
County Fire CF
Onsite- civil plans -proposed construction of one building approximately 391,500 sf. wish loading docks, parking, drive aisles, perimeter landscaping and street lighting along lone tree. total development- 26 acres
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Finaled
Aug 19, 2022
County Fire CF
Remove and replace ahu 601. new air handlers. install three (3) new split heat pumps in three rooms. scope of project is mechanical and electrical only; no fire sprinkler or fire alarm work
Status: Issued
Aug 18, 2022
Aug 18, 2022
County Fire CF
No new construction proposed with this permit. scope of work inclusive of adding electrical receptacles and light fixtures. tenant from suite 100 will be utilizing suite 160 as additional storage space.
Status: Finaled
Aug 17, 2022
County Fire CF
Tenant improvement
Status: Issued
Aug 16, 2022
County Fire CF
Modification of at & t telecommunication site. remove and replace: 4 antennas, 1 purcell cabinet, install: 1 additional antenna, 3 fiber jumpers, 3 dc6, 3 power trunks, 1 dc12. 1 rectifier, 1 6648, 1 6675, 1 rectifer, 1 battery string, new
Contractor:
MASTEC NETWORK SOLUTIONS INC
Status: Issued
Aug 16, 2022
County Fire CF
Road, median, utility work to accommodate a new traffic signal between 7810 and 7860 metro air pkwy. no fire related work proposed.
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Issued
Aug 16, 2022
Aug 12, 2022
County Fire CF
Two industrial building with associated truck docks, parking area and drive aisles
Status: Issued
Aug 8, 2022
County Fire CF
The proposed improvements shall widen metro air parkway (east side) from the south property line of lot 41 to the north property line of lot 43 ( total of about 5500 lf roadway widening
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Issued
Aug 3, 2022
County Fire CF
New custom home
Status: Issued
Aug 3, 2022
County Fire CF
Building shell plans-proposed construction of one building approximately 568,000 sf with loading docks. parking, drive aisles, perimeter landscaping and street lighting along power line road and serna drive. total development= 32 acres
Contractor:
BUZZ OATES CONSTRUCTION INC
Status: Finaled
Jul 27, 2022
County Fire CF
This is a new est system with generator monitoring and sprinkler monitoring, full notification and released of interlocking ddors. all boxes, conduit, cable device terminations, switches are installed by others. hci to provide drawings, p
Contractor:
H C I SYSTEMS INC
Status: Finaled
Jul 13, 2022
County Fire CF
Foothill fire protection inc. (ffp) to design and install new wet fire sprinkler systems for a community center in new multi family development
Contractor:
FOOTHILL FIRE PROTECTION INC
Status: Issued
Jul 13, 2022
County Fire CF
Revision to approved plans cf-2203781 . add esfr pendant sprinklers underneath electrical conduit
Contractor:
J - FOUR ENTERPRISES INC
Status: Issued
Jul 12, 2022
County Fire CF
The base scope of work consists of building out an unoccupied cold shell building for the orca bio client. the build out of this space will consist of office space, lab space, modular clean room and warehouse spaces. this submission is fo
Contractor:
DPR CONSTRUCTION A GENERAL PARTNERSHIP
Status: Issued
Jul 12, 2022
County Fire CF
The base scope of work consists of building out an unoccupied cold shell building for the orca bio client. the build out of the space will consist of office space, lab space, modular clean room and warehouse spaces. this submission is for
Contractor:
DPR CONSTRUCTION A GENERAL PARTNERSHIP
Status: Issued
Jul 12, 2022
Check permits at another Sacramento address
Free instant lookup, no signup.
Search Sacramento permits →