Permit history for 70 Royal Little Dr, Providence

Providence, RI · 27 permits on file · 2018–2019

27
Permits on file
2018
First permit
2019
Most recent
14
Unique contractors
$1,368,700
Declared value (all work)

Permits on file (27)

Ordered most recent first. Data from the city's open data portal.

Mechanical Permit Reconstruct
Repipe 2 rooftop units with gas
Contractor: AERO MECHANICAL INC
Status: Complete
Jul 24, 2019
Declared cost: $1,200
Electrical Permit
Installing 27 devices for sound masking. (low voltage)
Status: Complete
Jun 19, 2019
Declared cost: $3,240
Plumbing Permit
Renovating 2bathrooms 2 toilets, 2 lav sinks, and 2 kitchens , 2 jkitchens sinks, 1 st floor (handicap)
Status: Complete
May 2, 2019
Declared cost: $9,000
Mechanical Permit Install
Installation of custom duct work system
Status: Complete
Apr 19, 2019
Declared cost: $25,300
Fire Alarm Permit
Install fire alarm per plans. relocating existing devices & adding new devices per plans.
Status: Active
Apr 18, 2019
Declared cost: $4,400
Sprinkler and Other Suppression Systems Permit Install
Cte and extend sprinkler coverage per the new architectural changes
Status: Complete
Apr 12, 2019
Declared cost: $12,000
Electrical Permit Change/Revamp
Install 28 dedicated 110v circuits for battery charging units, install 1 20 amp cord drop to work bench
Status: Complete
Apr 10, 2019
Declared cost: $6,345
Mechanical Permit Install
Furnish and install (2) 3 ton rtu, (re-use existing 25 ton rtu) sheet metal permit by others
Status: Complete
Apr 4, 2019
Declared cost: $34,115
Electrical Permit
Demo exsisting wiring. install new lighting plugs and swiths in phase 2
Status: Complete
Mar 25, 2019
Declared cost: $14,000
Building Permit Modification to Existing
Interior non structural renovations.
Status: Active
Mar 20, 2019
Declared cost: $177,000
Building Permit Modification to Existing
Replace existing ground sign for aaa.--exisitng sign: 36 square feet/6' 2" overall height--replace at: 36 square feet/8' 3" overall heightuse exisitng pole/footings - new pole cover/sign. same setback as existing/place at same location as e
Status: Active
Nov 26, 2018
Declared cost: $3,000
Electrical Permit
Low voltage wiring
Status: Complete
Nov 1, 2018
Declared cost: $4,500
Building Permit Change of Use Only
Building a demising wall to separate the 20,000 s/f vacant space into two separate spaces and requesting a co for warehouse tenant space only .
Status: Complete
Oct 17, 2018
Declared cost: $20,000
Electrical Permit
Replace lighting at aaa, 290-7399 - exterior lighting only.
Status: Complete
Jul 17, 2018
Declared cost: $14,000
Mechanical Permit Install
Addition and relocation of sprinkler heads
Status: Complete
Jun 18, 2018
Declared cost: $30,000
Electrical Permit
Perform infrared testing and routing service to switchboard.
Status: Complete
Jun 15, 2018
Declared cost: $500
Electrical Permit
Installation of 44 ceiling speakers and 8 ceiling sensors.
Contractor: RELCO INC
Status: Complete
Jun 8, 2018
Declared cost: $4,000
Electrical Permit Change/Revamp
Low voltage cable, revamp card readers and camera equipment
Status: Complete
May 21, 2018
Declared cost: $4,000
Mechanical Permit Install
Recover refrigerant on 4 hvac units, furnish and install 4 replacement hvac units and curb adaptors. job was added with same crane pick as permit 98100
Status: Complete
May 14, 2018
Declared cost: $52,500
Mechanical Permit Install
Disconnect and reconnect gas pipe to 13 new rooftop units.
Contractor: AERO MECHANICAL INC
Status: Complete
May 14, 2018
Declared cost: $4,500
Electrical Permit New
Data cat5e cable, cat5e patch panels, cable management, cat5e terminations, 2 post rack
Status: Complete
May 9, 2018
Declared cost: $72,000
Plumbing Permit
Remove and reinstall toilets, urinals and lavatory sinks with new faucets. install one new kitchen sink, with a point of use hot water heater, and install two new wall-hung lavatory sinks, 2 drinking fountains.
Status: Complete
Apr 6, 2018
Declared cost: $15,000
Electrical Permit
Demo exsisting wiring. install new lighting, plugs switches, em lighting and relocalte panels.
Status: Complete
Mar 28, 2018
Declared cost: $62,000
Electrical Permit
Install fire alarm per code
Status: Complete
Mar 19, 2018
Declared cost: $12,000
Mechanical Permit Install
Recover refrigerant on 9 hvac units, furnish and install 9 replacement hvac units and curb adaptors. furnish and install (2) carrier multi zone mini splits
Status: Complete
Mar 14, 2018
Declared cost: $142,900
Mechanical Permit Construct
Fabrication and installation of new ductwork and associated air distibution devices to tie into existing ahu sleeves thru roof.
Status: Complete
Mar 12, 2018
Declared cost: $46,200
Building Permit Modification to Existing
Divide existing building into two units for offices and a separate tenant space. exterior alterations include: new openings with fixed fenestration are proposed to the west wall of the open office space. interior alterations include: re con
Status: Complete
Mar 9, 2018
Declared cost: $595,000

Check permits at another Providence address

Free instant lookup, no signup.

Search Providence permits →
Disclaimer: Permit data comes from Providence's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the Providence building department before buying, selling, or planning work.