Permit history for Right Of Way

Portland, OR · 500 permits on file · 2023–2026

500
Permits on file
2023
First permit
2026
Most recent
$1,327,938
Declared value (all work)

Permits on file (500)

Ordered most recent first. Data from the city's open data portal.

Noise Variance Other Applications
Block party
Status: Variance Approved
May 21, 2026
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
May 20, 2026
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Issued
May 19, 2026
Tree Code Removal/Replant
Right-of-way
Status: Issued - UF
May 15, 2026
Tree Code IAA
Right-of-way
Status: Issued - UF
May 14, 2026
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Issued
May 14, 2026
Noise Complaint Industrial/Commercial
Band
Status: Priority 3- On Hold
May 12, 2026
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Issued
May 12, 2026
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Issued
May 12, 2026
Noise Variance Construction
Construction minor hours/sunday extensio
Status: Variance Approved
May 9, 2026
Noise Variance Construction
Construction minor hours/sunday extensio
Status: Variance Approved
May 8, 2026
Noise Variance Other Applications
Non-park minor event
Status: Variance Approved
May 7, 2026
Noise Variance Other Applications
Non-park minor event
Status: Variance Approved
May 7, 2026
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Issued
May 6, 2026
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
May 6, 2026
Tree Code CIP
Right-of-way
Status: Issued - UF
May 6, 2026
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
May 5, 2026
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
May 5, 2026
Commercial Building Permit Assembly
New construction
Status: Issued
May 5, 2026
Declared cost: $1,299,010
Tree Code Root Pruning
Pp&r
Status: Issued - UF
May 4, 2026
Noise Variance High Noise Impact Event
Other events
Status: Variance Approved
May 1, 2026
Noise Variance Other Applications
Other events
Status: Variance Approved
May 1, 2026
Noise Variance Construction
Construction minor hours/sunday extensio
Status: Variance Approved
May 1, 2026
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Apr 30, 2026
Noise Variance Other Applications
Minor event in park
Status: Variance Approved
Apr 29, 2026
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Apr 24, 2026
Noise Variance High Noise Impact Event
Other events
Status: Variance Approved
Apr 23, 2026
Tree Code IAA
Right-of-way
Status: Issued - UF
Apr 23, 2026
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Apr 21, 2026
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Apr 16, 2026
Tree Code Root Pruning
Right-of-way
Status: Issued - UF
Apr 15, 2026
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Apr 9, 2026
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Apr 9, 2026
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Apr 9, 2026
Noise Variance High Noise Impact Event
Block party
Status: Variance Approved
Apr 9, 2026
Noise Variance High Noise Impact Event
Run
Status: Variance Approved
Apr 1, 2026
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Issued
Mar 30, 2026
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Mar 20, 2026
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Issued
Mar 17, 2026
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Mar 17, 2026
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Mar 17, 2026
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Mar 14, 2026
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Mar 11, 2026
Noise Variance Other Applications
Block party
Status: Variance Approved
Mar 11, 2026
Parks Urban Forestry IAA
Right-of-way
Status: Issued - UF
Mar 9, 2026
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Mar 4, 2026
Noise Complaint Industrial/Commercial
Exterior activities- not construction
Status: Priority 3- On Hold
Feb 27, 2026
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Feb 26, 2026
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Issued
Feb 21, 2026
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Issued
Feb 21, 2026
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Issued
Feb 21, 2026
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Issued
Feb 21, 2026
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Feb 19, 2026
Noise Complaint Industrial/Commercial
Exterior activities- not construction
Status: Priority 3- On Hold
Feb 19, 2026
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Issued
Feb 18, 2026
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Issued
Feb 18, 2026
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Feb 18, 2026
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Issued
Feb 18, 2026
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Issued
Feb 18, 2026
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Issued
Feb 18, 2026
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Issued
Feb 18, 2026
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Issued
Feb 18, 2026
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Issued
Feb 18, 2026
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Issued
Feb 18, 2026
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Issued
Feb 18, 2026
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Issued
Feb 18, 2026
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Feb 17, 2026
Sanitation Inspections Alternative Treatment Technology
Annual report
Status: Approved
Feb 6, 2026
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Feb 6, 2026
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Feb 6, 2026
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Feb 3, 2026
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Feb 2, 2026
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Jan 30, 2026
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Jan 28, 2026
Parks Urban Forestry Removal/Replant
Private
Status: Issued - UF
Jan 23, 2026
Parks Urban Forestry CIP
Right-of-way
Status: Expired - UF
Jan 20, 2026
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Jan 13, 2026
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Jan 12, 2026
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Dec 23, 2025
Noise Complaint Industrial/Commercial
Band
Status: Priority 3- On Hold
Dec 23, 2025
Public Works, Transportation Bureau PDOT
Status: Construction Management
Dec 19, 2025
Public Works, Transportation Bureau PDOT
Status: Construction Management
Dec 19, 2025
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Dec 18, 2025
Noise Complaint Industrial/Commercial
Exterior activities- not construction
Status: Priority 3- On Hold
Dec 16, 2025
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Dec 15, 2025
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Dec 11, 2025
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Dec 4, 2025
Parks Urban Forestry CIP
Right-of-way
Status: Closed - UF
Nov 20, 2025
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Nov 17, 2025
Transportation Review Encroachment
Status: Issued
Nov 13, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Nov 8, 2025
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Nov 7, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Nov 7, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Nov 7, 2025
Parks Urban Forestry IAA
Right-of-way
Status: Issued - UF
Nov 4, 2025
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Oct 31, 2025
Noise Variance Other Applications
Block party
Status: Variance Approved
Oct 30, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Issued
Oct 23, 2025
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Oct 22, 2025
Parks Urban Forestry Root Pruning
Right-of-way
Status: Issued - UF
Oct 17, 2025
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Oct 16, 2025
Parks Urban Forestry IAA
Right-of-way
Status: Issued - UF
Oct 16, 2025
Noise Variance Noise Review Board Variance
Construction basic single day/night
Status: Variance Approved
Oct 15, 2025
Noise Variance Other Applications
Other events
Status: Variance Approved
Oct 10, 2025
Parks Urban Forestry CIP
Right-of-way
Status: Closed - UF
Oct 10, 2025
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Oct 9, 2025
Noise Variance Construction
Construction minor hours/sunday extensio
Status: Variance Approved
Sep 30, 2025
Parks Urban Forestry Pruning
Right-of-way
Status: Issued - UF
Sep 30, 2025
Parks Urban Forestry IAA
Right-of-way
Status: Issued - UF
Sep 23, 2025
Parks Urban Forestry Other
Right-of-way
Status: Issued - UF
Sep 19, 2025
Noise Variance Construction
Construction minor hours/sunday extensio
Status: Variance Approved
Sep 18, 2025
Parks Urban Forestry IAA
Right-of-way
Status: Issued - UF
Sep 18, 2025
Parks Urban Forestry Root Pruning
Right-of-way
Status: Issued - UF
Sep 18, 2025
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Sep 17, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Expired
Sep 16, 2025
Noise Variance High Noise Impact Event
Block party
Status: Variance Approved
Sep 16, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Sep 12, 2025
Noise Variance Other Applications
Block party
Status: Variance Approved
Sep 12, 2025
Noise Variance Other Applications
Non-park minor event
Status: Variance Approved
Sep 12, 2025
Noise Variance Other Applications
Block party
Status: Variance Approved
Sep 12, 2025
Noise Variance Other Applications
Block party
Status: Variance Approved
Sep 12, 2025
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Sep 11, 2025
Noise Variance Other Applications
Block party
Status: Variance Approved
Sep 11, 2025
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Sep 10, 2025
Noise Variance Other Applications
Block party
Status: Variance Approved
Sep 10, 2025
Noise Variance High Noise Impact Event
Concert
Status: Variance Approved
Sep 9, 2025
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Sep 9, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Sep 5, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Sep 5, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Sep 5, 2025
Parks Urban Forestry Removal/Replant
Right-of-way
Status: Issued - UF
Sep 5, 2025
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Sep 3, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Sep 3, 2025
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Aug 29, 2025
Noise Variance Noise Review Board Variance
Construction basic single day/night
Status: Variance Approved
Aug 29, 2025
Parks Urban Forestry IAA
Right-of-way
Status: Issued - UF
Aug 28, 2025
Noise Variance Noise Review Board Variance
Construction basic single day/night
Status: Variance Approved
Aug 28, 2025
Noise Complaint Industrial/Commercial
Band
Status: Priority 3- On Hold
Aug 27, 2025
Noise Variance High Noise Impact Event
Concert
Status: Variance Approved
Aug 21, 2025
Parks Urban Forestry IAA
Right-of-way
Status: Issued - UF
Aug 20, 2025
Noise Complaint Industrial/Commercial
Band
Status: Priority 3- On Hold
Aug 15, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Aug 14, 2025
Noise Complaint Industrial/Commercial
Band
Status: Priority 3- On Hold
Aug 13, 2025
Noise Variance Other Applications
Other events
Status: Variance Approved
Aug 13, 2025
Noise Variance Other Applications
Block party
Status: Variance Approved
Aug 13, 2025
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Aug 11, 2025
Noise Variance Construction
Construction minor hours/sunday extensio
Status: Variance Approved
Aug 11, 2025
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Aug 9, 2025
Noise Variance High Noise Impact Event
Other events
Status: Variance Approved
Aug 9, 2025
Noise Variance High Noise Impact Event
Block party
Status: Variance Approved
Aug 8, 2025
Land Use Review Type 1 procedure new
Hr - historic resource review
Status: Decision Rendered
Aug 7, 2025
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Aug 7, 2025
Noise Variance Other Applications
Block party
Status: Variance Approved
Aug 5, 2025
Noise Complaint Industrial/Commercial
Band
Status: Priority 3- On Hold
Aug 5, 2025
Noise Variance High Noise Impact Event
Block party
Status: Variance Approved
Aug 4, 2025
Noise Variance Other Applications
Non-park minor event
Status: Variance Approved
Jul 31, 2025
Noise Variance Other Applications
Block party
Status: Variance Approved
Jul 30, 2025
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Jul 30, 2025
Noise Variance Other Applications
Block party
Status: Variance Approved
Jul 29, 2025
Noise Variance Other Applications
Block party
Status: Variance Approved
Jul 29, 2025
Noise Variance Other Applications
Other events
Status: Variance Approved
Jul 29, 2025
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Jul 25, 2025
Noise Variance Other Applications
Block party
Status: Variance Approved
Jul 24, 2025
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Jul 23, 2025
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Jul 22, 2025
Noise Variance Noise Review Board Variance
Construction basic single day/night
Status: Variance Approved
Jul 22, 2025
Noise Complaint Industrial/Commercial
Band
Status: Priority 3- No Action
Jul 22, 2025
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Jul 18, 2025
Noise Variance Other Applications
Block party
Status: Variance Approved
Jul 17, 2025
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Jul 15, 2025
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Jul 15, 2025
Noise Variance High Noise Impact Event
Block party
Status: Variance Approved
Jul 12, 2025
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Jul 11, 2025
Noise Complaint Industrial/Commercial
Exterior activities- not construction
Status: Priority 3- On Hold
Jul 9, 2025
Parks Urban Forestry CIP
City
Status: Issued - UF
Jul 8, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Expired
Jul 7, 2025
Noise Variance Other Applications
Block party
Status: Variance Approved
Jul 3, 2025
Noise Variance High Noise Impact Event
Other events
Status: Variance Approved
Jul 2, 2025
Noise Variance Other Applications
Block party
Status: Variance Approved
Jul 1, 2025
Parks Urban Forestry Pruning
Right-of-way
Status: Issued - UF
Jun 24, 2025
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Jun 23, 2025
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Jun 20, 2025
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Jun 12, 2025
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Jun 10, 2025
Noise Variance High Noise Impact Event
Block party
Status: Variance Approved
Jun 10, 2025
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Jun 5, 2025
Noise Variance Construction
Construction basic single day/night
Status: Incomplete Application
Jun 5, 2025
Noise Variance Other Applications
Block party
Status: Variance Approved
Jun 3, 2025
Parks Urban Forestry IAA
Right-of-way
Status: Issued - UF
Jun 3, 2025
Parks Urban Forestry IAA
Right-of-way
Status: Issued - UF
Jun 3, 2025
Noise Variance Other Applications
Other events
Status: Variance Approved
May 27, 2025
Transportation Review Encroachment
Status: Issued
May 23, 2025
Parks Urban Forestry Root Pruning
Right-of-way
Status: Issued - UF
May 23, 2025
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
May 21, 2025
Parks Urban Forestry Pruning
Right-of-way
Status: Issued - UF
May 19, 2025
Parks Urban Forestry CIP
Right-of-way
Status: Closed - UF
May 12, 2025
Noise Variance Construction
Construction minor hours/sunday extensio
Status: Variance Approved
May 8, 2025
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
May 6, 2025
Noise Variance Construction
Construction minor hours/sunday extensio
Status: Variance Approved
May 1, 2025
Noise Variance Other Applications
Block party
Status: Variance Approved
Apr 28, 2025
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Apr 25, 2025
Parks Urban Forestry Root Pruning
City
Status: Issued - UF
Apr 25, 2025
Noise Variance Other Applications
Minor event in park
Status: Variance Approved
Apr 24, 2025
Noise Variance Other Applications
Block party
Status: Variance Approved
Apr 24, 2025
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Apr 23, 2025
Parks Urban Forestry CIP
Right-of-way
Status: Closed - UF
Apr 14, 2025
Noise Complaint Industrial/Commercial
Band
Status: Priority 3- On Hold
Apr 14, 2025
Parks Urban Forestry CIP
Right-of-way
Status: Closed - UF
Apr 11, 2025
Parks Urban Forestry IAA
Right-of-way
Status: Issued - UF
Apr 11, 2025
Public Works, Transportation Bureau PDOT
Status: Construction Management
Apr 7, 2025
Public Works, Transportation Bureau PDOT
Status: Construction Management
Apr 7, 2025
Parks Urban Forestry IAA
Right-of-way
Status: Issued - UF
Apr 7, 2025
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Apr 4, 2025
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Apr 2, 2025
Public Works, Transportation Bureau PDOT
Status: Construction Management
Apr 1, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Mar 31, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Mar 31, 2025
Electrical Permit Commercial/Multifamily
Alteration
Status: Final
Mar 31, 2025
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Mar 29, 2025
Parks Urban Forestry CIP
Right-of-way
Status: Expired - UF
Mar 28, 2025
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Mar 26, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Mar 26, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Mar 26, 2025
Parks Urban Forestry CIP
Right-of-way
Status: Expired - UF
Mar 26, 2025
Noise Variance Construction
Construction crane erection
Status: Variance Approved
Mar 25, 2025
Land Use Review Type 2 procedure
Ad - adjustment
Status: Decision Rendered
Mar 20, 2025
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Mar 12, 2025
Noise Variance Construction
Construction crane erection
Status: Variance Approved
Mar 11, 2025
Parks Urban Forestry CIP
Right-of-way
Status: Closed - UF
Mar 11, 2025
Zoning Permit LUR Condition Compliance
Commercial
Status: Issued
Mar 6, 2025
Parks Urban Forestry IAA
Right-of-way
Status: Expired - UF
Mar 5, 2025
Electrical Permit Commercial/Multifamily
New construction
Status: Final
Mar 3, 2025
Electrical Permit Commercial/Multifamily
New construction
Status: Final
Mar 3, 2025
Electrical Permit Commercial/Multifamily
Alteration
Status: Final
Mar 3, 2025
Parks Urban Forestry IAA
Right-of-way
Status: Expired - UF
Mar 3, 2025
Parks Urban Forestry IAA
Right-of-way
Status: Expired - UF
Mar 3, 2025
Noise Variance High Noise Impact Event
Run
Status: Variance Approved
Feb 26, 2025
Parks Urban Forestry Removal/Replant
Right-of-way
Status: Expired - UF
Feb 25, 2025
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Feb 21, 2025
Parks Urban Forestry IAA
Right-of-way
Status: Expired - UF
Feb 21, 2025
Noise Variance Construction
Construction crane erection
Status: Variance Approved
Feb 19, 2025
Sanitation Inspections Alternative Treatment Technology
Annual report
Status: Approved
Feb 10, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Feb 8, 2025
Parks Urban Forestry CIP
Right-of-way
Status: Expired - UF
Feb 5, 2025
Parks Urban Forestry Root Pruning
Right-of-way
Status: Expired - UF
Feb 4, 2025
Noise Variance High Noise Impact Event
Other events
Status: Variance Approved
Jan 28, 2025
Electrical Permit Commercial/Multifamily
New construction
Status: Final
Jan 27, 2025
Noise Variance High Noise Impact Event
Other events
Status: Variance Approved
Jan 27, 2025
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Jan 25, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Jan 23, 2025
Noise Variance Noise Review Board Variance
Construction basic single day/night
Status: Variance Approved
Jan 22, 2025
Parks Urban Forestry Root Pruning
Right-of-way
Status: Expired - UF
Jan 17, 2025
Noise Variance High Noise Impact Event
Other events
Status: Variance Approved
Jan 16, 2025
Transportation Review Encroachment
Status: Issued
Jan 16, 2025
Parks Urban Forestry IAA
Right-of-way
Status: Expired - UF
Jan 16, 2025
Parks Urban Forestry IAA
Right-of-way
Status: Expired - UF
Jan 16, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Jan 15, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Jan 15, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Jan 15, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Jan 14, 2025
Noise Complaint Industrial/Commercial
Band
Status: Priority 3- On Hold
Jan 9, 2025
Noise Complaint Industrial/Commercial
Band
Status: Priority 3- On Hold
Jan 8, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Dec 27, 2024
Electrical Permit Commercial/Multifamily
New construction
Status: Final
Dec 16, 2024
Parks Urban Forestry CIP
Right-of-way
Status: Closed - UF
Dec 12, 2024
Parks Urban Forestry CIP
Right-of-way
Status: Closed - UF
Dec 11, 2024
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Dec 10, 2024
Parks Urban Forestry CIP
Right-of-way
Status: Expired - UF
Dec 10, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Dec 5, 2024
Zoning Permit Landscaping
Residential
Status: Issued
Dec 3, 2024
Parks Urban Forestry Root Pruning
Right-of-way
Status: Expired - UF
Dec 2, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Nov 23, 2024
Parks Urban Forestry Other
Right-of-way
Status: Expired - UF
Nov 21, 2024
Noise Variance High Noise Impact Event
Other events
Status: Variance Approved
Nov 13, 2024
Parks Urban Forestry CIP
Right-of-way
Status: Expired - UF
Nov 13, 2024
Noise Variance Other Applications
Other events
Status: Variance Approved
Nov 12, 2024
Parks Urban Forestry IAA
Right-of-way
Status: Expired - UF
Nov 12, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Nov 7, 2024
Noise Variance Construction
Construction basic single day/night
Status: Incomplete Application
Nov 6, 2024
Parks Urban Forestry CIP
Right-of-way
Status: Expired - UF
Oct 30, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Oct 16, 2024
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Oct 16, 2024
Parks Urban Forestry Root Pruning
Right-of-way
Status: Expired - UF
Oct 16, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Oct 11, 2024
Parks Urban Forestry CIP
Right-of-way
Status: Closed - UF
Oct 11, 2024
Parks Urban Forestry IAA
Right-of-way
Status: Expired - UF
Oct 10, 2024
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Oct 8, 2024
Noise Variance High Noise Impact Event
Block party
Status: Variance Approved
Oct 1, 2024
Noise Variance High Noise Impact Event
Block party
Status: Variance Approved
Sep 27, 2024
Noise Variance Construction
Construction minor hours/sunday extensio
Status: Variance Approved
Sep 20, 2024
Noise Variance Other Applications
Block party
Status: Variance Approved
Sep 20, 2024
Noise Variance Other Applications
Other events
Status: Variance Approved
Sep 20, 2024
Parks Urban Forestry CIP
Right-of-way
Status: Closed - UF
Sep 19, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Sep 17, 2024
Parks Urban Forestry IAA
Right-of-way
Status: Expired - UF
Sep 17, 2024
Noise Variance Other Applications
Block party
Status: Variance Approved
Sep 16, 2024
Noise Variance Other Applications
Non-park minor event
Status: Variance Approved
Sep 16, 2024
Noise Variance Other Applications
Block party
Status: Variance Approved
Sep 13, 2024
Noise Variance High Noise Impact Event
Block party
Status: Variance Approved
Sep 13, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Sep 12, 2024
Parks Urban Forestry CIP
Right-of-way
Status: Closed - UF
Sep 10, 2024
Parks Urban Forestry CIP
Right-of-way
Status: Closed - UF
Sep 10, 2024
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Sep 10, 2024
Parks Urban Forestry CIP
Right-of-way
Status: Closed - UF
Sep 9, 2024
Noise Variance Other Applications
Block party
Status: Variance Approved
Sep 6, 2024
Parks Urban Forestry Root Pruning
Right-of-way
Status: Expired - UF
Sep 6, 2024
Parks Urban Forestry CIP
Right-of-way
Status: Expired - UF
Sep 5, 2024
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Sep 4, 2024
Noise Variance Other Applications
Block party
Status: Variance Approved
Sep 4, 2024
Noise Variance Other Applications
Minor event in park
Status: Variance Approved
Sep 3, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Aug 30, 2024
Noise Variance Other Applications
Other events
Status: Variance Approved
Aug 30, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Aug 29, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Aug 29, 2024
Parks Urban Forestry CIP
Right-of-way
Status: Closed - UF
Aug 28, 2024
Parks Urban Forestry CIP
Right-of-way
Status: Expired - UF
Aug 26, 2024
Noise Variance High Noise Impact Event
Block party
Status: Variance Approved
Aug 23, 2024
Parks Urban Forestry Root Pruning
Right-of-way
Status: Expired - UF
Aug 23, 2024
Parks Urban Forestry CIP
Right-of-way
Status: Expired - UF
Aug 22, 2024
Noise Variance High Noise Impact Event
Block party
Status: Variance Approved
Aug 22, 2024
Noise Variance Other Applications
Run
Status: Variance Approved
Aug 21, 2024
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Aug 20, 2024
Noise Variance Other Applications
Block party
Status: Incomplete Application
Aug 14, 2024
Parks Urban Forestry Root Pruning
Right-of-way
Status: Expired - UF
Aug 12, 2024
Noise Variance High Noise Impact Event
Concert
Status: Variance Approved
Aug 9, 2024
Noise Variance Other Applications
Block party
Status: Variance Approved
Aug 8, 2024
Noise Variance High Noise Impact Event
Other events
Status: Variance Approved
Aug 8, 2024
Noise Variance Other Applications
Other events
Status: Variance Approved
Aug 7, 2024
Noise Variance Other Applications
Other events
Status: Variance Approved
Aug 5, 2024
Parks Urban Forestry Root Pruning
Right-of-way
Status: Expired - UF
Aug 5, 2024
Noise Variance High Noise Impact Event
Block party
Status: Variance Approved
Aug 2, 2024
Noise Variance High Noise Impact Event
Block party
Status: Variance Approved
Aug 2, 2024
Noise Variance High Noise Impact Event
Block party
Status: Variance Approved
Aug 2, 2024
Noise Variance Other Applications
Block party
Status: Variance Approved
Aug 2, 2024
Parks Urban Forestry Root Pruning
Right-of-way
Status: Expired - UF
Aug 1, 2024
Public Works, Transportation Bureau PDOT
Status: Construction Management
Jul 30, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Jul 27, 2024
Noise Variance High Noise Impact Event
Other events
Status: Variance Approved
Jul 26, 2024
Noise Variance High Noise Impact Event
Block party
Status: Variance Approved
Jul 25, 2024
Noise Variance Construction
Construction crane erection
Status: Variance Approved
Jul 23, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Jul 23, 2024
Noise Variance High Noise Impact Event
Block party
Status: Variance Approved
Jul 18, 2024
Noise Variance High Noise Impact Event
Block party
Status: Variance Approved
Jul 18, 2024
Parks Urban Forestry IAA
Right-of-way
Status: Expired - UF
Jul 12, 2024
Parks Urban Forestry CIP
Right-of-way
Status: Expired - UF
Jul 11, 2024
Noise Variance Other Applications
Block party
Status: Variance Approved
Jul 11, 2024
Noise Variance Other Applications
Block party
Status: Variance Approved
Jul 8, 2024
Noise Variance Construction
Construction minor hours/sunday extensio
Status: Variance Approved
Jul 3, 2024
Noise Variance High Noise Impact Event
Block party
Status: Variance Approved
Jul 3, 2024
Noise Variance High Noise Impact Event
Block party
Status: Variance Approved
Jul 3, 2024
Parks Urban Forestry CIP
Right-of-way
Status: Expired - UF
Jul 3, 2024
Parks Urban Forestry CIP
Right-of-way
Status: Expired - UF
Jul 3, 2024
Noise Complaint Industrial/Commercial
Band
Status: Request
Jul 3, 2024
Parks Urban Forestry Removal/Replant
Right-of-way
Status: Expired - UF
Jul 2, 2024
Noise Variance Other Applications
Non-park minor event
Status: Variance Approved
Jul 1, 2024
Parks Urban Forestry CIP
Right-of-way
Status: Closed - UF
Jul 1, 2024
Noise Variance Other Applications
Other events
Status: Variance Approved
Jun 28, 2024
Parks Urban Forestry CIP
Right-of-way
Status: Expired - UF
Jun 27, 2024
Parks Urban Forestry Root Pruning
Right-of-way
Status: Expired - UF
Jun 26, 2024
Parks Urban Forestry Root Pruning
Right-of-way
Status: Expired - UF
Jun 26, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Jun 18, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Jun 18, 2024
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Jun 12, 2024
Noise Variance Other Applications
Block party
Status: Variance Approved
Jun 10, 2024
Noise Variance High Noise Impact Event
Concert
Status: Variance Approved
Jun 10, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Jun 7, 2024
Noise Variance Other Applications
Block party
Status: Variance Approved
Jun 6, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Jun 6, 2024
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
May 31, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
May 29, 2024
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
May 28, 2024
Noise Variance Other Applications
Other events
Status: Variance Approved
May 23, 2024
Noise Variance High Noise Impact Event
Block party
Status: Variance Approved
May 23, 2024
Noise Variance Other Applications
Other events
Status: Variance Approved
May 23, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
May 21, 2024
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
May 21, 2024
Noise Variance High Noise Impact Event
Block party
Status: Variance Approved
May 20, 2024
Noise Variance Other Applications
Block party
Status: Variance Approved
May 20, 2024
Noise Complaint Industrial/Commercial
Band
Status: Priority 3- On Hold
May 17, 2024
Noise Complaint Industrial/Commercial
Band
Status: Priority 3- On Hold
May 16, 2024
Noise Variance Other Applications
Block party
Status: Variance Approved
May 15, 2024
Noise Variance Other Applications
Block party
Status: Variance Approved
May 15, 2024
Noise Variance Other Applications
Block party
Status: Variance Approved
May 15, 2024
Noise Variance High Noise Impact Event
Run
Status: Variance Approved
May 14, 2024
Noise Variance Other Applications
Block party
Status: Incomplete Application
May 14, 2024
Parks Urban Forestry Root Pruning
Right-of-way
Status: Expired - UF
May 14, 2024
Noise Variance Other Applications
Other events
Status: Variance Approved
May 9, 2024
Noise Variance Other Applications
Block party
Status: Variance Approved
May 6, 2024
Noise Variance High Noise Impact Event
Other events
Status: Variance Approved
May 3, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
May 3, 2024
Noise Variance Other Applications
Minor event in park
Status: Variance Approved
May 3, 2024
Parks Urban Forestry Removal/Replant
Right-of-way
Status: Expired - UF
May 2, 2024
Noise Variance Other Applications
Other events
Status: Variance Approved
Apr 30, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Apr 30, 2024
Noise Variance Other Applications
Other events
Status: Variance Approved
Apr 26, 2024
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Apr 22, 2024
Minor Improvement Permit Required MIP
Status: Issued-TM
Apr 22, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Apr 20, 2024
Noise Variance Other Applications
Non-park minor event
Status: Variance Approved
Apr 18, 2024
Noise Variance Other Applications
Concert
Status: Variance Approved
Apr 18, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Apr 18, 2024
Noise Variance Other Applications
Construction basic single day/night
Status: Variance Approved
Apr 10, 2024
Public Works, Transportation Bureau PDOT
Status: Construction Management
Apr 10, 2024
Noise Variance Construction
Construction basic single day/night
Status: Incomplete Application
Apr 10, 2024
Parks Urban Forestry Root Pruning
Right-of-way
Status: Expired - UF
Apr 9, 2024
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Apr 8, 2024
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Apr 8, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Apr 4, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Apr 2, 2024
Parks Urban Forestry CIP
Right-of-way
Status: Closed - UF
Apr 1, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Mar 28, 2024
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Mar 28, 2024
Parks Urban Forestry CIP
Right-of-way
Status: Closed - UF
Mar 28, 2024
Parks Urban Forestry Root Pruning
Right-of-way
Status: Expired - UF
Mar 27, 2024
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Mar 26, 2024
Parks Urban Forestry Root Pruning
Right-of-way
Status: Expired - UF
Mar 26, 2024
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Mar 25, 2024
Noise Variance Other Applications
Block party
Status: Variance Approved
Mar 25, 2024
Noise Variance High Noise Impact Event
Run
Status: Closed
Mar 21, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Mar 21, 2024
Noise Variance High Noise Impact Event
Other events
Status: Variance Approved
Mar 20, 2024
Noise Variance High Noise Impact Event
Other events
Status: Closed
Mar 20, 2024
Noise Variance Other Applications
Block party
Status: Incomplete Application
Mar 20, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Mar 19, 2024
Noise Variance Other Applications
Non-park minor event
Status: Variance Approved
Mar 18, 2024
Noise Complaint Industrial/Commercial
Band
Status: Priority 3- On Hold
Mar 18, 2024
Noise Variance High Noise Impact Event
Block party
Status: Closed
Mar 15, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Mar 15, 2024
Public Works, Transportation Bureau PDOT/BES
Status: Construction Management
Mar 7, 2024
Parks Urban Forestry Root Pruning
Right-of-way
Status: Expired - UF
Mar 7, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Mar 5, 2024
Sanitation Inspections Alternative Treatment Technology
Annual report
Status: Approved
Mar 1, 2024
Noise Variance Construction
Construction basic single day/night
Status: Closed
Feb 27, 2024
Noise Complaint Industrial/Commercial
Construction
Status: Request
Feb 26, 2024
Noise Complaint Industrial/Commercial
Exterior activities- not construction
Status: Priority 3- On Hold
Feb 26, 2024
Parks Urban Forestry CIP
Right-of-way
Status: Closed - UF
Feb 20, 2024
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Feb 15, 2024
Parks Urban Forestry CIP
Right-of-way
Status: Closed - UF
Feb 15, 2024
Parks Urban Forestry IAA
Right-of-way
Status: Expired - UF
Feb 15, 2024
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Feb 14, 2024
Parks Urban Forestry Root Pruning
Right-of-way
Status: Expired - UF
Feb 14, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Feb 13, 2024
Parks Urban Forestry CIP
Right-of-way
Status: Expired - UF
Feb 13, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Feb 12, 2024
Noise Variance Construction
Construction minor hours/sunday extensio
Status: Variance Approved
Feb 9, 2024
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Feb 9, 2024
Noise Variance Other Applications
Other events
Status: Variance Approved
Feb 5, 2024
Parks Urban Forestry Other
Right-of-way
Status: Issued - UF
Feb 5, 2024
Parks Urban Forestry Other
Right-of-way
Status: Closed - UF
Feb 2, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Feb 1, 2024
Noise Variance High Noise Impact Event
Concert
Status: Variance Approved
Feb 1, 2024
BES - Sewer Connection Plumbing Permit Commercial
New connection
Status: Final
Feb 1, 2024
Noise Variance Other Applications
Other events
Status: Variance Approved
Jan 31, 2024
Noise Variance Other Applications
Other events
Status: Variance Approved
Jan 23, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Jan 18, 2024
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Jan 18, 2024
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Jan 17, 2024
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Jan 4, 2024
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Dec 29, 2023
Parks Urban Forestry CIP
Right-of-way
Status: Closed - UF
Dec 22, 2023
Noise Variance Other Applications
Other events
Status: Variance Approved
Dec 16, 2023
Noise Variance Other Applications
Non-park minor event
Status: Variance Approved
Dec 16, 2023
Noise Variance Other Applications
Other events
Status: Variance Approved
Dec 15, 2023
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Dec 14, 2023
Noise Variance Other Applications
Non-park minor event
Status: Variance Approved
Dec 5, 2023
Parks Urban Forestry IAA
Right-of-way
Status: Expired - UF
Dec 1, 2023
Parks Urban Forestry IAA
Right-of-way
Status: Expired - UF
Dec 1, 2023
Noise Variance Construction
Construction minor hours/sunday extensio
Status: Variance Approved
Nov 29, 2023
Noise Variance Construction
Construction minor hours/sunday extensio
Status: Variance Approved
Nov 13, 2023
Parks Urban Forestry Removal/Replant
Right-of-way
Status: Expired - UF
Nov 9, 2023
Parks Urban Forestry Root Pruning
Right-of-way
Status: Expired - UF
Nov 8, 2023
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Nov 7, 2023
Parks Urban Forestry CIP
Right-of-way
Status: Closed - UF
Nov 7, 2023
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Nov 6, 2023
Parks Urban Forestry Other
Right-of-way
Status: Expired - UF
Nov 2, 2023
Parks Urban Forestry IAA
Right-of-way
Status: Expired - UF
Nov 1, 2023
Commercial Building Permit Business
New construction
Status: Final
Oct 30, 2023
Declared cost: $9,085
Commercial Building Permit Business
New construction
Status: Final
Oct 30, 2023
Declared cost: $12,232
Commercial Building Permit Business
New construction
Status: Final
Oct 30, 2023
Declared cost: $7,611
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Oct 25, 2023
Parks Urban Forestry CIP
Right-of-way
Status: Expired - UF
Oct 24, 2023
Noise Variance Construction
Construction crane erection
Status: Variance Approved
Oct 23, 2023
Parks Urban Forestry Other
Right-of-way
Status: Expired - UF
Oct 23, 2023
Parks Urban Forestry CIP
Right-of-way
Status: Closed - UF
Oct 23, 2023
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Oct 23, 2023
Parks Urban Forestry CIP
Right-of-way
Status: Issued - UF
Oct 23, 2023
Parks Urban Forestry CIP
Right-of-way
Status: Expired - UF
Oct 23, 2023
Parks Urban Forestry CIP
Right-of-way
Status: Expired - UF
Oct 23, 2023
Parks Urban Forestry Other
Right-of-way
Status: Expired - UF
Oct 20, 2023
Parks Urban Forestry Other
Right-of-way
Status: Expired - UF
Oct 19, 2023
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Oct 18, 2023
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Oct 18, 2023
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Oct 17, 2023
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Oct 16, 2023
Parks Urban Forestry CIP
Right-of-way
Status: Closed - UF
Oct 16, 2023
Zoning Permit Landscaping
Residential
Status: Under Inspection
Oct 13, 2023
Noise Variance Construction
Construction basic single day/night
Status: Variance Approved
Oct 12, 2023
Parks Urban Forestry CIP
Pp&r
Status: Expired - UF
Oct 11, 2023
Parks Urban Forestry CIP
Right-of-way
Status: Expired - UF
Oct 11, 2023
Parks Urban Forestry IAA
Right-of-way
Status: Expired - UF
Oct 11, 2023

Check permits at another Portland address

Free instant lookup, no signup.

Search Portland permits →
Disclaimer: Permit data comes from Portland's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the Portland building department before buying, selling, or planning work.