Permit history for 825 NE Multnomah St

Portland, OR · 241 permits on file · 2021–2026

241
Permits on file
2021
First permit
2026
Most recent
$719,125
Declared value (all work)

Permits on file (241)

Ordered most recent first. Data from the city's open data portal.

Facility Permit Fire Alarms
Alteration
Status: Issued
May 21, 2026
Facility Permit Electrical
Alteration
Status: Under Inspection
May 20, 2026
Facility Permit Project
Alteration
Status: Issued
May 20, 2026
Facility Permit Mechanical
Alteration
Status: Issued
May 19, 2026
Facility Permit Mechanical
Alteration
Status: Issued
May 19, 2026
Facility Permit Fire Alarms
Alteration
Status: Issued
May 18, 2026
Facility Permit Building
Alteration
Status: Issued
Apr 29, 2026
Facility Permit Mechanical
Alteration
Status: Issued
Apr 28, 2026
Facility Permit Mechanical
Alteration
Status: Issued
Apr 22, 2026
Facility Permit Mechanical
Alteration
Status: Issued
Apr 22, 2026
Facility Permit Mechanical
Alteration
Status: Issued
Apr 22, 2026
Facility Permit Mechanical
Alteration
Status: Issued
Apr 22, 2026
Facility Permit Mechanical
Alteration
Status: Issued
Apr 22, 2026
Facility Permit Mechanical
Alteration
Status: Issued
Apr 22, 2026
Facility Permit Fire Alarms
Alteration
Status: Issued
Apr 20, 2026
Facility Permit Project
Alteration
Status: Issued
Apr 14, 2026
Facility Permit Fire Alarms
Alteration
Status: Issued
Apr 1, 2026
Facility Permit Electrical
Alteration
Status: Under Inspection
Mar 31, 2026
Facility Permit Project
Alteration
Status: Issued
Mar 31, 2026
Facility Permit Electrical
Alteration
Status: Under Inspection
Mar 30, 2026
Facility Permit Electrical
Alteration
Status: Under Inspection
Mar 9, 2026
Facility Permit Electrical
Alteration
Status: Under Inspection
Mar 9, 2026
Facility Permit Electrical
Alteration
Status: Under Inspection
Mar 9, 2026
Facility Permit Electrical
Alteration
Status: Under Inspection
Mar 9, 2026
Facility Permit Electrical
Alteration
Status: Under Inspection
Mar 9, 2026
Facility Permit Electrical
Alteration
Status: Issued
Mar 9, 2026
Facility Permit Electrical
Alteration
Status: Issued
Mar 9, 2026
Facility Permit Electrical
Alteration
Status: Issued
Mar 9, 2026
Facility Permit Electrical
Alteration
Status: Issued
Mar 9, 2026
Facility Permit Fire Sprinklers
Alteration
Status: Issued
Mar 3, 2026
Facility Permit Fire Sprinklers
Alteration
Status: Under Inspection
Mar 3, 2026
Facility Permit Fire Sprinklers
Alteration
Status: Issued
Mar 3, 2026
Facility Permit Fire Sprinklers
Alteration
Status: Issued
Mar 3, 2026
Facility Permit Fire Sprinklers
Alteration
Status: Issued
Mar 3, 2026
Facility Permit Fire Sprinklers
Alteration
Status: Issued
Mar 3, 2026
Facility Permit Fire Sprinklers
Alteration
Status: Issued
Mar 3, 2026
Facility Permit Fire Sprinklers
Alteration
Status: Issued
Mar 3, 2026
Facility Permit Fire Sprinklers
Alteration
Status: Issued
Mar 3, 2026
Facility Permit Fire Sprinklers
Alteration
Status: Issued
Feb 25, 2026
Facility Permit Fire Alarms
Alteration
Status: Issued
Feb 12, 2026
Facility Permit Fire Alarms
Alteration
Status: Final
Feb 12, 2026
Facility Permit Mechanical
Alteration
Status: Final
Feb 10, 2026
Facility Permit Plumbing
Alteration
Status: Under Inspection
Feb 4, 2026
Facility Permit Plumbing
Alteration
Status: Issued
Feb 4, 2026
Facility Permit Plumbing
Alteration
Status: Issued
Feb 4, 2026
Facility Permit Plumbing
Alteration
Status: Under Inspection
Feb 4, 2026
Facility Permit Plumbing
Alteration
Status: Issued
Feb 4, 2026
Facility Permit Plumbing
Alteration
Status: Issued
Feb 4, 2026
Facility Permit Plumbing
Alteration
Status: Issued
Feb 4, 2026
Facility Permit Plumbing
Alteration
Status: Issued
Feb 4, 2026
Facility Permit Plumbing
Alteration
Status: Under Inspection
Feb 4, 2026
Facility Permit Plumbing
Alteration
Status: Under Inspection
Jan 26, 2026
Facility Permit Plumbing
Alteration
Status: Final
Jan 26, 2026
Facility Permit Building
Alteration
Status: Issued
Jan 23, 2026
Facility Permit Fire Sprinklers
Alteration
Status: Issued
Jan 20, 2026
Facility Permit Electrical
Alteration
Status: Under Inspection
Jan 6, 2026
Facility Permit Building
Alteration
Status: Issued
Dec 30, 2025
Facility Permit Plumbing
Alteration
Status: Final
Dec 22, 2025
Facility Permit Building
Alteration
Status: Under Inspection
Dec 12, 2025
Facility Permit Plumbing
Alteration
Status: Final
Dec 8, 2025
Facility Permit Building
Alteration
Status: Under Inspection
Dec 4, 2025
Facility Permit Building
Alteration
Status: Issued
Dec 4, 2025
Facility Permit Building
Alteration
Status: Under Inspection
Dec 4, 2025
Facility Permit Building
Alteration
Status: Under Inspection
Dec 4, 2025
Facility Permit Building
Alteration
Status: Under Inspection
Dec 4, 2025
Facility Permit Building
Alteration
Status: Issued
Dec 4, 2025
Facility Permit Building
Alteration
Status: Issued
Dec 4, 2025
Facility Permit Building
Alteration
Status: Issued
Dec 4, 2025
Facility Permit Building
Alteration
Status: Issued
Dec 4, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Dec 1, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Issued
Nov 22, 2025
Facility Permit Fire Sprinklers
Alteration
Status: Final
Nov 20, 2025
Facility Permit Electrical
Alteration
Status: Final
Nov 17, 2025
Facility Permit Electrical
Alteration
Status: Final
Nov 12, 2025
Facility Permit Mechanical
Alteration
Status: Under Inspection
Nov 6, 2025
Facility Permit Fire Alarms
Alteration
Status: Final
Oct 23, 2025
Facility Permit Project
Alteration
Status: Issued
Oct 23, 2025
Facility Permit Project
Alteration
Status: Issued
Oct 21, 2025
Facility Permit Project
Alteration
Status: Issued
Oct 21, 2025
Facility Permit Project
Alteration
Status: Issued
Oct 21, 2025
Facility Permit Project
Alteration
Status: Issued
Oct 21, 2025
Facility Permit Project
Alteration
Status: Issued
Oct 21, 2025
Facility Permit Project
Alteration
Status: Issued
Oct 21, 2025
Facility Permit Project
Alteration
Status: Issued
Oct 21, 2025
Facility Permit Project
Alteration
Status: Issued
Oct 21, 2025
Facility Permit Project
Alteration
Status: Issued
Oct 21, 2025
Facility Permit Fire Sprinklers
Alteration
Status: Final
Oct 13, 2025
Commercial Building Permit Business
Alteration
Status: Final
Oct 10, 2025
Declared cost: $80,000
Commercial Building Permit Business
Alteration
Status: Final
Oct 10, 2025
Declared cost: $40,000
Facility Permit Electrical
Alteration
Status: Final
Oct 2, 2025
Facility Permit Building
Alteration
Status: Under Inspection
Sep 29, 2025
Facility Permit Electrical
Alteration
Status: Final
Sep 25, 2025
Facility Permit Project
Alteration
Status: Issued
Sep 25, 2025
Facility Permit Electrical
Alteration
Status: Final
Sep 25, 2025
Facility Permit Project
Alteration
Status: Issued
Aug 28, 2025
Facility Permit Fire Alarms
Alteration
Status: Final
Aug 18, 2025
Facility Permit Mechanical
Alteration
Status: Final
Aug 8, 2025
Facility Permit Building
Alteration
Status: Final
Jul 31, 2025
Facility Permit Mechanical
Alteration
Status: Final
Jul 31, 2025
Facility Permit Electrical
Alteration
Status: Final
Jul 28, 2025
Facility Permit Fire Sprinklers
Alteration
Status: Final
Jul 23, 2025
Facility Permit Electrical
Alteration
Status: Final
Jul 22, 2025
Facility Permit Plumbing
Alteration
Status: Final
Jul 14, 2025
Facility Permit Building
Alteration
Status: Under Inspection
Jul 1, 2025
Facility Permit Project
Alteration
Status: Issued
Jun 24, 2025
Facility Permit Building
Alteration
Status: Final
Jun 24, 2025
Facility Permit Project
Alteration
Status: Issued
Jun 4, 2025
Commercial Building Permit Business
Alteration
Status: Final
May 28, 2025
Declared cost: $424,600
Facility Permit Project
Alteration
Status: Issued
May 2, 2025
Facility Permit Fire Alarms
Alteration
Status: Final
Mar 13, 2025
Facility Permit Fire Sprinklers
Alteration
Status: Final
Feb 14, 2025
Facility Permit Plumbing
Alteration
Status: Final
Feb 3, 2025
Facility Permit Electrical
Alteration
Status: Final
Jan 30, 2025
Parks Urban Forestry Other
Other
Status: Application - UF
Jan 17, 2025
Facility Permit Building
Alteration
Status: Final
Dec 16, 2024
Facility Permit Project
Alteration
Status: Issued
Nov 19, 2024
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Oct 1, 2024
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Sep 9, 2024
Fire Systems Permit Fire Alarms
Alteration
Status: Final
Sep 5, 2024
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Sep 4, 2024
Fire Systems Permit Fire Sprinklers
Alteration
Status: Final
Aug 26, 2024
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Expired
Aug 7, 2024
Commercial Building Permit Assembly
Alteration
Status: Final
Aug 7, 2024
Declared cost: $174,525
Facility Permit Building
Alteration
Status: Issued
Aug 5, 2024
Facility Permit Fire Alarms
Alteration
Status: Final
Aug 2, 2024
Facility Permit Project
Alteration
Status: Issued
Jul 30, 2024
Facility Permit Mechanical
Alteration
Status: Final
Jul 22, 2024
Facility Permit Building
Alteration
Status: Final
Jul 5, 2024
Facility Permit Plumbing
Alteration
Status: Final
Jul 3, 2024
Facility Permit Mechanical
Alteration
Status: Final
Jul 3, 2024
Facility Permit Electrical
Alteration
Status: Final
Jul 2, 2024
Facility Permit Fire Sprinklers
Alteration
Status: Final
Jul 1, 2024
Facility Permit Electrical
Alteration
Status: Final
Jun 25, 2024
Plumbing Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Jun 20, 2024
Facility Permit Electrical
Alteration
Status: Final
Jun 13, 2024
Facility Permit Fire Alarms
Alteration
Status: Final
Jun 13, 2024
Facility Permit Mechanical
Alteration
Status: Final
Jun 12, 2024
Facility Permit Electrical
Alteration
Status: Final
Jun 7, 2024
Facility Permit Electrical
Alteration
Status: Final
Jun 5, 2024
Facility Permit Project
Alteration
Status: Issued
Jun 5, 2024
Facility Permit Electrical
Alteration
Status: Final
May 29, 2024
Facility Permit Project
Alteration
Status: Issued
May 29, 2024
Facility Permit Fire Alarms
Alteration
Status: Final
May 23, 2024
Facility Permit Fire Sprinklers
Alteration
Status: Final
May 22, 2024
Facility Permit Electrical
Alteration
Status: Final
May 21, 2024
Facility Permit Plumbing
Alteration
Status: Final
May 20, 2024
Facility Permit Building
Alteration
Status: Final
May 16, 2024
Facility Permit Fire Sprinklers
Alteration
Status: Final
May 10, 2024
Facility Permit Electrical
Alteration
Status: Final
May 8, 2024
Facility Permit Project
Alteration
Status: Issued
May 8, 2024
Facility Permit Electrical
Alteration
Status: Final
Apr 30, 2024
Facility Permit Fire Sprinklers
Alteration
Status: Final
Apr 25, 2024
Facility Permit Building
Alteration
Status: Final
Apr 15, 2024
Facility Permit Project
Alteration
Status: Issued
Apr 9, 2024
Facility Permit Plumbing
Alteration
Status: Final
Apr 3, 2024
Facility Permit Project
Alteration
Status: Issued
Feb 27, 2024
Facility Permit Building
Alteration
Status: Under Inspection
Feb 14, 2024
Parks Urban Forestry Removal/Replant
Pp&r
Status: Expired - UF
Nov 30, 2023
Facility Permit Building
Alteration
Status: Final
Nov 15, 2023
Facility Permit Project
Alteration
Status: Issued
Oct 19, 2023
Facility Permit Electrical
Alteration
Status: Final
Oct 13, 2023
Facility Permit Project
Alteration
Status: Issued
Oct 9, 2023
Parks Urban Forestry Removal/Replant
Right-of-way
Status: Expired - UF
Oct 5, 2023
Facility Permit Electrical
Alteration
Status: Final
Sep 19, 2023
Facility Permit Project
Alteration
Status: Issued
Sep 19, 2023
Facility Permit Electrical
Alteration
Status: Final
Sep 6, 2023
Parks Urban Forestry Pruning
Right-of-way
Status: Expired - UF
Jul 12, 2023
Facility Permit Electrical
Alteration
Status: Final
Jun 29, 2023
Facility Permit Electrical
Alteration
Status: Final
Jun 28, 2023
Facility Permit Project
Alteration
Status: Issued
Jun 28, 2023
Facility Permit Electrical
Alteration
Status: Final
Jun 20, 2023
Facility Permit Project
Alteration
Status: Issued
Jun 20, 2023
Facility Permit Electrical
Alteration
Status: Final
Jun 12, 2023
Facility Permit Fire Sprinklers
Alteration
Status: Issued
May 25, 2023
Facility Permit Mechanical
Alteration
Status: Final
May 24, 2023
Facility Permit Plumbing
Alteration
Status: Issued
May 2, 2023
Facility Permit Fire Alarms
Alteration
Status: Final
Apr 18, 2023
Facility Permit Building
Alteration
Status: Issued
Mar 29, 2023
Facility Permit Fire Sprinklers
Alteration
Status: Final
Mar 21, 2023
Facility Permit Building
Alteration
Status: Final
Mar 15, 2023
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Mar 7, 2023
Facility Permit Plumbing
Alteration
Status: Final
Mar 2, 2023
Facility Permit Electrical
Alteration
Status: Final
Feb 23, 2023
Facility Permit Project
Alteration
Status: Issued
Feb 7, 2023
Facility Permit Project
Alteration
Status: Issued
Jan 10, 2023
Facility Permit Mechanical
Alteration
Status: Final
Nov 22, 2022
Facility Permit Fire Alarms
Alteration
Status: Final
Nov 9, 2022
Facility Permit Building
Alteration
Status: Issued
Nov 8, 2022
Facility Permit Project
Alteration
Status: Issued
Oct 27, 2022
Facility Permit Fire Sprinklers
Alteration
Status: Final
Oct 6, 2022
Facility Permit Building
Alteration
Status: Final
Sep 28, 2022
Facility Permit Plumbing
Alteration
Status: Final
Sep 27, 2022
Facility Permit Electrical
Alteration
Status: Final
Sep 21, 2022
Facility Permit Electrical
Alteration
Status: Final
Aug 29, 2022
Facility Permit Building
Alteration
Status: Final
Aug 18, 2022
Parks Urban Forestry Pruning
Private
Status: Expired - UF
Aug 4, 2022
Facility Permit Project
Alteration
Status: Issued
Aug 3, 2022
Facility Permit Mechanical
Alteration
Status: Final
Aug 1, 2022
Facility Permit Building
Alteration
Status: Final
Jul 22, 2022
Facility Permit Project
Alteration
Status: Issued
Jul 11, 2022
Facility Permit Fire Alarms
Alteration
Status: Final
Jun 2, 2022
Facility Permit Fire Sprinklers
Alteration
Status: Final
May 26, 2022
Facility Permit Plumbing
Alteration
Status: Final
May 10, 2022
Facility Permit Electrical
Alteration
Status: Final
Apr 21, 2022
Facility Permit Building
Alteration
Status: Final
Apr 14, 2022
Facility Permit Electrical
Alteration
Status: Final
Apr 13, 2022
Facility Permit Electrical
Alteration
Status: Final
Apr 7, 2022
Facility Permit Project
Alteration
Status: Issued
Feb 23, 2022
Facility Permit Plumbing
Alteration
Status: Final
Jan 24, 2022
Facility Permit Electrical
Alteration
Status: Final
Dec 2, 2021
Facility Permit Electrical
Alteration
Status: Final
Dec 2, 2021
Facility Permit Fire Alarms
Alteration
Status: Final
Nov 30, 2021
Facility Permit Mechanical
Alteration
Status: Final
Oct 12, 2021
Facility Permit Plumbing
Alteration
Status: Final
Oct 6, 2021
Facility Permit Electrical
Alteration
Status: Final
Oct 4, 2021
Facility Permit Project
Alteration
Status: Issued
Oct 4, 2021
Facility Permit Electrical
Alteration
Status: Final
Oct 1, 2021
Facility Permit Fire Sprinklers
Alteration
Status: Final
Sep 30, 2021
Parks Urban Forestry Other
Other
Status: Expired - UF
Sep 20, 2021
Facility Permit Plumbing
Alteration
Status: Final
Sep 17, 2021
Facility Permit Building
Alteration
Status: Final
Sep 17, 2021
Noise Complaint Industrial/Commercial
Mechanical equipment- not hvac
Status: Closed
Sep 15, 2021
Facility Permit Electrical
Alteration
Status: Final
Sep 1, 2021
Facility Permit Fire Alarms
Alteration
Status: Final
Aug 17, 2021
Facility Permit Building
Alteration
Status: Final
Aug 13, 2021
Facility Permit Electrical
Alteration
Status: Final
Aug 12, 2021
Facility Permit Project
Alteration
Status: Issued
Aug 10, 2021
Facility Permit Plumbing
Alteration
Status: Final
Aug 10, 2021
Facility Permit Electrical
Alteration
Status: Final
Aug 10, 2021
Facility Permit Project
Alteration
Status: Issued
Aug 9, 2021
Facility Permit Electrical
Alteration
Status: Final
Aug 4, 2021
Facility Permit Mechanical
Alteration
Status: Final
Jul 30, 2021
Facility Permit Building
Alteration
Status: Final
Jul 30, 2021
Facility Permit Building
Alteration
Status: Final
Jul 28, 2021
Facility Permit Project
Alteration
Status: Issued
Jul 15, 2021
Facility Permit Electrical
Alteration
Status: Final
Jul 13, 2021
Facility Permit Fire Sprinklers
Alteration
Status: Final
Jun 29, 2021
Facility Permit Fire Alarms
Alteration
Status: Final
May 27, 2021
Facility Permit Electrical
Alteration
Status: Final
May 13, 2021
Facility Permit Project
Alteration
Status: Issued
Apr 14, 2021
Facility Permit Electrical
Alteration
Status: Final
Apr 13, 2021

Check permits at another Portland address

Free instant lookup, no signup.

Search Portland permits →
Disclaimer: Permit data comes from Portland's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the Portland building department before buying, selling, or planning work.