Portland, OR · 283 permits on file · 2021–2026

283
Permits on file
2021
First permit
2026
Most recent
$110,000
Declared value (all work)

Permits on file (283)

Ordered most recent first. Data from the city's open data portal.

Facility Permit Building
Alteration
Status: Issued
May 18, 2026
Facility Permit Mechanical
Alteration
Status: Issued
May 18, 2026
Facility Permit Fire Sprinklers
Alteration
Status: Issued
May 14, 2026
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Issued
May 8, 2026
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Issued
Apr 29, 2026
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Issued
Apr 28, 2026
Facility Permit Electrical
Alteration
Status: Issued
Apr 15, 2026
Facility Permit Project
Alteration
Status: Issued
Apr 15, 2026
Facility Permit Electrical
Alteration
Status: Issued
Apr 9, 2026
Facility Permit Fire Sprinklers
Alteration
Status: Under Inspection
Mar 26, 2026
Facility Permit Electrical
Alteration
Status: Under Inspection
Mar 25, 2026
Facility Permit Mechanical
Alteration
Status: Under Inspection
Mar 24, 2026
Facility Permit Building
Alteration
Status: Issued
Mar 23, 2026
Facility Permit Fire Sprinklers
Alteration
Status: Under Inspection
Mar 18, 2026
Facility Permit Project
Alteration
Status: Issued
Mar 18, 2026
Facility Permit Electrical
Alteration
Status: Under Inspection
Mar 17, 2026
Facility Permit Project
Alteration
Status: Issued
Mar 13, 2026
Facility Permit Electrical
Alteration
Status: Under Inspection
Mar 10, 2026
Facility Permit Mechanical
Alteration
Status: Final
Mar 6, 2026
Facility Permit Electrical
Alteration
Status: Under Inspection
Feb 17, 2026
Facility Permit Building
Alteration
Status: Under Inspection
Feb 13, 2026
Facility Permit Electrical
Alteration
Status: Final
Feb 12, 2026
Facility Permit Project
Alteration
Status: Issued
Feb 3, 2026
Facility Permit Building
Alteration
Status: Under Inspection
Jan 26, 2026
Facility Permit Project
Alteration
Status: Issued
Jan 15, 2026
Facility Permit Fire Alarms
Alteration
Status: Issued
Dec 31, 2025
Facility Permit Building
Alteration
Status: Under Inspection
Dec 19, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Under Inspection
Dec 18, 2025
Facility Permit Electrical
Alteration
Status: Final
Dec 16, 2025
Facility Permit Project
Alteration
Status: Issued
Dec 16, 2025
Facility Permit Plumbing
Alteration
Status: Under Inspection
Dec 8, 2025
Facility Permit Electrical
Alteration
Status: Under Inspection
Dec 5, 2025
Facility Permit Project
Alteration
Status: Issued
Nov 5, 2025
Facility Permit Electrical
Alteration
Status: Final
Sep 24, 2025
Facility Permit Fire Sprinklers
Alteration
Status: Final
Sep 24, 2025
Sign Permit Projecting Sign
New sign/awning
Status: Final
Sep 19, 2025
Sign Permit Projecting Sign
New sign/awning
Status: Final
Sep 19, 2025
Sign Permit Marquee Sign
New sign/awning
Status: Final
Sep 19, 2025
Sign Permit Projecting Sign
New sign/awning
Status: Final
Sep 19, 2025
Facility Permit Building
Alteration
Status: Final
Sep 4, 2025
Facility Permit Electrical
Alteration
Status: Final
Aug 28, 2025
Facility Permit Project
Alteration
Status: Issued
Aug 20, 2025
Facility Permit Fire Alarms
Alteration
Status: Final
Aug 14, 2025
Facility Permit Electrical
Alteration
Status: Final
Jul 15, 2025
Facility Permit Project
Alteration
Status: Issued
Jul 15, 2025
Facility Permit Electrical
Alteration
Status: Final
Jun 6, 2025
Facility Permit Electrical
Alteration
Status: Issued
Jun 6, 2025
Facility Permit Project
Alteration
Status: Issued
Jun 6, 2025
Facility Permit Fire Alarms
Alteration
Status: Final
May 30, 2025
Electrical Permit Commercial/Multifamily
New construction
Status: Final
May 28, 2025
Electrical Permit Commercial/Multifamily
New construction
Status: Issued
May 20, 2025
Facility Permit Electrical
Alteration
Status: Final
May 19, 2025
Facility Permit Electrical
Alteration
Status: Final
May 12, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
May 5, 2025
Facility Permit Mechanical
Alteration
Status: Final
Apr 14, 2025
Facility Permit Fire Sprinklers
Alteration
Status: Final
Apr 14, 2025
Facility Permit Fire Alarms
Alteration
Status: Final
Apr 11, 2025
Facility Permit Fire Sprinklers
Alteration
Status: Final
Apr 2, 2025
Facility Permit Electrical
Alteration
Status: Final
Apr 1, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Mar 24, 2025
Facility Permit Plumbing
Alteration
Status: Final
Mar 21, 2025
Facility Permit Electrical
Alteration
Status: Issued
Mar 21, 2025
Facility Permit Project
Alteration
Status: Issued
Mar 21, 2025
Facility Permit Electrical
Alteration
Status: Final
Mar 21, 2025
Facility Permit Project
Alteration
Status: Issued
Mar 21, 2025
Facility Permit Fire Sprinklers
Alteration
Status: Final
Mar 20, 2025
Facility Permit Building
Alteration
Status: Final
Mar 19, 2025
Facility Permit Electrical
Alteration
Status: Final
Mar 17, 2025
Facility Permit Electrical
Alteration
Status: Final
Mar 17, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Mar 10, 2025
Facility Permit Electrical
Alteration
Status: Final
Mar 10, 2025
Facility Permit Plumbing
Alteration
Status: Final
Mar 3, 2025
Facility Permit Building
Alteration
Status: Final
Feb 28, 2025
Facility Permit Fire Alarms
Alteration
Status: Final
Feb 27, 2025
Facility Permit Building
Alteration
Status: Final
Feb 27, 2025
Facility Permit Mechanical
Alteration
Status: Final
Feb 27, 2025
Electrical Permit Commercial/Multifamily
New construction
Status: Final
Feb 26, 2025
Facility Permit Electrical
Alteration
Status: Final
Feb 24, 2025
Facility Permit Electrical
Alteration
Status: Final
Feb 21, 2025
Facility Permit Project
Alteration
Status: Issued
Feb 21, 2025
Facility Permit Project
Alteration
Status: Issued
Feb 20, 2025
Facility Permit Electrical
Alteration
Status: Final
Feb 18, 2025
Facility Permit Building
Alteration
Status: Final
Feb 14, 2025
Facility Permit Building
Alteration
Status: Final
Feb 12, 2025
Facility Permit Fire Alarms
Alteration
Status: Final
Feb 7, 2025
Facility Permit Fire Sprinklers
Alteration
Status: Final
Feb 3, 2025
Facility Permit Electrical
Alteration
Status: Final
Feb 3, 2025
Facility Permit Plumbing
Alteration
Status: Final
Feb 3, 2025
Facility Permit Project
Alteration
Status: Issued
Jan 31, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Jan 25, 2025
Facility Permit Building
Alteration
Status: Issued
Jan 21, 2025
Facility Permit Building
Alteration
Status: Final
Jan 15, 2025
Facility Permit Fire Alarms
Alteration
Status: Final
Jan 14, 2025
Facility Permit Electrical
Alteration
Status: Final
Jan 10, 2025
Facility Permit Project
Alteration
Status: Issued
Jan 8, 2025
Facility Permit Building
Alteration
Status: Final
Dec 23, 2024
Facility Permit Project
Alteration
Status: Issued
Dec 11, 2024
Electrical Permit Commercial/Multifamily
New construction
Status: Final
Nov 25, 2024
Facility Permit Fire Alarms
Alteration
Status: Final
Nov 20, 2024
Facility Permit Electrical
Alteration
Status: Final
Nov 12, 2024
Facility Permit Electrical
Alteration
Status: Final
Nov 7, 2024
Facility Permit Fire Alarms
Alteration
Status: Final
Nov 5, 2024
Facility Permit Plumbing
Alteration
Status: Final
Oct 31, 2024
Facility Permit Electrical
Alteration
Status: Final
Oct 28, 2024
Facility Permit Project
Alteration
Status: Issued
Oct 21, 2024
Facility Permit Fire Sprinklers
Alteration
Status: Final
Oct 11, 2024
Facility Permit Plumbing
Alteration
Status: Final
Oct 10, 2024
Facility Permit Fire Sprinklers
Alteration
Status: Final
Oct 8, 2024
Facility Permit Fire Alarms
Alteration
Status: Final
Oct 1, 2024
Facility Permit Plumbing
Alteration
Status: Final
Sep 30, 2024
Facility Permit Electrical
Alteration
Status: Final
Sep 30, 2024
Facility Permit Electrical
Alteration
Status: Issued
Sep 26, 2024
Facility Permit Project
Alteration
Status: Issued
Sep 26, 2024
Facility Permit Project
Alteration
Status: Issued
Sep 26, 2024
Facility Permit Project
Alteration
Status: Issued
Sep 25, 2024
Facility Permit Electrical
Alteration
Status: Final
Sep 23, 2024
Facility Permit Electrical
Alteration
Status: Final
Sep 23, 2024
Facility Permit Building
Alteration
Status: Final
Sep 19, 2024
Facility Permit Building
Alteration
Status: Final
Sep 17, 2024
Facility Permit Mechanical
Alteration
Status: Final
Sep 17, 2024
Facility Permit Project
Alteration
Status: Issued
Sep 12, 2024
Facility Permit Fire Alarms
Alteration
Status: Final
Sep 5, 2024
Facility Permit Electrical
Alteration
Status: Issued
Aug 21, 2024
Facility Permit Project
Alteration
Status: Issued
Aug 21, 2024
Facility Permit Mechanical
Alteration
Status: Final
Aug 9, 2024
Facility Permit Electrical
Alteration
Status: Issued
Aug 7, 2024
Facility Permit Project
Alteration
Status: Issued
Aug 7, 2024
Facility Permit Building
Alteration
Status: Final
Jul 18, 2024
Facility Permit Project
Alteration
Status: Issued
Jun 28, 2024
Facility Permit Fire Sprinklers
Alteration
Status: Final
Jun 25, 2024
Facility Permit Electrical
Alteration
Status: Final
Jun 24, 2024
Facility Permit Plumbing
Alteration
Status: Final
Jun 6, 2024
Facility Permit Electrical
Alteration
Status: Final
Jun 4, 2024
Facility Permit Building
Alteration
Status: Final
Apr 12, 2024
Facility Permit Project
Alteration
Status: Issued
Apr 8, 2024
Facility Permit Mechanical
Alteration
Status: Final
Feb 29, 2024
Facility Permit Electrical
Alteration
Status: Final
Jan 8, 2024
Facility Permit Project
Alteration
Status: Issued
Jan 8, 2024
Facility Permit Electrical
Alteration
Status: Final
Jan 8, 2024
Facility Permit Project
Alteration
Status: Issued
Jan 8, 2024
Facility Permit Electrical
Alteration
Status: Issued
Dec 22, 2023
Facility Permit Project
Alteration
Status: Issued
Dec 22, 2023
Facility Permit Electrical
Alteration
Status: Final
Dec 19, 2023
Facility Permit Project
Alteration
Status: Issued
Dec 19, 2023
Facility Permit Electrical
Alteration
Status: Final
Dec 6, 2023
Facility Permit Project
Alteration
Status: Issued
Dec 6, 2023
Mechanical Permit Commercial/Multifamily
Addition/alteration/replace (mt)
Status: Final
Nov 20, 2023
Facility Permit Fire Alarms
Alteration
Status: Final
Oct 24, 2023
Sign Permit Projecting Sign
New sign/awning
Status: Final
Oct 24, 2023
Sign Permit Projecting Sign
New sign/awning
Status: Final
Oct 24, 2023
Sign Permit Projecting Sign
New sign/awning
Status: Final
Oct 24, 2023
Sign Permit Projecting Sign
New sign/awning
Status: Final
Oct 24, 2023
Facility Permit Electrical
Alteration
Status: Final
Oct 6, 2023
Facility Permit Project
Alteration
Status: Issued
Oct 6, 2023
Facility Permit Electrical
Alteration
Status: Final
Oct 6, 2023
Facility Permit Fire Sprinklers
Alteration
Status: Final
Oct 4, 2023
Facility Permit Plumbing
Alteration
Status: Final
Oct 2, 2023
Facility Permit Building
Alteration
Status: Final
Sep 5, 2023
Facility Permit Project
Alteration
Status: Issued
Aug 31, 2023
Electrical Permit Commercial/Multifamily
New construction
Status: Final
Aug 14, 2023
Facility Permit Fire Alarms
Alteration
Status: Final
Jun 27, 2023
Facility Permit Electrical
Alteration
Status: Final
Jun 14, 2023
Facility Permit Project
Alteration
Status: Issued
Jun 14, 2023
Facility Permit Electrical
Alteration
Status: Final
May 26, 2023
Facility Permit Fire Sprinklers
Alteration
Status: Final
May 16, 2023
Facility Permit Electrical
Alteration
Status: Final
May 11, 2023
Facility Permit Electrical
Alteration
Status: Final
Mar 28, 2023
Facility Permit Project
Alteration
Status: Issued
Mar 28, 2023
Facility Permit Electrical
Alteration
Status: Final
Mar 28, 2023
Facility Permit Project
Alteration
Status: Issued
Mar 28, 2023
Facility Permit Building
Alteration
Status: Final
Mar 6, 2023
Facility Permit Electrical
Alteration
Status: Final
Mar 6, 2023
Facility Permit Project
Alteration
Status: Issued
Feb 23, 2023
Facility Permit Electrical
Alteration
Status: Final
Feb 15, 2023
Facility Permit Project
Alteration
Status: Issued
Feb 14, 2023
Facility Permit Building
Alteration
Status: Final
Feb 13, 2023
Sign Permit Wall/Fascia Sign
New sign/awning
Status: Issued
Jan 25, 2023
Sign Permit Wall/Fascia Sign
New sign/awning
Status: Issued
Jan 25, 2023
Facility Permit Building
Alteration
Status: Final
Jan 19, 2023
Facility Permit Plumbing
Alteration
Status: Final
Jan 18, 2023
Facility Permit Electrical
Alteration
Status: Final
Jan 13, 2023
Facility Permit Project
Alteration
Status: Issued
Jan 12, 2023
Facility Permit Electrical
Alteration
Status: Final
Jan 9, 2023
Facility Permit Fire Alarms
Alteration
Status: Final
Dec 1, 2022
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Nov 30, 2022
Facility Permit Mechanical
Alteration
Status: Final
Nov 10, 2022
Facility Permit Fire Sprinklers
Alteration
Status: Final
Nov 3, 2022
Facility Permit Building
Alteration
Status: Final
Nov 3, 2022
Facility Permit Electrical
Alteration
Status: Final
Nov 2, 2022
Facility Permit Project
Alteration
Status: Issued
Nov 2, 2022
Facility Permit Mechanical
Alteration
Status: Final
Oct 31, 2022
Facility Permit Fire Sprinklers
Alteration
Status: Final
Oct 4, 2022
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Oct 2, 2022
Facility Permit Building
Alteration
Status: Final
Sep 28, 2022
Facility Permit Plumbing
Alteration
Status: Final
Sep 27, 2022
Facility Permit Electrical
Alteration
Status: Final
Sep 23, 2022
Facility Permit Project
Alteration
Status: Issued
Sep 23, 2022
Facility Permit Electrical
Alteration
Status: Final
Sep 23, 2022
Facility Permit Project
Alteration
Status: Issued
Sep 23, 2022
Facility Permit Electrical
Alteration
Status: Final
Sep 23, 2022
Facility Permit Project
Alteration
Status: Issued
Sep 23, 2022
Facility Permit Electrical
Alteration
Status: Final
Sep 23, 2022
Facility Permit Project
Alteration
Status: Issued
Sep 23, 2022
Facility Permit Electrical
Alteration
Status: Final
Sep 23, 2022
Facility Permit Project
Alteration
Status: Issued
Sep 23, 2022
Facility Permit Electrical
Alteration
Status: Under Inspection
Sep 23, 2022
Facility Permit Project
Alteration
Status: Issued
Sep 23, 2022
Facility Permit Electrical
Alteration
Status: Final
Sep 16, 2022
Facility Permit Fire Sprinklers
Alteration
Status: Final
Sep 15, 2022
Facility Permit Plumbing
Alteration
Status: Final
Aug 30, 2022
Facility Permit Fire Alarms
Alteration
Status: Final
Aug 25, 2022
Facility Permit Fire Alarms
Alteration
Status: Final
Aug 23, 2022
Facility Permit Electrical
Alteration
Status: Final
Aug 22, 2022
Facility Permit Project
Alteration
Status: Issued
Aug 22, 2022
Facility Permit Building
Alteration
Status: Final
Aug 18, 2022
Facility Permit Project
Alteration
Status: Issued
Aug 10, 2022
Facility Permit Building
Alteration
Status: Final
Aug 3, 2022
Facility Permit Building
Alteration
Status: Final
Aug 1, 2022
Facility Permit Electrical
Alteration
Status: Final
Jul 22, 2022
Facility Permit Electrical
Alteration
Status: Final
Jul 22, 2022
Facility Permit Electrical
Alteration
Status: Final
Jul 22, 2022
Facility Permit Project
Alteration
Status: Issued
Jul 19, 2022
Facility Permit Project
Alteration
Status: Issued
Jul 14, 2022
Facility Permit Electrical
Alteration
Status: Final
Jul 8, 2022
Facility Permit Building
Alteration
Status: Final
Jun 23, 2022
Facility Permit Building
Alteration
Status: Final
Jun 8, 2022
Facility Permit Building
Alteration
Status: Final
Jun 2, 2022
Facility Permit Building
Alteration
Status: Final
May 6, 2022
Facility Permit Building
Alteration
Status: Final
May 3, 2022
Facility Permit Building
Alteration
Status: Final
May 2, 2022
Facility Permit Project
Alteration
Status: Issued
Apr 29, 2022
Facility Permit Electrical
Alteration
Status: Final
Apr 29, 2022
Facility Permit Electrical
Alteration
Status: Final
Apr 28, 2022
Facility Permit Project
Alteration
Status: Issued
Apr 28, 2022
Facility Permit Fire Alarms
Alteration
Status: Final
Apr 22, 2022
Land Use Review Type 2 procedure
Dz - design review
Status: Recorded
Apr 22, 2022
Facility Permit Project
Alteration
Status: Issued
Apr 21, 2022
Facility Permit Plumbing
Alteration
Status: Final
Apr 19, 2022
Facility Permit Fire Sprinklers
Alteration
Status: Final
Apr 15, 2022
Facility Permit Electrical
Alteration
Status: Final
Apr 12, 2022
Facility Permit Fire Sprinklers
Alteration
Status: Final
Apr 8, 2022
Facility Permit Fire Alarms
Alteration
Status: Final
Mar 30, 2022
Facility Permit Building
Alteration
Status: Under Inspection
Mar 16, 2022
Facility Permit Building
Alteration
Status: Final
Mar 8, 2022
Facility Permit Mechanical
Alteration
Status: Final
Mar 8, 2022
Facility Permit Project
Alteration
Status: Issued
Mar 4, 2022
Facility Permit Electrical
Alteration
Status: Final
Mar 3, 2022
Facility Permit Electrical
Alteration
Status: Final
Feb 25, 2022
Facility Permit Project
Alteration
Status: Issued
Feb 25, 2022
Facility Permit Electrical
Alteration
Status: Final
Feb 24, 2022
Facility Permit Project
Alteration
Status: Issued
Feb 23, 2022
Facility Permit Electrical
Alteration
Status: Final
Feb 22, 2022
Facility Permit Electrical
Alteration
Status: Final
Feb 22, 2022
Facility Permit Fire Sprinklers
Alteration
Status: Final
Feb 16, 2022
Facility Permit Mechanical
Alteration
Status: Final
Feb 1, 2022
Facility Permit Plumbing
Alteration
Status: Final
Jan 28, 2022
Facility Permit Building
Alteration
Status: Final
Jan 6, 2022
Facility Permit Project
Alteration
Status: Issued
Dec 14, 2021
Facility Permit Project
Alteration
Status: Issued
Dec 9, 2021
Facility Permit Electrical
Alteration
Status: Final
Dec 9, 2021
Facility Permit Project
Alteration
Status: Issued
Dec 9, 2021
Facility Permit Building
Alteration
Status: Final
Dec 2, 2021
Facility Permit Project
Alteration
Status: Issued
Nov 23, 2021
Facility Permit Project
Alteration
Status: Issued
Nov 5, 2021
Facility Permit Project
Alteration
Status: Issued
Nov 3, 2021
Facility Permit Mechanical
Alteration
Status: Final
Sep 30, 2021
Facility Permit Plumbing
Alteration
Status: Final
Sep 28, 2021
Facility Permit Building
Alteration
Status: Final
Sep 17, 2021
Facility Permit Electrical
Alteration
Status: Final
Sep 14, 2021
Facility Permit Fire Alarms
Alteration
Status: Final
Sep 3, 2021
Facility Permit Project
Alteration
Status: Issued
Sep 2, 2021
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Aug 31, 2021
Facility Permit Electrical
Alteration
Status: Final
Aug 30, 2021
Facility Permit Project
Alteration
Status: Issued
Aug 30, 2021
Facility Permit Electrical
Alteration
Status: Final
Aug 18, 2021
Facility Permit Building
Alteration
Status: Final
Aug 17, 2021
Facility Permit Electrical
Alteration
Status: Final
Aug 6, 2021
Facility Permit Project
Alteration
Status: Issued
Aug 6, 2021
Facility Permit Building
Alteration
Status: Final
Jul 21, 2021
Facility Permit Project
Alteration
Status: Issued
Jul 16, 2021
Commercial Building Permit Storage
Alteration
Status: Expired
May 4, 2021
Declared cost: $110,000
Facility Permit Electrical
Alteration
Status: Final
Apr 14, 2021
Facility Permit Project
Alteration
Status: Issued
Apr 14, 2021

Check permits at another Portland address

Free instant lookup, no signup.

Search Portland permits →
Disclaimer: Permit data comes from Portland's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the Portland building department before buying, selling, or planning work.