Permit history for 12000 SW 49th Ave

Portland, OR · 229 permits on file · 2021–2026

229
Permits on file
2021
First permit
2026
Most recent
$40,192,701
Declared value (all work)

Permits on file (229)

Ordered most recent first. Data from the city's open data portal.

Facility Permit Electrical
Alteration
Status: Issued
May 22, 2026
Facility Permit Electrical
Alteration
Status: Issued
May 22, 2026
Facility Permit Project
Alteration
Status: Issued
May 21, 2026
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Issued
May 20, 2026
Plumbing Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Issued
May 5, 2026
Facility Permit Fire Sprinklers
Alteration
Status: Issued
May 1, 2026
Facility Permit Fire Sprinklers
Alteration
Status: Issued
Apr 30, 2026
Facility Permit Building
Alteration
Status: Issued
Apr 29, 2026
Facility Permit Mechanical
Alteration
Status: Issued
Apr 29, 2026
Facility Permit Building
Alteration
Status: Issued
Apr 16, 2026
Facility Permit Mechanical
Alteration
Status: Issued
Apr 16, 2026
Facility Permit Electrical
Alteration
Status: Final
Apr 2, 2026
Facility Permit Building
Alteration
Status: Issued
Mar 23, 2026
Facility Permit Mechanical
Alteration
Status: Issued
Mar 23, 2026
Facility Permit Project
Alteration
Status: Issued
Mar 19, 2026
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Mar 17, 2026
Facility Permit Electrical
Alteration
Status: Final
Mar 17, 2026
Facility Permit Electrical
Alteration
Status: Final
Mar 16, 2026
Fire Systems Permit Fire Alarms
Alteration
Status: Under Inspection
Mar 5, 2026
Facility Permit Project
Alteration
Status: Issued
Mar 2, 2026
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Issued
Feb 20, 2026
Facility Permit Project
Alteration
Status: Issued
Feb 2, 2026
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Jan 30, 2026
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Issued
Jan 15, 2026
Facility Permit Electrical
Alteration
Status: Under Inspection
Jan 12, 2026
Facility Permit Fire Sprinklers
Alteration
Status: Under Inspection
Dec 19, 2025
Facility Permit Plumbing
Alteration
Status: Final
Dec 18, 2025
Facility Permit Building
Alteration
Status: Under Inspection
Oct 30, 2025
Facility Permit Mechanical
Alteration
Status: Final
Oct 30, 2025
Facility Permit Project
Alteration
Status: Issued
Sep 29, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Jul 1, 2025
Zoning Permit LUR Condition Compliance
Commercial
Status: Final
Jun 26, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Jun 20, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Jun 11, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Jun 6, 2025
Fire Systems Permit Fire Sprinklers
Removal
Status: Final
Jun 5, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
May 20, 2025
Parks Urban Forestry Removal/Replant
Private
Status: Issued - UF
May 20, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
May 14, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
May 2, 2025
Facility Permit Plumbing
Alteration
Status: Final
Apr 21, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Mar 14, 2025
Commercial Building Permit Utility
Alteration
Status: Final
Mar 5, 2025
Declared cost: $102,756
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Jan 14, 2025
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Oct 17, 2024
Facility Permit Electrical
Alteration
Status: Final
Aug 26, 2024
Facility Permit Fire Alarms
Alteration
Status: Issued
Aug 19, 2024
Facility Permit Fire Alarms
Alteration
Status: Issued
Aug 19, 2024
Facility Permit Fire Alarms
Alteration
Status: Issued
Aug 19, 2024
Facility Permit Fire Alarms
Alteration
Status: Issued
Aug 19, 2024
Facility Permit Fire Alarms
Alteration
Status: Issued
Aug 19, 2024
Facility Permit Fire Alarms
Alteration
Status: Issued
Aug 19, 2024
Facility Permit Fire Alarms
Alteration
Status: Issued
Aug 19, 2024
Facility Permit Fire Alarms
Alteration
Status: Issued
Aug 19, 2024
Facility Permit Fire Alarms
Alteration
Status: Issued
Aug 19, 2024
Facility Permit Fire Alarms
Alteration
Status: Issued
Aug 15, 2024
Facility Permit Fire Alarms
Alteration
Status: Issued
Aug 15, 2024
Facility Permit Fire Sprinklers
Alteration
Status: Final
Aug 9, 2024
Facility Permit Building
Alteration
Status: Issued
Aug 2, 2024
Facility Permit Mechanical
Alteration
Status: Under Inspection
Aug 2, 2024
Facility Permit Building
Alteration
Status: Final
Aug 1, 2024
Facility Permit Project
Alteration
Status: Issued
Jul 31, 2024
Facility Permit Project
Alteration
Status: Issued
Jul 31, 2024
Facility Permit Project
Alteration
Status: Issued
Jul 31, 2024
Facility Permit Project
Alteration
Status: Issued
Jul 31, 2024
Facility Permit Project
Alteration
Status: Issued
Jul 31, 2024
Facility Permit Project
Alteration
Status: Issued
Jul 31, 2024
Facility Permit Project
Alteration
Status: Issued
Jul 31, 2024
Facility Permit Project
Alteration
Status: Issued
Jul 31, 2024
Facility Permit Project
Alteration
Status: Issued
Jul 31, 2024
Facility Permit Project
Alteration
Status: Issued
Jul 31, 2024
Facility Permit Project
Alteration
Status: Issued
Jul 31, 2024
Facility Permit Project
Alteration
Status: Issued
Jul 17, 2024
Facility Permit Building
Alteration
Status: Final
Jul 16, 2024
Facility Permit Building
Alteration
Status: Final
Jun 12, 2024
Facility Permit Fire Alarms
Alteration
Status: Final
May 29, 2024
Facility Permit Building
Alteration
Status: Final
May 9, 2024
Facility Permit Building
Alteration
Status: Final
May 9, 2024
Facility Permit Electrical
Alteration
Status: Final
May 9, 2024
Mechanical Permit Commercial/Multifamily
Addition/alteration/replace (mt)
Status: Final
Apr 18, 2024
Facility Permit Building
Alteration
Status: Final
Mar 27, 2024
Facility Permit Building
Alteration
Status: Final
Mar 27, 2024
Facility Permit Electrical
Alteration
Status: Final
Mar 13, 2024
Facility Permit Electrical
Alteration
Status: Final
Mar 13, 2024
Facility Permit Electrical
Alteration
Status: Final
Mar 12, 2024
Facility Permit Project
Alteration
Status: Issued
Mar 12, 2024
Facility Permit Electrical
Alteration
Status: Issued
Mar 8, 2024
Commercial Building Permit Utility
Alteration
Status: Under Inspection
Mar 7, 2024
Declared cost: $15,000
Facility Permit Building
Alteration
Status: Final
Feb 23, 2024
Facility Permit Building
Alteration
Status: Final
Feb 23, 2024
Facility Permit Building
Alteration
Status: Final
Jan 24, 2024
Facility Permit Building
Alteration
Status: Final
Dec 12, 2023
Facility Permit Building
Alteration
Status: Final
Dec 12, 2023
Facility Permit Mechanical
Alteration
Status: Issued
Nov 20, 2023
Facility Permit Building
Alteration
Status: Issued
Nov 20, 2023
Facility Permit Mechanical
Alteration
Status: Final
Nov 20, 2023
Facility Permit Building
Alteration
Status: Under Inspection
Nov 20, 2023
Facility Permit Mechanical
Alteration
Status: Final
Nov 20, 2023
Facility Permit Building
Alteration
Status: Under Inspection
Nov 20, 2023
Sign Permit Freestanding Sign
New sign/awning
Status: Final
Nov 8, 2023
Sign Permit Freestanding Sign
New sign/awning
Status: Final
Nov 8, 2023
Sign Permit Freestanding Sign
New sign/awning
Status: Final
Nov 8, 2023
Sign Permit Freestanding Sign
New sign/awning
Status: Final
Nov 8, 2023
Sign Permit Freestanding Sign
New sign/awning
Status: Final
Nov 8, 2023
Sign Permit Wall/Fascia Sign
New sign/awning
Status: Issued
Nov 8, 2023
Sign Permit Wall/Fascia Sign
New sign/awning
Status: Issued
Nov 8, 2023
Sign Permit Wall/Fascia Sign
New sign/awning
Status: Issued
Nov 8, 2023
Sign Permit Wall/Fascia Sign
New sign/awning
Status: Issued
Nov 8, 2023
Sign Permit Wall/Fascia Sign
New sign/awning
Status: Issued
Nov 8, 2023
Sign Permit Wall/Fascia Sign
New sign/awning
Status: Issued
Nov 8, 2023
Sign Permit Wall/Fascia Sign
New sign/awning
Status: Issued
Nov 8, 2023
Sign Permit Wall/Fascia Sign
New sign/awning
Status: Issued
Nov 8, 2023
Sign Permit Freestanding Sign
New sign/awning
Status: Final
Nov 8, 2023
Sign Permit Freestanding Sign
New sign/awning
Status: Final
Nov 8, 2023
Sign Permit Freestanding Sign
New sign/awning
Status: Final
Nov 8, 2023
Sign Permit Freestanding Sign
New sign/awning
Status: Final
Nov 2, 2023
Facility Permit Electrical
Alteration
Status: Final
Oct 25, 2023
Commercial Building Permit Utility
Alteration
Status: Final
Sep 1, 2023
Declared cost: $25,000
Plumbing Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Aug 30, 2023
Commercial Building Permit Storage
Demolition
Status: Final
Aug 21, 2023
Declared cost: $3,000
Commercial Building Permit Business
Demolition
Status: Final
Aug 21, 2023
Declared cost: $9,000
Commercial Building Permit Business
Demolition
Status: Final
Aug 21, 2023
Declared cost: $48,000
Commercial Building Permit Business
Demolition
Status: Final
Aug 21, 2023
Declared cost: $48,000
Commercial Building Permit Business
Demolition
Status: Final
Aug 21, 2023
Declared cost: $48,000
Commercial Building Permit Business
Demolition
Status: Final
Aug 21, 2023
Declared cost: $48,000
Commercial Building Permit Business
Demolition
Status: Final
Aug 21, 2023
Declared cost: $48,000
Commercial Building Permit Business
Demolition
Status: Final
Aug 21, 2023
Declared cost: $48,000
Plumbing Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Aug 18, 2023
Facility Permit Plumbing
Alteration
Status: Final
Aug 14, 2023
Facility Permit Project
Alteration
Status: Issued
Aug 14, 2023
Facility Permit Electrical
Master
Status: Final
Aug 8, 2023
Facility Permit Electrical
Master
Status: Final
Aug 8, 2023
Facility Permit Electrical
Master
Status: Final
Aug 8, 2023
Commercial Building Permit Utility
Alteration
Status: Final
Aug 4, 2023
Declared cost: $15,000
Commercial Building Permit Utility
Alteration
Status: Final
Jun 23, 2023
Declared cost: $32,000
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
May 31, 2023
Commercial Building Permit Assembly
Addition
Status: Final
Apr 25, 2023
Declared cost: $25,000
Facility Permit Building
Alteration
Status: Final
Apr 24, 2023
Facility Permit Mechanical
Alteration
Status: Final
Apr 24, 2023
Commercial Building Permit Assembly
Addition
Status: Final
Apr 13, 2023
Declared cost: $28,000
Commercial Building Permit Assembly
Addition
Status: Final
Apr 7, 2023
Mechanical Permit Commercial/Multifamily
Addition/alteration/replace (mt)
Status: Final
Apr 7, 2023
Commercial Building Permit Assembly
Addition
Status: Final
Mar 28, 2023
Declared cost: $45,000
Facility Permit Project
Alteration
Status: Issued
Mar 15, 2023
Facility Permit Project
Alteration
Status: Issued
Mar 15, 2023
Facility Permit Project
Alteration
Status: Issued
Mar 15, 2023
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Mar 14, 2023
Commercial Building Permit Assembly
Addition
Status: Final
Feb 27, 2023
Declared cost: $35,000
Commercial Building Permit Assembly
Addition
Status: Final
Feb 14, 2023
Declared cost: $20,000
Fire Systems Permit Hazardous Materials
New
Status: Final
Feb 9, 2023
Facility Permit Project
Alteration
Status: Issued
Feb 1, 2023
Commercial Building Permit Assembly
Addition
Status: Final
Jan 10, 2023
Declared cost: $25,000
Commercial Building Permit Assembly
Addition
Status: Final
Jan 6, 2023
Declared cost: $25,000
Commercial Building Permit Assembly
Addition
Status: Final
Jan 6, 2023
Declared cost: $25,000
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Jan 6, 2023
Commercial Building Permit Utility
Alteration
Status: Final
Jan 4, 2023
Declared cost: $15,000
Fire Systems Permit Fire Alarms
Alteration
Status: Final
Dec 14, 2022
Commercial Building Permit Assembly
Addition
Status: Final
Nov 2, 2022
Declared cost: $435,945
Commercial Building Permit Assembly
Addition
Status: Final
Oct 20, 2022
Declared cost: $50,000
Commercial Building Permit Assembly
Addition
Status: Final
Oct 20, 2022
Declared cost: $25,000
Commercial Building Permit Assembly
Addition
Status: Final
Oct 20, 2022
Declared cost: $25,000
Commercial Building Permit Assembly
Addition
Status: Final
Oct 20, 2022
Declared cost: $25,000
Commercial Building Permit Assembly
Addition
Status: Final
Oct 10, 2022
Declared cost: $49,000
Fire Systems Permit Fire Sprinklers
Alteration
Status: Final
Aug 25, 2022
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Aug 8, 2022
Commercial Building Permit Assembly
Addition
Status: Final
Jul 23, 2022
Declared cost: $90,000
Commercial Building Permit Assembly
Addition
Status: Final
Jul 5, 2022
Declared cost: $60,000
Commercial Building Permit Assembly
Addition
Status: Final
Jun 21, 2022
Declared cost: $692,000
Commercial Building Permit Assembly
Addition
Status: Final
May 18, 2022
Declared cost: $23,000
Commercial Building Permit Assembly
Addition
Status: Final
May 18, 2022
Commercial Building Permit Assembly
Addition
Status: Final
May 12, 2022
Declared cost: $445,000
Commercial Building Permit Assembly
Addition
Status: Final
Apr 29, 2022
Declared cost: $250,000
Commercial Building Permit Utility
Alteration
Status: Expired
Apr 19, 2022
Declared cost: $15,000
Commercial Building Permit Assembly
Addition
Status: Final
Mar 11, 2022
Declared cost: $50,000
Plumbing Permit Commercial/Multifamily
New construction
Status: Final
Mar 10, 2022
Commercial Building Permit Assembly
Addition
Status: Final
Feb 1, 2022
Declared cost: $15,000
Electrical Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Feb 1, 2022
Plumbing Permit Commercial/Multifamily
Addition/alteration/replacement
Status: Final
Jan 26, 2022
Facility Permit Building
Alteration
Status: Issued
Jan 26, 2022
Commercial Building Permit Assembly
Addition
Status: Final
Jan 21, 2022
Declared cost: $310,000
Mechanical Permit Commercial/Multifamily
Addition/alteration/replace (mt)
Status: Final
Jan 21, 2022
Commercial Building Permit Assembly
Addition
Status: Final
Oct 27, 2021
Declared cost: $36,000,000
Mechanical Permit Commercial/Multifamily
Addition/alteration/replace (mt)
Status: Final
Oct 27, 2021
Facility Permit Fire Alarms
Alteration
Status: Final
Oct 15, 2021
Facility Permit Building
Alteration
Status: Issued
Oct 4, 2021
Facility Permit Building
Alteration
Status: Issued
Sep 23, 2021
Facility Permit Fire Alarms
Alteration
Status: Final
Sep 23, 2021
Facility Permit Building
Alteration
Status: Issued
Sep 17, 2021
Facility Permit Mechanical
Alteration
Status: Issued
Aug 23, 2021
Facility Permit Electrical
Alteration
Status: Final
Aug 21, 2021
Facility Permit Project
Alteration
Status: Issued
Aug 18, 2021
Facility Permit Plumbing
Alteration
Status: Final
Aug 16, 2021
Facility Permit Building
Alteration
Status: Issued
Aug 12, 2021
Facility Permit Building
Alteration
Status: Issued
Aug 12, 2021
Facility Permit Fire Sprinklers
Alteration
Status: Issued
Aug 11, 2021
Facility Permit Fire Sprinklers
Alteration
Status: Final
Aug 10, 2021
Facility Permit Building
Alteration
Status: Issued
Aug 10, 2021
Facility Permit Fire Alarms
Alteration
Status: Final
Aug 5, 2021
Facility Permit Electrical
Alteration
Status: Final
Aug 5, 2021
Facility Permit Building
Alteration
Status: Under Inspection
Aug 4, 2021
Facility Permit Mechanical
Alteration
Status: Final
Aug 4, 2021
Facility Permit Building
Alteration
Status: Issued
Jul 29, 2021
Facility Permit Electrical
Alteration
Status: Final
Jul 27, 2021
Facility Permit Electrical
Alteration
Status: Final
Jul 9, 2021
Facility Permit Electrical
Alteration
Status: Final
Jul 7, 2021
Facility Permit Fire Sprinklers
Alteration
Status: Final
Jul 1, 2021
Facility Permit Electrical
Alteration
Status: Final
Jun 24, 2021
Facility Permit Electrical
Alteration
Status: Final
Jun 17, 2021
Facility Permit Fire Sprinklers
Alteration
Status: Final
Jun 16, 2021
Facility Permit Building
Alteration
Status: Final
Jun 16, 2021
Facility Permit Building
Alteration
Status: Issued
Jun 14, 2021
Facility Permit Building
Alteration
Status: Final
Jun 7, 2021
Facility Permit Building
Alteration
Status: Final
Jun 3, 2021
Facility Permit Mechanical
Alteration
Status: Final
Jun 3, 2021
Facility Permit Project
Alteration
Status: Issued
Jun 3, 2021
Facility Permit Fire Alarms
Alteration
Status: Final
Jun 3, 2021
Facility Permit Building
Alteration
Status: Issued
May 28, 2021
Facility Permit Electrical
Alteration
Status: Final
May 19, 2021
Facility Permit Building
Alteration
Status: Issued
May 18, 2021
Facility Permit Mechanical
Alteration
Status: Final
May 14, 2021
Facility Permit Building
Alteration
Status: Final
May 14, 2021
Facility Permit Electrical
Alteration
Status: Final
May 13, 2021
Facility Permit Fire Alarms
Alteration
Status: Final
May 13, 2021
Facility Permit Plumbing
Alteration
Status: Final
May 10, 2021
Facility Permit Project
Alteration
Status: Issued
May 7, 2021
Facility Permit Project
Alteration
Status: Issued
May 5, 2021
Facility Permit Fire Sprinklers
Alteration
Status: Final
May 5, 2021
Commercial Building Permit Assembly
Addition
Status: Final
Apr 26, 2021
Declared cost: $900,000
Facility Permit Building
Alteration
Status: Final
Apr 15, 2021

Check permits at another Portland address

Free instant lookup, no signup.

Search Portland permits →
Disclaimer: Permit data comes from Portland's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the Portland building department before buying, selling, or planning work.