Building & Development Application Existing (alteration/addition)
Status: Issued
Apr 23, 2026
ELECTRICAL MINOR ALTERATION
Contractor: Vantage Corporation
Status: Issued
Apr 21, 2026
Building & Development Application Existing (alteration/addition)
Replacement of existing wooden fire escape with new exterior exit stairway
Status: Issued
Apr 7, 2026
Building & Development Application Existing (alteration/addition)
Status: Issued
Mar 4, 2026
Building & Development Application Existing (alteration/addition)
Interior alteration to the exising tenant space to update game rooms. work includes new wall partitions and finishes
Status: Issued
Feb 20, 2026
Building & Development Application New Construction
Installation of playground and site furnishings with landscaping.
Status: Issued
Jan 13, 2026
Building & Development Application Existing (alteration/addition)
Status: Issued
Jan 6, 2026
Building & Development Application Existing (alteration/addition)
Pli not regulating - roza only
Status: Issued
Jan 2, 2026
Building & Development Application Existing (alteration/addition)
Installation of 24 feet dia above ground pool in rear yard of single family dwelling
Status: Issued
Jan 2, 2026
Building & Development Application Existing (alteration/addition)
Status: Issued
Dec 1, 2025
Building & Development Application Existing (alteration/addition)
Status: Issued
Nov 26, 2025
Building & Development Application Existing (alteration/addition)
Status: Issued
Nov 25, 2025
ELECTRICAL NEW CONSTRUCTION
Electrical power and lighting for park including bandshell, playground, and site landscaping
Contractor: Sargent Electric Co
Status: Completed
Nov 17, 2025
Building & Development Application Existing (alteration/addition)
Demo detached single car garage on adjacent lot facing rear street
Status: Issued
Nov 14, 2025
Building & Development Application New Construction
Installation of pre-fabricated bandshell roof canopy and slab-on-grade stage structure
Status: Completed
Nov 12, 2025
Building & Development Application New Construction
Construction of new free standing pavillion and sitework in center of square
Status: Issued
Oct 27, 2025
Building & Development Application Existing (alteration/addition)
Repairs to open parking garage, including concrete patches, steel repairs/replacement, waterproofing, and repainting of parking stall markings.
Status: Issued
Oct 6, 2025
ELECTRICAL MINOR ALTERATION
Replacement of playground, site work, and construction of new pavillion in north side yard play area
Status: Issued
Oct 3, 2025
Land Operations Permit
Sitework, regrading, landscaping, and paving associated with addition and alteration to convert existing school into senior lofts
Status: Issued
Oct 1, 2025
Building & Development Application Existing (alteration/addition)
Status: Completed
Oct 1, 2025
Building & Development Application Existing (alteration/addition)
Status: Issued
Sep 26, 2025
Building & Development Application Existing (alteration/addition)
Status: Completed
Sep 12, 2025
Building & Development Application Existing (alteration/addition)
Status: Issued
Sep 11, 2025
ELECTRICAL NEW CONSTRUCTION
Temp. power for construction trailer.
Contractor: Chiusano Joseph J
Status: Completed
Sep 8, 2025
ELECTRICAL MINOR ALTERATION
Status: Issued
Aug 7, 2025
MECHANICAL ADDITION / ALTERATION
Installation of gas fired heaters and piping at existing garage
Contractor: J.A. Sauer Co
Status: Completed
Jul 31, 2025
Suppression System Permit NEW SYSTEM
Installation of suppression system for type i hood
Status: Completed
Jul 29, 2025
Plan Review Meeting
Meeting for load test info
Status: Completed
Jul 25, 2025
Building & Development Application Existing (alteration/addition)
Parking pad (holding a surcharge) at side of existing single-family dwelling
Status: Issued
Jul 25, 2025
Building & Development Application Existing (alteration/addition)
Alteration to existing play area including new playground, trellis, site work, and construction of new pavillion in north side yard play area
Status: Issued
Jun 18, 2025
Demolition Permit PARTIAL DEMOLITION
Demo wing of building
Status: Issued
Jun 17, 2025
ELECTRICAL MINOR ALTERATION
Status: Issued
May 14, 2025
Building & Development Application Existing (alteration/addition)
Status: Issued
May 14, 2025
Building & Development Application Existing (alteration/addition)
Status: Issued
May 13, 2025
Land Operations Permit
Installation of trail system that includes six parking spaces (one accessible).
Status: Completed
May 12, 2025
Building & Development Application Existing (alteration/addition)
Status: Issued
May 1, 2025
ELECTRICAL ADDITION / ALTERATION
Installation of new service and panel to supply existing parking lighting
Status: Completed
Apr 17, 2025
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Mar 27, 2025
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Mar 27, 2025
Building & Development Application Existing (alteration/addition)
Status: Issued
Mar 27, 2025
Demolition Permit CITY FUNDED DEMOLITION
1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing. 2. contract term 10 days. start date: 3/24/2025, 3:00 pm. contract ending date: 4/3/2025 3:00 pm 3. achd
Status: Completed
Mar 25, 2025
Demolition Permit COMPLETE DEMOLITION
Demo 2 story attached house + basement, te attached house is to be demo'd under dp-2025-01283
Status: Completed
Mar 21, 2025
Demolition Permit COMPLETE DEMOLITION
Demo 2 story attached house + basement, te attached house is to be demo'd under dp-2025-01282
Status: Completed
Mar 21, 2025
Demolition Permit COMPLETE DEMOLITION
Demo 2 story single family dwelling
Status: Completed
Mar 18, 2025
Building & Development Application Existing (alteration/addition)
Status: Completed
Mar 18, 2025
Demolition Permit COMPLETE DEMOLITION
Demo single story tire servce shop
Status: Completed
Mar 10, 2025
Building & Development Application New Construction
Site work to install accessory parking lot and 6 foot dumpster enclosure(not regulated by pli)
Status: Issued
Mar 7, 2025
Demolition Permit COMPLETE DEMOLITION
Demo 2 story + basement masonry building and detached single story 2 car garage
Status: Issued
Mar 5, 2025
Demolition Permit COMPLETE DEMOLITION
Demo existing 2 story + basement masonry house
Status: Completed
Feb 14, 2025
Building & Development Application New Construction
Status: Completed
Feb 14, 2025
Demolition Permit COMPLETE DEMOLITION
Deno house and detached garage at rear
Status: Completed
Feb 14, 2025
Building & Development Application Existing (alteration/addition)
Status: Completed
Feb 12, 2025
Building & Development Application Existing (alteration/addition)
Construction of two-story wood-framed addition above existing one-story masonry accessory structure including interior alterations to existing structure. work includes selective demolition, structural alterations to existing, new walls, cei
Status: Issued
Feb 3, 2025
Demolition Permit COMPLETE DEMOLITION
Demo 3 story + basement 3 unit dwelling
Status: Completed
Jan 24, 2025
Demolition Permit COMPLETE DEMOLITION
Demo 3 story + basement masonry house
Status: Completed
Jan 24, 2025
Demolition Permit COMPLETE DEMOLITION
Demo 2 story house
Contractor: Hale Demolition
Status: Completed
Jan 15, 2025
Suppression System Permit MINOR ALTERATION
Relocated sprinkler heads that do not affect coverage area
Status: Completed
Jan 10, 2025
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4.
Status: Completed
Jan 10, 2025
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4.
Status: Completed
Jan 10, 2025
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4
Status: Completed
Jan 10, 2025
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4.
Status: Completed
Jan 10, 2025
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4.
Status: Completed
Jan 10, 2025
Demolition Permit COMPLETE DEMOLITION
Demo brick building, adjacent building to be demolished under dp-2024-13733.
Status: Completed
Jan 8, 2025
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4.
Status: Completed
Jan 7, 2025
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4.
Status: Completed
Jan 7, 2025
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4.
Status: Completed
Jan 7, 2025
Building & Development Application New Construction
Replace banner with new; 15'-0" x 5'-4" fabric exterior wall banner
Status: Issued
Jan 3, 2025
Demolition Permit COMPLETE DEMOLITION
Demo freestanding house
Contractor: Chadash LLC
Status: Issued
Jan 2, 2025
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps, accessory structures and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to
Status: Completed
Dec 20, 2024
Building & Development Application Existing (alteration/addition)
Status: Issued
Dec 20, 2024
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps, accessory structures and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to
Status: Completed
Dec 20, 2024
Demolition Permit COMPLETE DEMOLITION
Demo single story masonry building
Status: Completed
Dec 20, 2024
Demolition Permit COMPLETE DEMOLITION
Demo single story masonry building
Status: Completed
Dec 20, 2024
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4
Status: Completed
Dec 17, 2024
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4
Status: Completed
Dec 17, 2024
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing. 2. contract term 10 days. start date: 12/13/2024, 3:00 pm. contract ending date:
Status: Completed
Dec 14, 2024
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing. 2. contract term 10 days. start date: 12/6/2024, 3:00 pm. contract ending date: 1
Status: Completed
Dec 8, 2024
Demolition Permit COMPLETE DEMOLITION
Demo house attached to adj house to be demo'd under dp-2024-12797.
Status: Completed
Dec 3, 2024
Demolition Permit COMPLETE DEMOLITION
Complete demolition of three-story building with basement. the front and portions of the side foundation walls to remain.
Status: Completed
Dec 3, 2024
Demolition Permit COMPLETE DEMOLITION
Demo house attached to adj house to be demo'd under dp-2024-13429.
Status: Completed
Dec 3, 2024
Demolition Permit COMPLETE DEMOLITION
Demo 2 story + basement house attached to adj house at 4788 aloe st
Status: Completed
Dec 3, 2024
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. this bid agreement is paid in part or full with american rescue plan act (arpa) funds, all federal regulations apply. 2. remove all garbage, debris, vegetation, concrete slabs, accessory structures, steps, and fe
Status: Completed
Nov 27, 2024
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. this bid agreement is paid in part or full with american rescue plan act (arpa) funds, all federal regulations apply. 2. remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and
Status: Issued
Nov 27, 2024
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. this bid agreement is paid in part or full with american rescue plan act (arpa) funds, all federal regulations apply. 2. remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and
Status: Issued
Nov 27, 2024
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. this bid agreement is paid in part or full with american rescue plan act (arpa) funds, all federal regulations apply. 2. remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and
Status: Completed
Nov 27, 2024
Demolition Permit COMPLETE DEMOLITION
Complete demolition of attached structure
Contractor: Remodel Smart LLC
Status: Issued
Nov 22, 2024
Demolition Permit COMPLETE DEMOLITION
Demo 2 story framed house
Contractor: Remodel Smart LLC
Status: Issued
Nov 22, 2024
Demolition Permit COMPLETE DEMOLITION
Demo 3 story commercial masonry building
Status: Completed
Nov 21, 2024
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. this bid agreement is paid in part or full with american rescue plan act (arpa) funds, all federal regulations apply. 2. remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and
Status: Completed
Nov 21, 2024
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. this bid agreement is paid in part or full with american rescue plan act (arpa) funds, all federal regulations apply. 2. remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and
Status: Completed
Nov 20, 2024
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing. 2. contract term 10 days start date: 11/13/2024, 3:30 pm. contract ending date:
Status: Completed
Nov 14, 2024
Building & Development Application Existing (alteration/addition)
Status: Completed
Nov 13, 2024
Occupant Load Placard Permit NEW
Status: Completed
Nov 12, 2024
ELECTRICAL MINOR ALTERATION
Status: Completed
Nov 5, 2024
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing. 2. contract term 10 days start date: 10/28/2024, 3:30 pm. contract ending date:
Status: Completed
Oct 29, 2024
ELECTRICAL ADDITION / ALTERATION
Roof-mounted solar pv installation 4.100kw dc 10 modules
Contractor: Palmetto Solar, LLC
Status: Completed
Oct 25, 2024
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing. 2. contract term 10 days start date: 10/24/2024, 4 pm. contract ending date: 10/
Status: Completed
Oct 25, 2024
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps, accessory structures and fencing. 2. contract term 10 days start date: 10/23/2024, 11:30 am. contract ending date
Status: Completed
Oct 24, 2024
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps, accessory structures and fencing. 2. contract term 10 days start date: 10/23/2024, 11:30 am. contract ending date:
Status: Completed
Oct 24, 2024
Building & Development Application Existing (alteration/addition)
Replacement of existing retaining wall at front of existing single-family dwelling
Status: Issued
Oct 21, 2024
Building & Development Application Existing (alteration/addition)
Interior renovations to remove casework, tub in bathroom, ceiling repair in existing multi-family.
Status: Completed
Oct 17, 2024
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot. 2. contract term 90 days from award date. 3. achd asbestos application required – survey must be proc
Status: Completed
Oct 15, 2024
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4.
Status: Completed
Oct 15, 2024
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4.
Status: Completed
Oct 15, 2024
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4.
Status: Completed
Oct 15, 2024
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4.
Status: Completed
Oct 15, 2024
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4.
Status: Completed
Oct 15, 2024
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4.
Status: Completed
Oct 15, 2024
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot. 2. contract term 90 days from award date. 3. achd asbestos application required – survey must be procu
Status: Completed
Oct 15, 2024
Demolition Permit COMPLETE DEMOLITION
Demo 2 story masonry apartment building
Status: Completed
Oct 4, 2024
Building & Development Application Existing (alteration/addition)
Status: Issued
Oct 1, 2024
Demolition Permit COMPLETE DEMOLITION
Demo 2 story masonry row house attached one side
Status: Completed
Sep 27, 2024
Demolition Permit COMPLETE DEMOLITION
Demo detached 3 story masonry building
Status: Completed
Sep 26, 2024
Demolition Permit COMPLETE DEMOLITION
Demo townhouse and 2 other attached townhouses on same parcel under related permits
Status: Completed
Sep 23, 2024
Demolition Permit COMPLETE DEMOLITION
Demo townhouse and 2 other attached townhouses on same parcel under related permits
Status: Completed
Sep 23, 2024
Demolition Permit COMPLETE DEMOLITION
Demo townhouse and 2 other attached townhouses on same parcel under related permits
Status: Completed
Sep 23, 2024
Demolition Permit COMPLETE DEMOLITION
Complete demolition of existing single family dwelling
Status: Completed
Sep 23, 2024
Demolition Permit COMPLETE DEMOLITION
Demo 3 story + basement masonry house
Status: Completed
Sep 10, 2024
Demolition Permit COMPLETE DEMOLITION
Demo 2 story single family detached dwelling
Status: Completed
Sep 5, 2024
Building & Development Application Existing (alteration/addition)
Interior non structural demolition for rennovation in apt 17g, replace kitchen cabinets, finishes, flooring, bathroom fixtures and add recessed lighting in 26 story building
Status: Completed
Sep 5, 2024
MECHANICAL ADDITION / ALTERATION
Interior alterations to hvac system for reconfiration of office space and restrooms
Contractor: RuthRauff Sauer LLC
Status: Completed
Sep 4, 2024
Building & Development Application Existing (alteration/addition)
Installation of 6 feet high fence on vacant lot next to owners property
Status: Completed
Aug 27, 2024
Demolition Permit COMPLETE DEMOLITION
Demo 3 story 2 family dwelling, restore site to natural grade
Status: Completed
Aug 19, 2024
Demolition Permit COMPLETE DEMOLITION
Demo 2 story masonry building
Status: Completed
Aug 14, 2024
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps, accessory structures and fencing. 2. contract term 10 days start date: 8/9/2024, 1:30 pm. contract ending date: 8/1
Status: Completed
Aug 9, 2024
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps, accessory structures and fencing. 2. contract term 15 days start date: 8/2/2024, 10:30 am. contract ending date: 8
Status: Completed
Aug 2, 2024
Demolition Permit COMPLETE DEMOLITION
Demo house and detached shed
Status: Completed
Jul 19, 2024
Floodplain Permit Non-substantial Improvement
8' high fence
Status: Completed
Jul 19, 2024
Demolition Permit COMPLETE DEMOLITION
Demo burned 3 story + basement house
Status: Completed
Jul 8, 2024
Demolition Permit COMPLETE DEMOLITION
Demo single story house with rear deck
Status: Completed
Jul 8, 2024
Demolition Permit COMPLETE DEMOLITION
Demo single family 2 story house, site work
Status: Completed
Jun 25, 2024
BUILDING ADDITION / ALTERATION
Reconfiguration and renovation of portion of 26th floor offices and restrooms
Status: Completed
Jun 24, 2024
ELECTRICAL ADDITION / ALTERATION
Installation of (2) 800a disconnects 277/480 ph.4/w for service upgrade.
Status: Completed
Jun 20, 2024
Demolition Permit COMPLETE DEMOLITION
Demo house and detached garage
Status: Completed
Jun 18, 2024
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps, accessory structures and fencing. 2. contract term 10 days start date: 6/17/2024, 10:30 am. contract ending date: 6
Status: Completed
Jun 18, 2024
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps, accessory structures and fencing. 2. contract term 10 days start date: 6/17/2024, 10:30 am. contract ending date:
Status: Completed
Jun 18, 2024
Demolition Permit COMPLETE DEMOLITION
Demo 2 story masonry house
Status: Completed
Jun 14, 2024
Demolition Permit COMPLETE DEMOLITION
Demo existing multi dwelling building and site
Status: Issued
Jun 12, 2024
Demolition Permit COMPLETE DEMOLITION
Demo existing wood 2 story house
Status: Completed
May 15, 2024
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps, accessory structures and fencing. 2. contract term 10 days start date: 5/8/2024, 10:30 am. contract ending date: 5/
Status: Completed
May 8, 2024
Fire Alarm Permit ADDITION / ALTERATION
Circuit wiring, notification device in tenant fit-out on 2nd floor related to bp-2024-02896.
Contractor: Clista Electric Inc
Status: Completed
May 8, 2024
Demolition Permit COMPLETE DEMOLITION
Demo masonry church
Status: Completed
May 3, 2024
MECHANICAL ADDITION / ALTERATION
Alterations to existing mechanical system that includes the installation of new vavs, two split systems with rooftop condensers, two environmental exhaust systems, supply and return air ducts connecting to existing duct, and thermostatic co
Status: Completed
May 3, 2024
Demolition Permit COMPLETE DEMOLITION
Demo masonry house
Status: Completed
Apr 30, 2024
Demolition Permit COMPLETE DEMOLITION
Complete demolition of two to three-story building with basement.
Status: Completed
Apr 24, 2024
Demolition Permit COMPLETE DEMOLITION
Complete demolition of four-story building with basement.
Status: Completed
Apr 24, 2024
Suppression System Permit MINOR ALTERATION
Status: Completed
Apr 17, 2024
Plan Review Meeting
Code interpretation regarding application of iebc sec. 805.2 exception 2
Status: Completed
Apr 16, 2024
BUILDING ADDITION / ALTERATION
Interior alterations that include toilet facility improvements and the removal of demising wall for tenant fit-out expansion.
Status: Completed
Apr 9, 2024
Floodplain Permit Non-substantial Improvement
Replace fire alarm
Status: Completed
Apr 4, 2024
ELECTRICAL ADDITION / ALTERATION
Alterations to existing electrical system that includes new feeders from main distribution panel, installation of uninterruptible power supply, transformer, panelboards, power, lighting and data related to tenant fit-out.
Contractor: Clista Electric Inc
Status: Completed
Apr 3, 2024
BUILDING ADDITION / ALTERATION
Interior renovation within dwelling unit 3j in existing building. work includes reconfiguation of existing partitions, a new closet, new finishes, and new fixtures.
Status: Issued
Apr 3, 2024
Floodplain Permit Non-substantial Improvement
Temp elec service for temp job trailers
Status: Completed
Mar 27, 2024
Demolition Permit COMPLETE DEMOLITION
Demo commercial building and associated rear shed
Status: Completed
Mar 26, 2024
Demolition Permit COMPLETE DEMOLITION
Demo primary house
Status: Completed
Mar 13, 2024
Demolition Permit COMPLETE DEMOLITION
Complete demolition of existing two-story masonry & wood-framed commercial building, disconnect utilities, basement backfilled, site restored to grade, topsoil & seeded.
Status: Completed
Mar 6, 2024
Demolition Permit COMPLETE DEMOLITION
Partial demolition of 2-story single family dwelling including attached garage in a steep slope parcel with foundation walls to remain
Status: Completed
Mar 1, 2024
Demolition Permit COMPLETE DEMOLITION
Demolition of existing single-family dwelling
Status: Completed
Feb 20, 2024
Demolition Permit COMPLETE DEMOLITION
Demo primary house and detached garage
Status: Completed
Feb 20, 2024
Plan Review Meeting
Questions on code interpretation regarding work scope definitions in the iebc repair vs alteration of various levels and continued occupancy while stairs are not functional during construction
Status: Completed
Feb 15, 2024
BUILDING ADDITION / ALTERATION
Demoliton of acessory structure to create parking pad
Status: Amendment Applicant Revisions
Feb 14, 2024
Demolition Permit COMPLETE DEMOLITION
Demolition of 2-story single-family wood-frame dwelling
Status: Completed
Jan 25, 2024
Demolition Permit COMPLETE DEMOLITION
Complete demolition of existing single-family dwelling
Status: Completed
Jan 18, 2024
Suppression System Permit MINOR ALTERATION
Status: Completed
Jan 11, 2024
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 10 days start date: 1/5/2024, 2 pm. contract ending date: 1/15/2024 2 pm 3. achd asbe
Status: Completed
Jan 8, 2024
MECHANICAL ADDITION / ALTERATION
Alteration to the existing mechanical system in relation to bp-2023-14410. work includes installation of a hydronic chiller for mri and alteration to mri exhaust.
Status: Completed
Jan 5, 2024
MECHANICAL NEW CONSTRUCTION
New two-story structure as single unit (detached) residence with two-car integral garage in basement, 26'-0" x 6'-0" first floor covered porch at front, 16'-0" x 8'-0" first floor deck side, and 8'-0" x 6'-0" second floor balcony.
Status: Completed
Dec 27, 2023
Demolition Permit COMPLETE DEMOLITION
Raze existing 2 story structure.
Status: Completed
Dec 15, 2023
Demolition Permit COMPLETE DEMOLITION
Demolition of existing single-family dwelling
Status: Completed
Dec 13, 2023
BUILDING ADDITION / ALTERATION
Repair to partial foundation wall on west side of building
Status: Issued
Dec 13, 2023
Demolition Permit COMPLETE DEMOLITION
Demolition of existing single-family dwelling
Contractor: Allen Demolition
Status: Completed
Dec 11, 2023
Demolition Permit COMPLETE DEMOLITION
Demolition of existing single-family dwelling
Contractor: Allen Demolition
Status: Completed
Dec 11, 2023
Suppression System Permit MINOR ALTERATION
Status: Completed
Dec 6, 2023
Suppression System Permit ADDITION / ALTERATION
Alteration to existing piping and spray noozle clean agent system
Status: Issued
Dec 4, 2023
ELECTRICAL MINOR ALTERATION
Contractor: Clista Electric Inc
Status: Completed
Nov 22, 2023
MECHANICAL MINOR ALTERATION
Interior renovations, new kitchen, closets, toilet trooms
Status: Completed
Nov 21, 2023
Demolition Permit PARTIAL DEMOLITION
Demolition of two story building on the site
Status: Issued
Nov 17, 2023
BUILDING MINOR ALTERATION
Status: Issued
Nov 15, 2023
Demolition Permit COMPLETE DEMOLITION
Demolish the existing 2 story building on site and infill site to restore natural grade
Status: Completed
Nov 9, 2023
ELECTRICAL MINOR ALTERATION
Contractor: KNK Electric
Status: Issued
Nov 6, 2023
Demolition Permit CITY FUNDED DEMOLITION
See permit# pli-lo-2023-11100: land operations permit - issued 329 glenside st, pittsburgh, pa 15214- (nathan brugere)
Status: Completed
Nov 1, 2023
Demolition Permit COMPLETE DEMOLITION
Demolition of existing single-family dwelling
Status: Completed
Nov 1, 2023
Fire Alarm Permit MINOR ALTERATION
Status: Completed
Nov 1, 2023
Land Operations Permit
Landslide remediation related to city funded demolition including grading and retaining wall
Status: Completed
Nov 1, 2023
Demolition Permit COMPLETE DEMOLITION
Complete demolition of existing single-family dwelling
Status: Completed
Nov 1, 2023
MECHANICAL MINOR ALTERATION
Status: Completed
Oct 31, 2023
Floodplain Permit Non-substantial Improvement
Site demolition to restore natural grade
Status: Completed
Oct 30, 2023
Floodplain Permit Non-substantial Improvement
Demolish existing 2 story warehouse
Status: Completed
Oct 30, 2023
Demolition Permit COMPLETE DEMOLITION
Demolish 2 story masonry commercial building and rear detached one story masonry garage
Status: Completed
Oct 26, 2023
Demolition Permit COMPLETE DEMOLITION
Demolish 2 story office building, detached 1 story shed, and site walls and slab
Status: Completed
Oct 24, 2023
Demolition Permit PARTIAL DEMOLITION
Partial demolition of existing 2- story single-family dwelling
Status: Issued
Oct 17, 2023
Demolition Permit COMPLETE DEMOLITION
Complete primary structure demolition of 3 story masonry building
Status: Issued
Oct 12, 2023
Demolition Permit COMPLETE DEMOLITION
Demolition of exisiting single-family dwelling
Status: Completed
Oct 9, 2023
Demolition Permit COMPLETE DEMOLITION
Demo 2 existing masonry buildings
Status: Completed
Oct 9, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Oct 5, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean
Status: Completed
Oct 5, 2023
ELECTRICAL MINOR ALTERATION
Status: Completed
Oct 5, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean
Status: Completed
Oct 5, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Oct 5, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean
Status: Completed
Oct 5, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean
Status: Completed
Oct 5, 2023
Demolition Permit COMPLETE DEMOLITION
Complete demolition of existing single-family dwelling
Status: Completed
Oct 5, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean
Status: Completed
Oct 3, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Oct 3, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean
Status: Completed
Oct 3, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Oct 2, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean ma
Status: Completed
Oct 2, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Oct 2, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean
Status: Completed
Oct 2, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Oct 2, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Oct 2, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Oct 2, 2023
ELECTRICAL ADDITION / ALTERATION
Interior alterations that include new panel, power, lighting for existing dwelling unit (bp-2023-12614).
Contractor: Ted Neff
Status: Completed
Sep 29, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Sep 28, 2023
BUILDING ADDITION / ALTERATION
Interior alterations to first floor tenant space to change occupancy from r2 dweling unit to b office
Status: Completed
Sep 27, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Sep 26, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Sep 26, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Sep 26, 2023
Demolition Permit COMPLETE DEMOLITION
Demolition of existing single -family dwelling
Status: Completed
Sep 14, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Sep 12, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean
Status: Completed
Sep 12, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Sep 11, 2023
BUILDING MINOR ALTERATION
Contractor: BossPMG
Status: Issued
Sep 11, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Sep 8, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Sep 8, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Sep 8, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 10 days start date: 9/1/2023, 10:30 am. contract ending date: 9/11/2023 10:30 am 3. a
Status: Completed
Sep 5, 2023
Suppression System Permit ADDITION / ALTERATION
Wet sprinkler system for 6th floor tenant fit out
Status: Completed
Aug 29, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean
Status: Completed
Aug 29, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean
Status: Completed
Aug 29, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean
Status: Completed
Aug 29, 2023
BUILDING ADDITION / ALTERATION
Replacement of eight windows
Status: Issued
Aug 29, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Aug 29, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 10 days start date: 8/29/2023, 1:30 pm. contract ending date: 9/8/2023 1:30 pm 3. ac
Status: Completed
Aug 29, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Aug 28, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean ma
Status: Completed
Aug 28, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Aug 28, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Aug 28, 2023
ELECTRICAL NEW CONSTRUCTION
New two-story structure as single unit (detached) residence with two-car integral garage in basement, 26'-0" x 6'-0" first floor covered porch at front, 16'-0" x 8'-0" first floor deck side, and 8'-0" x 6'-0" second floor balcony.
Status: Completed
Aug 28, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Aug 28, 2023
Demolition Permit COMPLETE DEMOLITION
Complete demolition of existing single-family dwelling
Status: Issued
Aug 22, 2023
Demolition Permit COMPLETE DEMOLITION
Demolish 1-story with basement primary structure
Contractor: Hale Demolition
Status: Completed
Aug 21, 2023
BUILDING MINOR ALTERATION
Contractor: Home Depot USA
Status: Completed
Aug 21, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean
Status: Completed
Aug 11, 2023
Demolition Permit COMPLETE DEMOLITION
Demolition of existing single-family dwelling
Status: Completed
Aug 11, 2023
BUILDING ADDITION / ALTERATION
Interior renovations, new kitchen, closets, toilet trooms
Status: Completed
Aug 11, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Aug 11, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Aug 11, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Aug 11, 2023
Floodplain Permit Non-substantial Improvement
Demo single family house and detached garage
Status: Issued
Aug 11, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Aug 11, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Aug 11, 2023
MECHANICAL ADDITION / ALTERATION
Mechanical work for interior renovations on 6th floor for offices in high rise building related to bp-2023-10508
Status: Completed
Aug 10, 2023
ELECTRICAL ADDITION / ALTERATION
Electrical work for interior renovations on 6th floor for offices in high rise building related to bp-2023-10508
Status: Completed
Aug 10, 2023
Sign Permit NEW
One 25 inch tall non-illuminated monumnet sign and one 45 inch tall non-illuminated monument sign
Status: Completed
Aug 10, 2023
Demolition Permit COMPLETE DEMOLITION
Demolition of attached 2 story house with basement to include repairs to party wall
Status: Completed
Aug 9, 2023
Demolition Permit COMPLETE DEMOLITION
Demolition of exisiting single samily dwelling
Status: Completed
Aug 9, 2023
Demolition Permit COMPLETE DEMOLITION
Demolition of existing single-family dwelling
Status: Completed
Aug 9, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 10 days start date: 8/3/2023, 1:00 pm. contract ending date: 813/2023 1:00 pm 3. ach
Status: Completed
Aug 7, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 120 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean
Status: Completed
Aug 1, 2023
BUILDING ADDITION / ALTERATION
Interior renovations on 6th floor for offices in high rise building. work includes new walls, ceilings, raised floors, doors & hardware, casework and finishes
Status: Completed
Aug 1, 2023
Demolition Permit COMPLETE DEMOLITION
Complete demolition of the existing three stories single family dwelling and infill basement to restore natural site grade.
Status: Completed
Jul 25, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 10 days start date: 7/17/2023, 11:30 am. contract ending date: 7/27/2023 11:30 am 3.
Status: Completed
Jul 18, 2023
BUILDING NEW CONSTRUCTION
Construct new 2-story house with basement & integral garage
Status: Completed
Jul 11, 2023
Demolition Permit COMPLETE DEMOLITION
Raze 2 story single family dwelling.
Status: Completed
Jul 10, 2023
Demolition Permit COMPLETE DEMOLITION
Complete demolition of existing single-family dwelling
Contractor: ASAP Roofing Pros
Status: Completed
Jul 7, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Jun 28, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Jun 28, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Jun 28, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Jun 28, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Jun 28, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Jun 28, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Jun 28, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Jun 28, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean ma
Status: Completed
Jun 28, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 10 days start date: 6/23/2023, 8:45 am. contract ending date: 7/3/2023 8:45 am 3. ach
Status: Completed
Jun 26, 2023
Demolition Permit COMPLETE DEMOLITION
Complete demolition of existing single-family dwelling
Status: Completed
Jun 23, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Jun 22, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Jun 22, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Jun 22, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Jun 22, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Jun 22, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Jun 22, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Jun 22, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean
Status: Completed
Jun 22, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Jun 22, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
Jun 22, 2023
Demolition Permit COMPLETE DEMOLITION
Demolition of existing one story structure.
Status: Completed
Jun 21, 2023
Floodplain Permit Non-substantial Improvement
Demo attached house
Status: Completed
Jun 20, 2023
Demolition Permit COMPLETE DEMOLITION
Complete demolition of existing 3-story, single-family dwelling building.
Status: Issued
Jun 20, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 10 days start date: 6/15/2023, 8:00 am. contract ending date: 6/25/2023 8:00 am 3. ac
Status: Completed
Jun 18, 2023
Demolition Permit COMPLETE DEMOLITION
Demolish two story single family dwelling
Status: Completed
Jun 7, 2023
Demolition Permit COMPLETE DEMOLITION
Complete demolition of existing single family dwelling
Status: Completed
Jun 2, 2023
BUILDING ADDITION / ALTERATION
Emergency stabilization of the existing rear and right retaining walls that were recently exposed due to the demolition of the building on site. the stabilization work scope is to include the installation of new gravity style retaining wall
Status: Completed
Jun 1, 2023
ELECTRICAL MINOR ALTERATION
Contractor: John Bean
Status: Completed
Jun 1, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 10 days start date: 5/31/2023, 9:00 am. contract ending date: 6/10/2023 9:00 am 3. a
Status: Completed
May 31, 2023
Demolition Permit COMPLETE DEMOLITION
Complete demolition of 3-story residential structure
Contractor: Dominic Scoglietti
Status: Issued
May 31, 2023
Occupant Load Placard Permit Revised Occupant Load
Status: Completed
May 31, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 10 days start date: 5/31/2023, 9:00 am. contract ending date: 6/10/2023 9:00 am 3. ac
Status: Completed
May 31, 2023
ELECTRICAL ADDITION / ALTERATION
Interior alterations to electrical system for condominium unit. work includes new panelboard(s), rewiring of branch circuits, lighting & power devices.
Status: Completed
May 30, 2023
ELECTRICAL ADDITION / ALTERATION
Interior alterations to electrical system for condominium unit. work includes new panelboard(s), rewiring, lighting & power devices.
Status: Completed
May 30, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean
Status: Completed
May 24, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
May 23, 2023
Demolition Permit COMPLETE DEMOLITION
Demo primary residence; the attached house at 82 44th street is under dp-2023-01432 and will be demolished with this house.
Status: Completed
May 23, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean
Status: Completed
May 23, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
May 23, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean m
Status: Completed
May 23, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days from award date. 3. achd asbestos application required – survey included 4. void to be filled with clean
Status: Completed
May 23, 2023
Demolition Permit COMPLETE DEMOLITION
Demo primary residence; the attached house at 80 44th street is under dp-2022-13945 and will be demolished with this house.
Status: Issued
May 23, 2023
Occupancy Only Permit TEMPORARY USE
Status: Completed
May 19, 2023
MECHANICAL ADDITION / ALTERATION
Furnace/air conditioner for residential unit in highrise in existing ductwork including new condenser on roof
Contractor: Beam Heating & A/C
Status: Completed
May 19, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 10 days start date: 5/18/2023, 1:00 pm. contract ending date: 5/28/2023 1:00 pm 3. ac
Status: Completed
May 19, 2023
Occupancy Only Permit Permanent Use
Status: Issued
May 19, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 10 days start date: 5/18/2023, 1:00 pm. contract ending date: 5/28/2023 1:00 pm 3. ac
Status: Completed
May 19, 2023
MECHANICAL ADDITION / ALTERATION
Interior & exterior alterations to mechanical system for conominium unit renovation.
Contractor: Bolster-Dehart Inc
Status: Completed
May 11, 2023
MECHANICAL ADDITION / ALTERATION
Interior & exterior alterations to mechanical system for conominium unit renovation.
Contractor: Bolster-Dehart Inc
Status: Completed
May 11, 2023
Demolition Permit COMPLETE DEMOLITION
Demoliton of existing single family dwelling
Status: Completed
May 10, 2023
BUILDING ADDITION / ALTERATION
Emergency stabilization of first and second-floor framing to allow for further evaluation of the party wall and rear wall. this evaluation was deemed necessary to verify if continued demolition can occur or if additional shoring/repair is n
Status: Completed
May 10, 2023
Suppression System Permit ADDITION / ALTERATION
Add clean agent system in white room.
Status: Completed
May 8, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 10 days start date: 5/5/2023, 2:30 pm. contract ending date: 5/15/2023 2:30 pm 3. ach
Status: Completed
May 8, 2023
Storm Water Permit
Demolition of one and two-story structure
Contractor: Noralco Corporation
Status: Completed
May 5, 2023
BUILDING MINOR ALTERATION
Status: Completed
May 5, 2023
Suppression System Permit MINOR ALTERATION
Status: Completed
May 5, 2023
Demolition Permit COMPLETE DEMOLITION
Compltete demolition of existing single-family dwelling
Status: Completed
May 2, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 90 days start date: date of contract award 3. achd asbestos application required – survey included 4. void to be f
Status: Completed
May 1, 2023
BUILDING ADDITION / ALTERATION
Installation of decorative metal structure accessory to a museum on adjacent parcel
Status: Completed
May 1, 2023
Fire Alarm Permit NEW SYSTEM
Installfire alarm panel, circuit wiring, and devices for interior alterations to create salon at existing 23 story building - related to bp-2022-04681
Contractor: FM Electric
Status: Completed
May 1, 2023
Suppression System Permit MINOR ALTERATION
Status: Completed
Apr 28, 2023
Suppression System Permit ADDITION / ALTERATION
Remove existing wet sprinkler piping & add new preauction sprinkler system.
Status: Issued
Apr 26, 2023
Suppression System Permit MINOR ALTERATION
Status: Issued
Apr 19, 2023
ELECTRICAL MINOR ALTERATION
Status: Issued
Apr 17, 2023
Demolition Permit COMPLETE DEMOLITION
Complete demolition of existing single family dwelling
Status: Completed
Apr 14, 2023
Sign Permit NEW
Illuminated wall sign 79.80 sq ft at 50'-0" above grade
Contractor: NMB Signs, Inc.
Status: Issued
Apr 14, 2023
Suppression System Permit ADDITION / ALTERATION
Renovation of existing sprinkler system for interior alteration of existing space for new tenant fit-out on 18th floor related to bp-2022-18485
Status: Completed
Apr 14, 2023
Demolition Permit COMPLETE DEMOLITION
Complete demolition of existing single family dwelling (condemned structure)
Status: Issued
Apr 14, 2023
Demolition Permit COMPLETE DEMOLITION
Demolition of exisiting primary structre
Status: Completed
Apr 14, 2023
Fire Alarm Permit ADDITION / ALTERATION
Fire alarm for renovated corridor, electric room, lobby, janitor closet & multi use toilet rooms change from horn/strobe to speakers and speaker/strobes.
Contractor: Clista Electric Inc
Status: Completed
Apr 13, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Apr 12, 2023
Demolition Permit COMPLETE DEMOLITION
Complete demolition of existing single-family dwelling
Status: Completed
Apr 12, 2023
Demolition Permit COMPLETE DEMOLITION
Complete demolition of existing single-family dwelling
Status: Completed
Apr 12, 2023
Demolition Permit COMPLETE DEMOLITION
Complete demolition of existing single family dwelling
Status: Issued
Apr 11, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 10 days start date: 4/2/2023, 12:00 pm. contract ending date: 4/12/2023 12:00 pm 3. a
Status: Completed
Apr 4, 2023
Demolition Permit COMPLETE DEMOLITION
Raze existing one story commercial building and accessory portions at rear
Status: Issued
Apr 3, 2023
ELECTRICAL ADDITION / ALTERATION
Electrical for interior renovation of condo unit in highrise consisting of new lighting and outlets
Status: Completed
Mar 31, 2023
Demolition Permit COMPLETE DEMOLITION
Complete demolition of existing single family dwelling
Status: Revoked
Mar 29, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 20 days start date: 3/24/2023, 3:00 pm. contract ending date: 4/13/2023 3:00 pm 3. ac
Status: Completed
Mar 27, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 20 days start date: 3/24/2023, 3:00 pm. contract ending date: 4/13/2023 3:00 pm 3. ac
Status: Completed
Mar 27, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 20 days start date: 3/24/2023, 3:00 pm. contract ending date: 4/13/2023 3:00 pm 3. ac
Status: Completed
Mar 27, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 20 days start date: 3/24/2023, 3:00 pm. contract ending date: 4/13/2023 3:00 pm 3. ac
Status: Completed
Mar 27, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 20 days start date: 3/24/2023, 3:00 pm. contract ending date: 4/13/2023 3:00 pm 3. ac
Status: Completed
Mar 27, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 20 days start date: 3/25/2023, 3:00 pm. contract ending date: 4/14/2023 3:00 pm 3. ac
Status: Completed
Mar 27, 2023
ELECTRICAL MINOR ALTERATION
Sign electrical
Contractor: John Bean
Status: Completed
Mar 21, 2023
ELECTRICAL ADDITION / ALTERATION
Electrical for interior renovation of suite 160 as a beauty salon including circuits, wiring, equipment, and lighting
Contractor: FM Electric
Status: Completed
Mar 16, 2023
Demolition Permit COMPLETE DEMOLITION
Complete demolition of existing single family dwelling
Status: Completed
Mar 14, 2023
BUILDING ADDITION / ALTERATION
Interior alterations to conominium unit. work includes new walls, ceilings, doors & hardware, finishes as well as new kitchen & bath rooms
Status: Completed
Mar 8, 2023
BUILDING ADDITION / ALTERATION
Interior alterations to conominium unit. work includes new walls, ceilings, doors & hardware, finishes as well as new kitchen & bath rooms
Status: Completed
Mar 8, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 10 days start date: 3/3/2023, 3:00 pm. contract ending date: 3/13/2023, 3:00 pm 3. a
Status: Completed
Mar 6, 2023
Fire Alarm Permit MINOR ALTERATION
Status: Completed
Mar 3, 2023
ELECTRICAL ADDITION / ALTERATION
Lighting, wiring & panel in renovated corridor, electric room, lobby, janitor closet & multi use toilet rooms in partial terrace level.
Contractor: Clista Electric Inc
Status: Completed
Mar 1, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 10 days start date: 2/28/2023, 10:30 am. contract ending date: 3/10/2023, 10:30 am 3.
Status: Completed
Mar 1, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 10 days start date: 2/23/2023, 1 pm. contract ending date: 2/23/2023, 1 pm 3. achd as
Status: Completed
Feb 24, 2023
ELECTRICAL MINOR ALTERATION
Contractor: Lewis McCullough
Status: Completed
Feb 24, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 10 days start date: 2/23/2023, 1 pm. contract ending date: 2/23/2023, 1 pm 3. achd as
Status: Completed
Feb 24, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 10 days start date: 2/23/2023, 1 pm. contract ending date: 2/23/2023, 1 pm 3. achd as
Status: Completed
Feb 24, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 10 days start date: 2/23/2023, 1 pm. contract ending date: 2/23/2023, 1 pm 3. achd a
Status: Completed
Feb 24, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 10 days start date: 2/23/2023, 1 pm. contract ending date: 2/23/2023, 1 pm 3. achd as
Status: Completed
Feb 24, 2023
MECHANICAL ADDITION / ALTERATION
Mechancial system for interior alteration of existing space for new tenant fit-out on 18th floor related to bp-2022-18485
Contractor: RuthRauff Sauer LLC
Status: Completed
Feb 23, 2023
Sign Permit NEW
High sign of flush illuminated chanel letters
Contractor: NMB Signs, Inc.
Status: Completed
Feb 17, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 10 days start date: 2/16/2023, 1 pm. contract ending date: 2/26/2023, 1 pm 3. achd as
Status: Completed
Feb 17, 2023
Demolition Permit COMPLETE DEMOLITION
Complete demolition of single family dwelling attached to single family dwelling, demo of attached is dp-2022-17772
Status: Completed
Feb 14, 2023
Demolition Permit COMPLETE DEMOLITION
Complete demolition of single family dwelling attached to single family dwelling, demo of attached is dp-2022-19813
Status: Completed
Feb 14, 2023
Fire Alarm Permit ADDITION / ALTERATION
New notification devices and related modifications to an existing voice/alarm system as part of alterations to a 3rd floor data center
Contractor: Kirby Electric
Status: Completed
Feb 14, 2023
ELECTRICAL ADDITION / ALTERATION
Electrical work to interior alteration of existing space for new tenant fit-out on 18th floor related to bp-2022-18485
Status: Completed
Feb 13, 2023
BUILDING ADDITION / ALTERATION
Interior renovation to 5384sf corridor, electric room, lobby, janitor closet & multi use toilet rooms in partial terrace level. no change in occupancy.
Status: Issued
Feb 9, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 10 days start date: 2/3/2023, 12 pm. contract ending date: 2/13/2023 12 pm 3. achd as
Status: Completed
Feb 7, 2023
BUILDING MINOR ALTERATION
Status: Issued
Feb 7, 2023
Demolition Permit COMPLETE DEMOLITION
Complete demolition of a 3-story single family dwelling
Status: Completed
Feb 1, 2023
BUILDING ADDITION / ALTERATION
Interior alteration of existing space for new tenant fit-out on 18th floor
Contractor: Massaro Company
Status: Completed
Jan 31, 2023
MECHANICAL ADDITION / ALTERATION
New mechanical ductwork, hvac (heat recovery) system, fuel gas piping, diffusers, etc as needed for the new tenant fitout layout.
Status: Completed
Jan 30, 2023
BUILDING ADDITION / ALTERATION
Interior renovation of condo unit in highrise
Status: Completed
Jan 30, 2023
ELECTRICAL ADDITION / ALTERATION
Installation of roof mounted solar panels - (11) 400w solar panels, (11) enphase microinverters, (1) combiner box, (1) 60amp ac fused disconnect with 20amp fuses; tie in method - line side taps system size ----> 4.4 kw
Contractor: Suntuity Solar LLC
Status: Completed
Jan 30, 2023
Fire Alarm Permit ADDITION / ALTERATION
Devices in renovated 18,000 sf new tenant fit out for office, wet lab on 2nd floor of nova place.
Contractor: Clista Electric Inc
Status: Completed
Jan 26, 2023
ELECTRICAL ADDITION / ALTERATION
Replace roofing, flashing on c & d wing & portion of roof on upmc presbyterian
Status: Issued
Jan 26, 2023
Suppression System Permit MINOR ALTERATION
Status: Completed
Jan 19, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 45 days start date: 11/22/2022, 9 am. contract ending date: 1/6/2023 9 am 3. achd asbestos appl
Status: Completed
Jan 18, 2023
BUILDING ADDITION / ALTERATION
Interior alterations to conominium unit. work includes new walls, ceilings, doors & hardware, finishes as well as new kitchen & bath rooms
Status: Revoked
Jan 18, 2023
BUILDING ADDITION / ALTERATION
Interior alterations to conominium unit. work includes new walls, ceilings, doors & hardware, finishes as well as new kitchen & bath rooms
Status: Revoked
Jan 18, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. contract term: 120 days bid award date. 2. contract must be signed within 3 days of winning bid or it will be awarded to the next lowest bidder. 3. contractor must adhere to the overall site plan laid out in appe
Status: Completed
Jan 17, 2023
Demolition Permit COMPLETE DEMOLITION
Complete demolition of existing single family dwelling
Status: Completed
Jan 17, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. contract term: 120 days bid award date. 2. contract must be signed within 3 days of winning bid or it will be awarded to the next lowest bidder. 3. contractor must adhere to the overall site plan laid out in appe
Status: Completed
Jan 17, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. contract term: 120 days bid award date. 2. contract must be signed within 3 days of winning bid or it will be awarded to the next lowest bidder. 3. contractor must adhere to the overall site plan laid out in appe
Status: Completed
Jan 17, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demoltion 1. contract term: 120 days bid award date. 2. contract must be signed within 3 days of winning bid or it will be awarded to the next lowest bidder. 3. contractor must adhere to the overall site plan laid out in appendi
Status: Completed
Jan 17, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. contract term: 120 days bid award date. 2. contract must be signed within 3 days of winning bid or it will be awarded to the next lowest bidder. 3. contractor must adhere to the overall site plan laid out in appe
Status: Completed
Jan 17, 2023
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. contract term: 120 days bid award date. 2. contract must be signed within 3 days of winning bid or it will be awarded to the next lowest bidder. 3. contractor must adhere to the overall site plan laid out in appe
Status: Completed
Jan 17, 2023
ELECTRICAL MINOR ALTERATION
Contractor: Sargent Electric Co
Status: Completed
Jan 9, 2023
BUILDING NEW CONSTRUCTION
Exterior site work to install secondary parking area and dumpster enclosure at rear of existing hardware store
Contractor: CBF Contracting Inc
Status: Issued
Jan 6, 2023
Demolition Permit COMPLETE DEMOLITION
Demolition of fire damaged structure
Status: Issued
Jan 4, 2023
ELECTRICAL ADDITION / ALTERATION
Lighting, wiring in renovated 2nd floor of nova place.
Contractor: Clista Electric Inc
Status: Completed
Dec 30, 2022
Suppression System Permit MINOR ALTERATION
Status: Completed
Dec 28, 2022
MECHANICAL ADDITION / ALTERATION
Ductwork & interior equipment in renovated 2nd floor of nova place...related to bp-2022-17214.
Status: Completed
Dec 27, 2022
MECHANICAL ADDITION / ALTERATION
Ductwork & exhaust system in suite 160 as a beauty salon in the 23-story.
Contractor: Home Mechanix LLC
Status: Completed
Dec 22, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 10 days start date: 12/14/2022, 12:00 pm. contract ending date: 12/24/2022 12:00 pm
Status: Completed
Dec 16, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 10 days start date: 12/14/2022, 12:00 pm. contract ending date: 12/24/2022 12:00 pm 3
Status: Completed
Dec 16, 2022
BUILDING ADDITION / ALTERATION
Exterior alterations & addition for new vestibule at existing building entrance. work includes alum & glass entrance vestibule addition as well as signage and equipment to support trafic reconfiguration.
Status: Completed
Dec 15, 2022
Suppression System Permit MINOR ALTERATION
Status: Completed
Dec 13, 2022
ELECTRICAL ADDITION / ALTERATION
New wiring, lighting, power devices, panelboards, and an interior transformer work scope that correlates with the new tenant fit-out.
Status: Completed
Dec 12, 2022
ELECTRICAL ADDITION / ALTERATION
Lighting & wiring in renovated retail kiosk.
Status: Completed
Dec 8, 2022
BUILDING ADDITION / ALTERATION
Emergency stabilization of the left side of the 249 s 38th st structure as related to the partial collapse and demolition of the 239 s 38th st structures. stabilization includes reconstruction of an existing brick exterior wall with a new m
Status: Completed
Dec 7, 2022
Fire Alarm Permit ADDITION / ALTERATION
New fire alarm devices (4 strobes)
Status: Completed
Dec 6, 2022
BUILDING ADDITION / ALTERATION
Interior alteration of existing core and shell space for new tenant fit-out.
Status: Completed
Dec 5, 2022
Demolition Permit COMPLETE DEMOLITION
Complete demolition of 2 story single family dwelling on site
Status: Completed
Dec 2, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 10 days start date: 12/1/2022, 3 pm. contract ending date: 12/11/2022 3 pm 3. achd as
Status: Completed
Dec 2, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 45 days start date: 11/22/2022, 9 am. contract ending date: 1/6/2023 9 am 3. achd asbestos appl
Status: Issued
Dec 1, 2022
BUILDING ADDITION / ALTERATION
Interior renovation to 18,000 sf new tenant fit out for office, wet lab on 2nd floor of nova place.
Status: Completed
Dec 1, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 45 days start date: 11/22/2022, 9 pm. contract ending date: 1/6/2023 9 pm 3. achd asbestos appl
Status: Completed
Dec 1, 2022
BUILDING MINOR ALTERATION
Status: Completed
Dec 1, 2022
Demolition Permit COMPLETE DEMOLITION
Complete demolition of existing single family dwelling
Status: Completed
Nov 30, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 45 days start date: 11/22/2022, 9 am. contract ending date: 1/6/2023 9 am 3. achd asbestos appl
Status: Completed
Nov 28, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 45 days start date: 11/22/2022, 9 am. contract ending date: 1/6/2023 9 am 3. achd asbestos appl
Status: Completed
Nov 28, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 45 days start date: 11/22/2022, 9 am. contract ending date: 1/6/2023 9 am 3. achd asbestos app
Status: Completed
Nov 28, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 45 days start date: 11/22/2022, 9 am. contract ending date: 1/6/2023 9 am 3. achd asbestos appl
Status: Completed
Nov 23, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 45 days start date: 11/22/2022, 9 am. contract ending date: 1/6/2023 9 am 3. achd asbestos appl
Status: Completed
Nov 23, 2022
BUILDING ADDITION / ALTERATION
Renovation of retail kiosk
Status: Completed
Nov 22, 2022
Demolition Permit COMPLETE DEMOLITION
Demoliton of exisitng 2-story two-family dwelling. accessory garage to remain
Contractor: Dominic Scoglietti
Status: Issued
Nov 21, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 45 days start date: 11/9/2022, 12:30 pm. contract ending date: 12/28/2022 12:30 pm 3. achd asbe
Status: Completed
Nov 17, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 45 days start date: 11/9/2022, 12:30 pm. contract ending date: 12/28/2022 12:30 pm 3. achd asbes
Status: Completed
Nov 17, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 45 days start date: 11/9/2022, 12:30 pm. contract ending date: 12/28/2022 12:30 pm 3. achd asbe
Status: Completed
Nov 14, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 45 days start date: 11/9/2022, 12:30 pm. contract ending date: 12/28/2022 12:30 pm 3. remove an
Status: Completed
Nov 14, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 45 days start date: 11/9/2022, 12:30 pm. contract ending date: 12/28/2022 12:30 pm 3. achd asb
Status: Completed
Nov 14, 2022
Demolition Permit COMPLETE DEMOLITION
Comeplete demolition of exisiting single family dwelling
Status: Completed
Nov 14, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 45 days start date: 11/9/2022, 12:30 pm. contract ending date: 12/28/2022 12:30 pm 3. remove ac
Status: Completed
Nov 10, 2022
Demolition Permit COMPLETE DEMOLITION
Complete demolition of existing single family dwelling
Contractor: ASAP Roofing Pros
Status: Completed
Nov 10, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 45 days start date: 11/9/2022, 12:30 pm. contract ending date: 12/28/2022 12:30 pm 3. achd asb
Status: Completed
Nov 10, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 45 days start date: 11/9/2022, 12:30 pm. contract ending date: 12/28/2022 12:30 pm 3. achd asb
Status: Completed
Nov 10, 2022
Demolition Permit COMPLETE DEMOLITION
Demolish one and 2-story primary structure
Contractor: Noralco Corporation
Status: Completed
Nov 3, 2022
Demolition Permit COMPLETE DEMOLITION
Demolition of existing single family detached dwelling
Status: Completed
Nov 2, 2022
Demolition Permit COMPLETE DEMOLITION
Demolition of existing single family detached dwelling
Status: Completed
Nov 2, 2022
Demolition Permit COMPLETE DEMOLITION
Complete demolition of existing single family dwelling
Status: Completed
Nov 1, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 15 days start date: 10/27/2022, 10:30 am. contract ending date: 11/11/2022 10:30 am 3
Status: Completed
Nov 1, 2022
Demolition Permit CITY FUNDED DEMOLITION
1.emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2.contract term 15 days start date: 10/27/2022, 10:30 am. contract ending date: 11/11/2022 10:30 am 3.achd asbestos application
Status: Completed
Nov 1, 2022
Suppression System Permit ADDITION / ALTERATION
Extend existing dry sprinkler system to previously unsprinkererd garage on level 2b area (dry system zone 7 & 11)
Status: Completed
Oct 26, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 10 days start date: 10/21/2022, 1:45 pm. contract ending date: 10/31/2022 1:45 pm 3.
Status: Completed
Oct 25, 2022
ELECTRICAL ADDITION / ALTERATION
Interior non structural alterations. new lighting, low voltage system and power device
Status: Issued
Oct 20, 2022
Land Operations Permit
Installation of soldier pile retaining wall and site work
Status: Issued
Oct 19, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts w
Status: Completed
Oct 19, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. fence off entire work area prior to start of demolition 5. lot s
Status: Completed
Oct 19, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. fence off entire work area prior to start of demolition 5. lot sh
Status: Completed
Oct 19, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Oct 19, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Oct 19, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Oct 17, 2022
Suppression System Permit ADDITION / ALTERATION
Sprinkler heads in 11th floor 1104.
Status: Completed
Oct 17, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Oct 17, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Oct 17, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Oct 17, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Oct 17, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Oct 17, 2022
Demolition Permit COMPLETE DEMOLITION
Demolition of primary structure - 3 story + basement commercial structure with portions of basement walls to remain to retain earth
Status: Completed
Oct 11, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 10 days start date: 10/7/2022, 2:30 pm. contract ending date: 10/17/2022 2:30 pm 3. a
Status: Completed
Oct 11, 2022
Demolition Permit COMPLETE DEMOLITION
Demolition of primary structure - 3 story + basement commercial structure with portions of basement walls to remain to retain earth
Status: Completed
Oct 11, 2022
Demolition Permit PARTIAL DEMOLITION
Demolition of existing single family dwelling
Contractor: Dominic Scoglietti
Status: Issued
Oct 7, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. fence off entire work area prior to start of demolition 5. lot
Status: Completed
Oct 3, 2022
Demolition Permit COMPLETE DEMOLITION
Demolish two story single family detached dwelling on site
Status: Completed
Sep 30, 2022
Fire Alarm Permit MINOR ALTERATION
Status: Completed
Sep 27, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Sep 26, 2022
MECHANICAL MINOR ALTERATION
Status: Completed
Sep 26, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Sep 21, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Sep 21, 2022
Demolition Permit COMPLETE DEMOLITION
Complete demolition of existing single family dwelling .
Status: Completed
Sep 15, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Sep 14, 2022
Demolition Permit COMPLETE DEMOLITION
Complete demolition of existing single family dwelling
Status: Completed
Sep 14, 2022
Demolition Permit COMPLETE DEMOLITION
Complete demolition of 2-story single family dwelling
Status: Completed
Sep 14, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. emergency curb-side demolition. remove all garbage and debris, vegetation, concrete slabs, steps and fencing. 2. contract term 10 days start date: 9/13/2022, 1:00 pm. contract ending date: 9/23/2022 1:00 pm 3. re
Status: Completed
Sep 13, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Sep 9, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Sep 9, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Sep 9, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it divert
Status: Completed
Sep 9, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. remove garage. 5. lot shall be cleared to match adjacent lots,
Status: Completed
Sep 9, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Sep 9, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Sep 9, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Sep 9, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Sep 9, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Sep 9, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Sep 7, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Sep 7, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Sep 7, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Sep 7, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Sep 7, 2022
BUILDING MINOR ALTERATION
Status: Completed
Sep 6, 2022
ELECTRICAL MINOR ALTERATION
Construct new ten story commercial structure- foundation and superstructure for 5th and halket innovation research tower
Status: Completed
Sep 6, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Sep 2, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Sep 2, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Sep 2, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Sep 2, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Sep 2, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Sep 1, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Sep 1, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Sep 1, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Sep 1, 2022
BUILDING MINOR ALTERATION
Contractor: Gunton Corp
Status: Issued
Sep 1, 2022
Demolition Permit CITY FUNDED DEMOLITION
City funded demolition 1. remove all vegetation, debris, steps, fences & concrete slabs 2. asbestos survey included –notification of achd required. 3. 90 day contract. 4. lot shall be cleared to match adjacent lots, so that it diverts
Status: Completed
Aug 31, 2022

Check permits at another Pittsburgh address

Free instant lookup, no signup.

Search Pittsburgh permits →
Disclaimer: Permit data comes from Pittsburgh's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the Pittsburgh building department before buying, selling, or planning work.